Construction method of variable-diameter composite cylindrical single pile
The invention discloses a variable-diameter composite barrel type single pile construction method which comprises the following steps that firstly, a section A is manufactured, and the section A comprises a flange, an inner platform, four body barrel sections and a conical section barrel section; secondly, a section B is manufactured, and the section B comprises two pairs of main lifting lugs and six cone cylinder sections; 3, a section C is manufactured, wherein the section C comprises a barrel cover plate, a tail slipping lifting lug, five cone barrel sections and a body barrel section; fourthly, a set of saddles used for supporting the shell rings are manufactured, and arrangement operation is conducted on the total assembly platform; 5, the section A, the section B and the section C are subjected to large closure; and 6, the overall size of the pipe pile is checked, and the installation integrity of the remaining accessory components is checked. According to the construction method disclosed by the invention, each section is independently constructed at first, and then each section is folded and assembled, so that the limitation of a product on a field is greatly reduced, the utilization of field resources is minimized, and the construction period is effectively prolonged due to span manufacturing.
本发明公开了一种多变径复合筒式单桩建造方法,包括以下流程:流程一,制造分段A,分段A包括:法兰、内平台,四节本体筒节和一节锥段筒节;流程二,制造分段B,分段B包括:主吊耳两副、六节锥体筒节;流程三,制造分段C,分段C包括:筒盖板、溜尾吊耳、五节锥体筒节、一节本体筒节;流程四,制作一组用于支撑筒节的鞍座,并在总组平台上进行布置作业;流程五,对分段A、分段B以及分段C进行大合拢,流程六,检查管桩的整体尺寸,检查剩余附属构件的安装完整性。本发明的建造方法,先对每个分段进行独立建造,再对各个分段进行合拢组装,大大减小了产品对场地的限制,使场地资源利用到最小化,跨间制作使工期得到有效的提升。
Construction method of variable-diameter composite cylindrical single pile
The invention discloses a variable-diameter composite barrel type single pile construction method which comprises the following steps that firstly, a section A is manufactured, and the section A comprises a flange, an inner platform, four body barrel sections and a conical section barrel section; secondly, a section B is manufactured, and the section B comprises two pairs of main lifting lugs and six cone cylinder sections; 3, a section C is manufactured, wherein the section C comprises a barrel cover plate, a tail slipping lifting lug, five cone barrel sections and a body barrel section; fourthly, a set of saddles used for supporting the shell rings are manufactured, and arrangement operation is conducted on the total assembly platform; 5, the section A, the section B and the section C are subjected to large closure; and 6, the overall size of the pipe pile is checked, and the installation integrity of the remaining accessory components is checked. According to the construction method disclosed by the invention, each section is independently constructed at first, and then each section is folded and assembled, so that the limitation of a product on a field is greatly reduced, the utilization of field resources is minimized, and the construction period is effectively prolonged due to span manufacturing.
本发明公开了一种多变径复合筒式单桩建造方法,包括以下流程:流程一,制造分段A,分段A包括:法兰、内平台,四节本体筒节和一节锥段筒节;流程二,制造分段B,分段B包括:主吊耳两副、六节锥体筒节;流程三,制造分段C,分段C包括:筒盖板、溜尾吊耳、五节锥体筒节、一节本体筒节;流程四,制作一组用于支撑筒节的鞍座,并在总组平台上进行布置作业;流程五,对分段A、分段B以及分段C进行大合拢,流程六,检查管桩的整体尺寸,检查剩余附属构件的安装完整性。本发明的建造方法,先对每个分段进行独立建造,再对各个分段进行合拢组装,大大减小了产品对场地的限制,使场地资源利用到最小化,跨间制作使工期得到有效的提升。
Construction method of variable-diameter composite cylindrical single pile
一种多变径复合筒式单桩建造方法
SHEN PEI (Autor:in) / YE ZHENG (Autor:in) / GE BIN (Autor:in) / YANG ZHAO (Autor:in) / JIANG MENGXIANG (Autor:in) / SHEN JIWEI (Autor:in) / YANG XIAOFENG (Autor:in) / WU HUANHUAN (Autor:in)
29.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|Combined variable-diameter single pile and combined variable-diameter single pile testing device
Europäisches Patentamt | 2023
|Variable-diameter pile foundation design method and variable-diameter pile foundation
Europäisches Patentamt | 2023
|Construction method of super-large-diameter single-pile composite cylinder
Europäisches Patentamt | 2022
|Variable-inner-diameter threaded pile and threaded pile asynchronous construction method
Europäisches Patentamt | 2020
|