Wall surface and top surface lead plate mounting construction process applied to radiomedicine room
The invention discloses a wall top surface lead plate mounting construction process applied to radiation protection engineering of a room for radiation medicine. The wall top surface lead plate mounting construction process comprises the following steps: checking, re-checking and cleaning a base layer of the wall top surface; carrying out field typesetting, lofting and positioning, and determining an installation sequence; mounting a rear embedded part of the'top-to-ground 'light steel framework foundation and a rear embedded part of the tower crane hanger rail foundation; mounting keels of the wall surface and top surface lead plates; wall surface and top surface node detail processing; wall surface and top surface lead plate installation construction is conducted, and cable pipeline matching engineering is installed in a penetrating and inserting mode; seam covering lead plates for longitudinal and transverse seam splicing of the wall surface and top surface lead plates are installed; detail nodes are reinforced; lead plate installation is specially accepted and accepted; manufacturing and installing a light steel framework and a steel bracket, and welding a suspended ceiling suspender; and wall surface wall plate hanging and light steel keel ceiling veneer decoration construction are carried out. The construction method has the advantages that radiation protection is tight and reliable, installation and construction are convenient and efficient, economic investment is saved, quality control is standardized and standardized, and a series of problems existing in a traditional method are solved.
本发明公开了一种应用于放射医学用房辐射防护工程的墙面顶面的铅板安装施工工艺,步骤包括:墙面顶面基层检查、复核、清理;现场排版放样定位,确定安装顺序;安装“顶天立地”轻钢构架基础的后置埋件和吊塔\吊轨基础的后置埋件;墙面顶面铅板的龙骨安装;墙面顶面节点细部处理;墙面顶面铅板安装施工并穿插安装线缆管道配套工程;墙面顶面铅板纵横向拼缝的盖缝铅板安装;细部节点加强;专项验收铅板安装;轻钢构架和钢支架制作安装,吊顶吊杆焊接;墙面挂墙板、轻钢龙骨吊顶饰面装修施工。采用本申请进行施工,具有辐射防护严密可靠,安装施工方便高效,节省经济投入,质量控制规范化标准化等优点,解决了传统做法存在的一系列问题。
Wall surface and top surface lead plate mounting construction process applied to radiomedicine room
The invention discloses a wall top surface lead plate mounting construction process applied to radiation protection engineering of a room for radiation medicine. The wall top surface lead plate mounting construction process comprises the following steps: checking, re-checking and cleaning a base layer of the wall top surface; carrying out field typesetting, lofting and positioning, and determining an installation sequence; mounting a rear embedded part of the'top-to-ground 'light steel framework foundation and a rear embedded part of the tower crane hanger rail foundation; mounting keels of the wall surface and top surface lead plates; wall surface and top surface node detail processing; wall surface and top surface lead plate installation construction is conducted, and cable pipeline matching engineering is installed in a penetrating and inserting mode; seam covering lead plates for longitudinal and transverse seam splicing of the wall surface and top surface lead plates are installed; detail nodes are reinforced; lead plate installation is specially accepted and accepted; manufacturing and installing a light steel framework and a steel bracket, and welding a suspended ceiling suspender; and wall surface wall plate hanging and light steel keel ceiling veneer decoration construction are carried out. The construction method has the advantages that radiation protection is tight and reliable, installation and construction are convenient and efficient, economic investment is saved, quality control is standardized and standardized, and a series of problems existing in a traditional method are solved.
本发明公开了一种应用于放射医学用房辐射防护工程的墙面顶面的铅板安装施工工艺,步骤包括:墙面顶面基层检查、复核、清理;现场排版放样定位,确定安装顺序;安装“顶天立地”轻钢构架基础的后置埋件和吊塔\吊轨基础的后置埋件;墙面顶面铅板的龙骨安装;墙面顶面节点细部处理;墙面顶面铅板安装施工并穿插安装线缆管道配套工程;墙面顶面铅板纵横向拼缝的盖缝铅板安装;细部节点加强;专项验收铅板安装;轻钢构架和钢支架制作安装,吊顶吊杆焊接;墙面挂墙板、轻钢龙骨吊顶饰面装修施工。采用本申请进行施工,具有辐射防护严密可靠,安装施工方便高效,节省经济投入,质量控制规范化标准化等优点,解决了传统做法存在的一系列问题。
Wall surface and top surface lead plate mounting construction process applied to radiomedicine room
一种应用于放射医学用房的墙面、顶面铅板安装施工工艺
PAN SHANGXUAN (Autor:in) / WANG KEZE (Autor:in) / ZHANG HUA (Autor:in) / WANG CHUANYOU (Autor:in) / YANG ZHIMIN (Autor:in) / LIN MAI (Autor:in)
29.12.2023
Patent
Elektronische Ressource
Chinesisch
Lead plate construction method for wall surface of operating room
Europäisches Patentamt | 2023
|Wall surface decorating plate mounting structure and mounting method
Europäisches Patentamt | 2015
|Storage plate applied to building construction surface and mounting frame of storage plate
Europäisches Patentamt | 2024
|