Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
UHPC-NC hybrid beam extradosed cable-stayed bridge and construction method thereof
The invention discloses a UHPC-NC hybrid beam extradosed cable-stayed bridge and a construction method thereof.The UHPC-NC hybrid beam extradosed cable-stayed bridge comprises at least one bridge pier, at least one bridge tower, a first bridge abutment and a second bridge abutment which are formed through NC pouring, a plurality of stay cables are arranged on the bridge tower, UHPC-NC pier top box girder sections are installed on the bridge pier, a plurality of prefabricated UHPC box girder sections are sequentially and tightly arranged in a main span area, and the first bridge abutment and the second bridge abutment are connected through a steel wire. A plurality of prefabricated NC box girder sections are sequentially and tightly arranged in the side span area, prefabricated UHPC-NC transition sections are arranged between the UHPC-NC pier top box girder sections and the adjacent NC box girder sections, and the UHPC box girder sections, the NC box girder sections and the UHPC-NC transition sections are connected with the bridge tower through stay cables. The UHPC-NC hybrid beam extradosed cable-stayed bridge has the advantages of being high in crack resistance, convenient to construct and good in economical efficiency.
本发明公开了一种UHPC‑NC混合梁矮塔斜拉桥及其施工方法,包括由NC浇筑成型的至少一个桥墩、至少一个桥塔、第一桥台和第二桥台,桥塔上设有多个斜拉索,桥墩上安装有UHPC‑NC墩顶箱梁节段,主跨区域依次紧密排列有多个预制的UHPC箱梁节段,边跨区域依次紧密排列有多个预制的NC箱梁节段,UHPC‑NC墩顶箱梁节段到相邻的NC箱梁节段之间设有预制的UHPC‑NC过渡段,各UHPC箱梁节段、各NC箱梁节段和UHPC‑NC过渡段分别通过斜拉索与桥塔连接。该UHPC‑NC混合梁矮塔斜拉桥具有抗裂性能高、施工方便、经济性好优点。
UHPC-NC hybrid beam extradosed cable-stayed bridge and construction method thereof
The invention discloses a UHPC-NC hybrid beam extradosed cable-stayed bridge and a construction method thereof.The UHPC-NC hybrid beam extradosed cable-stayed bridge comprises at least one bridge pier, at least one bridge tower, a first bridge abutment and a second bridge abutment which are formed through NC pouring, a plurality of stay cables are arranged on the bridge tower, UHPC-NC pier top box girder sections are installed on the bridge pier, a plurality of prefabricated UHPC box girder sections are sequentially and tightly arranged in a main span area, and the first bridge abutment and the second bridge abutment are connected through a steel wire. A plurality of prefabricated NC box girder sections are sequentially and tightly arranged in the side span area, prefabricated UHPC-NC transition sections are arranged between the UHPC-NC pier top box girder sections and the adjacent NC box girder sections, and the UHPC box girder sections, the NC box girder sections and the UHPC-NC transition sections are connected with the bridge tower through stay cables. The UHPC-NC hybrid beam extradosed cable-stayed bridge has the advantages of being high in crack resistance, convenient to construct and good in economical efficiency.
本发明公开了一种UHPC‑NC混合梁矮塔斜拉桥及其施工方法,包括由NC浇筑成型的至少一个桥墩、至少一个桥塔、第一桥台和第二桥台,桥塔上设有多个斜拉索,桥墩上安装有UHPC‑NC墩顶箱梁节段,主跨区域依次紧密排列有多个预制的UHPC箱梁节段,边跨区域依次紧密排列有多个预制的NC箱梁节段,UHPC‑NC墩顶箱梁节段到相邻的NC箱梁节段之间设有预制的UHPC‑NC过渡段,各UHPC箱梁节段、各NC箱梁节段和UHPC‑NC过渡段分别通过斜拉索与桥塔连接。该UHPC‑NC混合梁矮塔斜拉桥具有抗裂性能高、施工方便、经济性好优点。
UHPC-NC hybrid beam extradosed cable-stayed bridge and construction method thereof
一种UHPC-NC混合梁矮塔斜拉桥及其施工方法
ZHAO HUA (Autor:in) / LUO SUI (Autor:in) / QIAO DONGQIN (Autor:in) / HU JUNDE (Autor:in) / SUN TAO (Autor:in) / SHAO XUDONG (Autor:in) / ZHAO RUOYI (Autor:in)
09.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Flexible beam dense cable hybrid beam extradosed cable-stayed bridge
Europäisches Patentamt | 2021
|Beam-arch cooperative extradosed cable-stayed bridge and construction method
Europäisches Patentamt | 2023
|Stay cable construction method of extradosed cable-stayed bridge
Europäisches Patentamt | 2020
|Windproof structure of extradosed cable-stayed bridge
Europäisches Patentamt | 2024
|