Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Raft foundation steel bar construction method
The invention relates to the technical field of building construction, in particular to a raft foundation reinforcing steel bar construction method which is simple and easy to construct by connecting supporting split heads into a whole to enhance the overall stability and bearing capacity of the supporting split heads and connecting the supporting split heads through connecting sleeves, reinforcing steel bar materials can be saved, and the technical requirements for workers can be reduced. The construction speed is increased; when two rows of reinforcing steel bars are designed, the U-shaped reinforcing steel bar positioning tool is used for positioning and fixing the two rows of reinforcing steel bars, positioning is accurate, and more materials are saved compared with an existing mode that supporting ribs are additionally arranged on a horse stool during construction of the two rows of reinforcing steel bars.
本发明涉及建筑施工技术领域,具体为一种筏板基础钢筋施工方法,通过将支撑马凳连接成整体,加强支撑马凳的整体稳定性和承载力,并且通过连接套筒连接支撑马凳的方式简单易施工,能够节省钢筋材料和降低对工人技术要求,提高施工速度;当设计有二排钢筋的情况下,利用U型钢筋定位工具进行二排钢筋的定位固定,定位准确,且相较于现有二排钢筋施工时在马凳上增加支撑筋的方式更加节省材料。
Raft foundation steel bar construction method
The invention relates to the technical field of building construction, in particular to a raft foundation reinforcing steel bar construction method which is simple and easy to construct by connecting supporting split heads into a whole to enhance the overall stability and bearing capacity of the supporting split heads and connecting the supporting split heads through connecting sleeves, reinforcing steel bar materials can be saved, and the technical requirements for workers can be reduced. The construction speed is increased; when two rows of reinforcing steel bars are designed, the U-shaped reinforcing steel bar positioning tool is used for positioning and fixing the two rows of reinforcing steel bars, positioning is accurate, and more materials are saved compared with an existing mode that supporting ribs are additionally arranged on a horse stool during construction of the two rows of reinforcing steel bars.
本发明涉及建筑施工技术领域,具体为一种筏板基础钢筋施工方法,通过将支撑马凳连接成整体,加强支撑马凳的整体稳定性和承载力,并且通过连接套筒连接支撑马凳的方式简单易施工,能够节省钢筋材料和降低对工人技术要求,提高施工速度;当设计有二排钢筋的情况下,利用U型钢筋定位工具进行二排钢筋的定位固定,定位准确,且相较于现有二排钢筋施工时在马凳上增加支撑筋的方式更加节省材料。
Raft foundation steel bar construction method
筏板基础钢筋施工方法
WANG LIXIN (Autor:in) / YUAN ZONGSHUANG (Autor:in) / WU HAITAO (Autor:in) / WANG GANG (Autor:in) / QI HELONG (Autor:in) / ZHOU TIAN (Autor:in) / YUAN JINHUI (Autor:in) / LI XIANGJUN (Autor:in) / HAN QINPENG (Autor:in) / LIU HONGXING (Autor:in)
02.01.2024
Patent
Elektronische Ressource
Chinesisch
CONSTRUCTION METHOD OF RAFT FOUNDATION AND RAFT FOUNDATION STRUCTURE
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2024
Europäisches Patentamt | 2024
|Raft foundation construction method for pile foundation detection and prefabricated raft
Europäisches Patentamt | 2021
|Pre-assembled raft foundation and construction method using pre-assembled raft foundation
Europäisches Patentamt | 2023
|