Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Broken bridge anchor bolt for fixing steel wire mesh of fabricated composite wallboard
The invention belongs to the field of building materials, and provides a broken bridge anchor bolt for fixing a steel wire mesh of a fabricated composite wallboard, the broken bridge anchor bolt comprises a fixing rod, and the top of the fixing rod is provided with a fixing disc; mortar is used for pouring, the mortar can penetrate through the interior of the first fixing hole during pouring, the fixing rod and the fixing disc can be reinforced through mutual cooperation of the first fixing hole and the solidified mortar, then the firmness of the device is improved, and the PP material is used, so that the overall weight of parts can be reduced, and the practicability of the device is improved. Products can be produced according to an assembly line form; according to the steel wire mesh fixing device, a steel wire mesh is placed in the containing groove, the steel wire mesh is clamped through the buckles after being placed, an operator can conveniently and rapidly fix and install the steel wire mesh, the operator does not need to use other tools to install the steel wire mesh, and then the convenience of the operator during installation is improved.
本发明属于建筑材料领域,提供了一种装配式复合墙板固定钢丝网片的断桥锚栓,包括固定杆,所述固定杆的顶部设置有固定盘;本发明通过利用砂浆进行浇筑,在浇筑时砂浆会穿过第一固定孔的内部,利用第一固定孔和凝固后的砂浆相互配合可以对固定杆和固定盘进行加固,进而提高了装置的牢固性,并且利用PP材质不但可以降低零部件整体的重量,还使得产品可以按照流水线的形式进行生产;本发明通过将钢丝网放置到放置槽的内部,放置后利用卡扣对钢丝网进行卡合,便于操作人员快速的对钢丝网进行固定安装,无需操作人员再去使用其他的工具去对钢丝网进行安装,进而提高了操作人员在安装时的便捷性。
Broken bridge anchor bolt for fixing steel wire mesh of fabricated composite wallboard
The invention belongs to the field of building materials, and provides a broken bridge anchor bolt for fixing a steel wire mesh of a fabricated composite wallboard, the broken bridge anchor bolt comprises a fixing rod, and the top of the fixing rod is provided with a fixing disc; mortar is used for pouring, the mortar can penetrate through the interior of the first fixing hole during pouring, the fixing rod and the fixing disc can be reinforced through mutual cooperation of the first fixing hole and the solidified mortar, then the firmness of the device is improved, and the PP material is used, so that the overall weight of parts can be reduced, and the practicability of the device is improved. Products can be produced according to an assembly line form; according to the steel wire mesh fixing device, a steel wire mesh is placed in the containing groove, the steel wire mesh is clamped through the buckles after being placed, an operator can conveniently and rapidly fix and install the steel wire mesh, the operator does not need to use other tools to install the steel wire mesh, and then the convenience of the operator during installation is improved.
本发明属于建筑材料领域,提供了一种装配式复合墙板固定钢丝网片的断桥锚栓,包括固定杆,所述固定杆的顶部设置有固定盘;本发明通过利用砂浆进行浇筑,在浇筑时砂浆会穿过第一固定孔的内部,利用第一固定孔和凝固后的砂浆相互配合可以对固定杆和固定盘进行加固,进而提高了装置的牢固性,并且利用PP材质不但可以降低零部件整体的重量,还使得产品可以按照流水线的形式进行生产;本发明通过将钢丝网放置到放置槽的内部,放置后利用卡扣对钢丝网进行卡合,便于操作人员快速的对钢丝网进行固定安装,无需操作人员再去使用其他的工具去对钢丝网进行安装,进而提高了操作人员在安装时的便捷性。
Broken bridge anchor bolt for fixing steel wire mesh of fabricated composite wallboard
一种装配式复合墙板固定钢丝网片的断桥锚栓
LI ZHONGMING (Autor:in) / LV DECHUN (Autor:in) / LI XIANGDONG (Autor:in)
26.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Broken bridge hollow steel mesh internal mold wallboard
Europäisches Patentamt | 2020
|Steel wire mesh carrying assembly, composite wallboard and wallboard construction method
Europäisches Patentamt | 2021
|Bolt connection thermal bridge node of fabricated wallboard structure
Europäisches Patentamt | 2023
|