Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pre-grouting and dynamic grouting house settlement deformation control method
The invention relates to the technical field of engineering construction, in particular to a pre-grouting and dynamic grouting house settlement deformation control method which comprises the following steps that S1, a grouting test is conducted through a sleeve valve pipe, and construction parameters are determined; and S2, grouting is conducted on the house according to the construction parameters. According to the house settlement deformation control method, after the construction parameters are determined through the grouting test, the grouting operation is conducted, the demolition cost of the ground surface house can be saved, the grouting cost is reduced, meanwhile, the safety of the ground surface house is guaranteed, the problem of house uneven settlement caused by underground excavation construction or the natural environment and the like is solved, and the construction quality is improved. And risks of house collapse and personnel and property loss are reduced.
本发明涉及工程建设技术领域,具体是一种预注浆+动态注浆的房屋沉降变形控制方法,所述房屋沉降变形控制方法包括如下步骤:S1:通过袖阀管进行注浆试验,确定出施工参数;S2:根据所述施工参数,对房屋进行注浆。本发明的房屋沉降变形控制方法通过注浆试验,确定出施工参数后,再进行注浆操作,不仅可以节约地表房屋的拆迁成本,减少注浆成本,同时保证了地表房屋的安全,解决了因暗挖施工或者自然环境等造成的房屋不均匀沉降,降低了房屋坍塌及人员、财产损失的风险。
Pre-grouting and dynamic grouting house settlement deformation control method
The invention relates to the technical field of engineering construction, in particular to a pre-grouting and dynamic grouting house settlement deformation control method which comprises the following steps that S1, a grouting test is conducted through a sleeve valve pipe, and construction parameters are determined; and S2, grouting is conducted on the house according to the construction parameters. According to the house settlement deformation control method, after the construction parameters are determined through the grouting test, the grouting operation is conducted, the demolition cost of the ground surface house can be saved, the grouting cost is reduced, meanwhile, the safety of the ground surface house is guaranteed, the problem of house uneven settlement caused by underground excavation construction or the natural environment and the like is solved, and the construction quality is improved. And risks of house collapse and personnel and property loss are reduced.
本发明涉及工程建设技术领域,具体是一种预注浆+动态注浆的房屋沉降变形控制方法,所述房屋沉降变形控制方法包括如下步骤:S1:通过袖阀管进行注浆试验,确定出施工参数;S2:根据所述施工参数,对房屋进行注浆。本发明的房屋沉降变形控制方法通过注浆试验,确定出施工参数后,再进行注浆操作,不仅可以节约地表房屋的拆迁成本,减少注浆成本,同时保证了地表房屋的安全,解决了因暗挖施工或者自然环境等造成的房屋不均匀沉降,降低了房屋坍塌及人员、财产损失的风险。
Pre-grouting and dynamic grouting house settlement deformation control method
一种预注浆+动态注浆的房屋沉降变形控制方法
TAN RENZHAO (Autor:in) / PENG JIANGTAO (Autor:in) / ZHAO LIANG (Autor:in) / CHAO JUNLIANG (Autor:in) / WANG XI (Autor:in) / LIU DINGYUAN (Autor:in) / CAO WENQIANG (Autor:in)
09.01.2024
Patent
Elektronische Ressource
Chinesisch
Grouting method for simultaneously recovering tunnel settlement and horizontal deformation
Europäisches Patentamt | 2022
|Grouting type foundation pit settlement deviation control method
Europäisches Patentamt | 2021
|Compaction grouting for correcting building settlement
British Library Conference Proceedings | 1996
|Grouting eco grouting puri grouting bio grouting and its material
Europäisches Patentamt | 2023
|