Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Operation method of autoclaved aerated concrete reinforced plate mesh cage welding fixing frame
The invention relates to the technical field of fixing frames, and discloses an operation method of an autoclaved aerated concrete reinforcement plate mesh cage welding fixing frame, which comprises a support frame, a fixing box is fixedly mounted at the top of the support frame, and two first stop blocks are fixedly mounted at the top of the fixing box; and a second stop block is fixedly mounted at the top of the fixed box and located on the front surface of the first stop block. According to the operation method of the autoclaved aerated concrete reinforced plate mesh cage welding fixing frame, the adjusting assembly is arranged, a servo motor is started, a rotating shaft and a spline rotate, a movable sleeve connected with the outer surface in a sliding mode is driven to rotate, and under transmission of a synchronous wheel and a synchronous belt, a two-way threaded column rotates along with the movable sleeve; the movable rod is driven to move under rotation of the two-way threaded column, the abutting block moves along with the movable rod, the size of the gap between the reinforcing steel bars placed in the shape like the Chinese character'jing 'is adjusted, namely the size of the gap of the mesh cage is adjusted and changed, and therefore the use requirement is met.
本发明涉及固定架技术领域,且公开了一种蒸压加气混凝土配筋板材网笼焊接固定架的操作方法,包括支撑架,所述支撑架的顶部固定安装有固定箱,所述固定箱的顶部固定安装有数量为两个的第一挡块,所述固定箱的顶部且位于第一挡块的正面固定安装有第二挡块。该蒸压加气混凝土配筋板材网笼焊接固定架的操作方法,通过设置调节组件,伺服电机启动,转轴和花键转动,带动外表面滑动连接的活动套转动,在同步轮和同步带的传动下,双向螺纹柱跟着活动套发生转动,带动活动杆在双向螺纹柱的旋转下发生移动,抵块跟着移动,对摆放成井字形的钢筋之间的空隙大小进行调节,也就是对网笼的空隙大小进行调节改变,从而满足使用的需求。
Operation method of autoclaved aerated concrete reinforced plate mesh cage welding fixing frame
The invention relates to the technical field of fixing frames, and discloses an operation method of an autoclaved aerated concrete reinforcement plate mesh cage welding fixing frame, which comprises a support frame, a fixing box is fixedly mounted at the top of the support frame, and two first stop blocks are fixedly mounted at the top of the fixing box; and a second stop block is fixedly mounted at the top of the fixed box and located on the front surface of the first stop block. According to the operation method of the autoclaved aerated concrete reinforced plate mesh cage welding fixing frame, the adjusting assembly is arranged, a servo motor is started, a rotating shaft and a spline rotate, a movable sleeve connected with the outer surface in a sliding mode is driven to rotate, and under transmission of a synchronous wheel and a synchronous belt, a two-way threaded column rotates along with the movable sleeve; the movable rod is driven to move under rotation of the two-way threaded column, the abutting block moves along with the movable rod, the size of the gap between the reinforcing steel bars placed in the shape like the Chinese character'jing 'is adjusted, namely the size of the gap of the mesh cage is adjusted and changed, and therefore the use requirement is met.
本发明涉及固定架技术领域,且公开了一种蒸压加气混凝土配筋板材网笼焊接固定架的操作方法,包括支撑架,所述支撑架的顶部固定安装有固定箱,所述固定箱的顶部固定安装有数量为两个的第一挡块,所述固定箱的顶部且位于第一挡块的正面固定安装有第二挡块。该蒸压加气混凝土配筋板材网笼焊接固定架的操作方法,通过设置调节组件,伺服电机启动,转轴和花键转动,带动外表面滑动连接的活动套转动,在同步轮和同步带的传动下,双向螺纹柱跟着活动套发生转动,带动活动杆在双向螺纹柱的旋转下发生移动,抵块跟着移动,对摆放成井字形的钢筋之间的空隙大小进行调节,也就是对网笼的空隙大小进行调节改变,从而满足使用的需求。
Operation method of autoclaved aerated concrete reinforced plate mesh cage welding fixing frame
一种蒸压加气混凝土配筋板材网笼焊接固定架的操作方法
JIANG ZHIYONG (Autor:in)
05.01.2024
Patent
Elektronische Ressource
Chinesisch
Positioning buckle for protective layer of autoclaved aerated concrete plate reinforcing mesh cage
Europäisches Patentamt | 2023
|Reinforced autoclaved aerated concrete roof slabs
British Library Conference Proceedings | 2002
|British Library Online Contents | 2006
British Library Conference Proceedings | 1997
|