Bridge stay cable mounting structure and construction process
The invention relates to a bridge stay cable installation structure and a construction technology, and relates to the technical field of bridge stay cables, the bridge stay cable installation structure comprises two anchorage devices, a cable penetrating machine and a jack, the bridge stay cable installation structure further comprises fixed round pipes, the two anchorage devices are movably arranged on the two fixed round pipes respectively for positioning, and the fixed round pipes are provided with driving mechanisms for driving the two anchorage devices to move at the same time. The driving mechanism is started to drive the two anchorage devices to move, the installed steel strand is moved to one side, meanwhile, the other anchor hole in the anchorage device is aligned with the steel strand connected with the cable penetrating machine, and therefore the probability that the steel strand is twisted when moving is reduced, and the installation efficiency of the inhaul cable is improved.
本申请涉及桥梁斜拉索安装结构及施工工艺,涉及桥梁斜拉索的技术领域,包括两个锚具、穿索机、千斤顶,还包括固定圆管,两个锚具分别活动设置在两个固定圆管上进行定位,固定圆管上设置有驱动两个锚具同时活动的驱动机构。本申请通过驱动机构启动带动两个锚具活动,使得安装后的钢绞线移至一侧,同时使得锚具上的另一个锚孔和与穿索机连接的钢绞线对齐,从而降低了钢绞线移动时发生打绞现象的概率,提高了拉索的安装效率。
Bridge stay cable mounting structure and construction process
The invention relates to a bridge stay cable installation structure and a construction technology, and relates to the technical field of bridge stay cables, the bridge stay cable installation structure comprises two anchorage devices, a cable penetrating machine and a jack, the bridge stay cable installation structure further comprises fixed round pipes, the two anchorage devices are movably arranged on the two fixed round pipes respectively for positioning, and the fixed round pipes are provided with driving mechanisms for driving the two anchorage devices to move at the same time. The driving mechanism is started to drive the two anchorage devices to move, the installed steel strand is moved to one side, meanwhile, the other anchor hole in the anchorage device is aligned with the steel strand connected with the cable penetrating machine, and therefore the probability that the steel strand is twisted when moving is reduced, and the installation efficiency of the inhaul cable is improved.
本申请涉及桥梁斜拉索安装结构及施工工艺,涉及桥梁斜拉索的技术领域,包括两个锚具、穿索机、千斤顶,还包括固定圆管,两个锚具分别活动设置在两个固定圆管上进行定位,固定圆管上设置有驱动两个锚具同时活动的驱动机构。本申请通过驱动机构启动带动两个锚具活动,使得安装后的钢绞线移至一侧,同时使得锚具上的另一个锚孔和与穿索机连接的钢绞线对齐,从而降低了钢绞线移动时发生打绞现象的概率,提高了拉索的安装效率。
Bridge stay cable mounting structure and construction process
桥梁斜拉索安装结构及施工工艺
LI XIAOYONG (Autor:in) / YU TAO (Autor:in) / ZHAI SHUISHENG (Autor:in) / SHEN WEI (Autor:in) / SONG HEE (Autor:in) / ZHOU QIANG (Autor:in) / PENG ZHIPENG (Autor:in) / WU SHAOYUAN (Autor:in) / ZHOU QILIN (Autor:in) / GAO XINCHEN (Autor:in)
05.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bridge stay cable cleaning equipment for bridge construction
Europäisches Patentamt | 2023
|Bridge stay cable lagging tensioning construction technology
Europäisches Patentamt | 2022
|