Construction method of rockfill dam filling vibration roller
The construction method comprises the following steps that firstly, vibration rollers are arranged, a rock-fill dam area is divided, the number of the vibration rollers is selected according to the division content, and the moving routes of the vibration rollers are set; 2, the construction area is cleaned, and the divided area is cleaned; step 3, paving materials layer by layer, and selecting one or more materials for filling according to construction requirements; and step 4, measuring and checking: carrying out gridding measurement on the material filled in the area to ensure the flatness, and carrying out vibration grinding operation. The construction site is explored by using the GPS, the remote sensing radar, the seismic sensor and the model building unit, and data are transmitted to the model building unit for real-time intuitive observation, so that the work amount of personnel and vehicle scheduling is reduced, and the conditions of rolling omission and exploration omission are avoided.
本发明公开了一种堆石坝填筑振动碾的施工方法,包括以下步骤,步骤一,布置振动碾,对堆石坝区域进行划分,并根据划分内容选择振动碾数量,以及设定振动碾的移动路线;步骤二,清理施工区域,对划分出的区域进行清理;步骤三,逐层铺料,根据施工需要选择一种或多种材料进行填筑;步骤四,测量核查,对区域内所填材料进行网格化测量,确保平整度可进行振动碾操作。通过使用GPS、遥感雷达、地震传感器以及模型建立单元对施工现场进行探查,并通过将数据输送向模型建立单元中进行实时的直观性的观察,以此减少人员和车辆调度的工程量,以及避免出现碾压遗漏和探查遗漏的情况。
Construction method of rockfill dam filling vibration roller
The construction method comprises the following steps that firstly, vibration rollers are arranged, a rock-fill dam area is divided, the number of the vibration rollers is selected according to the division content, and the moving routes of the vibration rollers are set; 2, the construction area is cleaned, and the divided area is cleaned; step 3, paving materials layer by layer, and selecting one or more materials for filling according to construction requirements; and step 4, measuring and checking: carrying out gridding measurement on the material filled in the area to ensure the flatness, and carrying out vibration grinding operation. The construction site is explored by using the GPS, the remote sensing radar, the seismic sensor and the model building unit, and data are transmitted to the model building unit for real-time intuitive observation, so that the work amount of personnel and vehicle scheduling is reduced, and the conditions of rolling omission and exploration omission are avoided.
本发明公开了一种堆石坝填筑振动碾的施工方法,包括以下步骤,步骤一,布置振动碾,对堆石坝区域进行划分,并根据划分内容选择振动碾数量,以及设定振动碾的移动路线;步骤二,清理施工区域,对划分出的区域进行清理;步骤三,逐层铺料,根据施工需要选择一种或多种材料进行填筑;步骤四,测量核查,对区域内所填材料进行网格化测量,确保平整度可进行振动碾操作。通过使用GPS、遥感雷达、地震传感器以及模型建立单元对施工现场进行探查,并通过将数据输送向模型建立单元中进行实时的直观性的观察,以此减少人员和车辆调度的工程量,以及避免出现碾压遗漏和探查遗漏的情况。
Construction method of rockfill dam filling vibration roller
一种堆石坝填筑振动碾的施工方法
BAO XIANGJUN (Autor:in) / WANG HAITAO (Autor:in) / ZHAO QUANYING (Autor:in) / LUO JIANWU (Autor:in)
29.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
E02D
FOUNDATIONS
,
Gründungen
/
G01M
TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES
,
Prüfen der statischen oder dynamischen Massenverteilung rotierender Teile von Maschinen oder Konstruktionen
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
/
G01S
RADIO DIRECTION-FINDING
,
Funkpeilung
/
G01V
Geophysik
,
GEOPHYSICS
Concrete faced rockfill dam construction method for rapidly filling rockfill body
Europäisches Patentamt | 2022
|Safety of large rockfill dams during reservoir filling
British Library Conference Proceedings | 2006
|Analysis of a zoned rockfill dam with center core during construction and first filling
British Library Conference Proceedings | 2000
|