Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cast-in-place pile construction equipment
The invention relates to a cast-in-place pile construction device which comprises a frame, a first end and a second end, the first end and the second end are arranged in the running direction of the cast-in-place pile construction device, and the first end and the second end are the two opposite ends of the frame; the rotary drilling assembly is arranged at the first end of the frame, and the rotary drilling assembly is configured to perform rotary drilling operation; and the hoisting assembly is arranged at the second end of the frame, and the hoisting assembly is configured to perform hoisting operation. According to the cast-in-place pile construction equipment provided by the embodiment of the invention, rotary excavating drilling construction can be carried out, reinforcement cage hoisting construction can also be carried out, the applicability is higher, and the construction efficiency is high; moreover, the rotary drilling assembly and the hoisting assembly are modularized, the hoisting assembly can serve as a balance weight of the rotary drilling assembly in the working process of the rotary drilling assembly, the rotary drilling assembly can serve as a hoisting balance weight in the working process of the hoisting assembly, and the rotary drilling assembly and the hoisting assembly are mutually balanced, so that no additional balance weight needs to be arranged, and the cost is reduced. The cost is reduced, and the overall function of the equipment is improved.
本发明涉及一种灌注桩施工设备,包括:车架,包括沿灌注桩施工设备行驶方向布置的第一端和第二端,第一端和第二端为车架的相对两端;旋挖钻组件,设于车架的第一端,旋挖钻组件被配置为进行旋挖钻孔作业;以及吊装组件,设于车架的第二端,吊装组件被配置为进行吊装作业。本发明实施例提供的灌注桩施工设备既能进行旋挖钻孔施工,又能进行钢筋笼吊装施工,适用性更强,施工效率高;并且,旋挖钻组件和吊装组件模块化,在旋挖钻组件工作的过程中,吊装组件可以作为旋挖钻的配重,在吊装组件工作的过程中,旋挖钻组件可以作为吊装的配重,通过旋挖钻组件和吊装组件互相形成平衡,不再需要另外设置配重,既降低了成本,又提升了设备整体功能。
Cast-in-place pile construction equipment
The invention relates to a cast-in-place pile construction device which comprises a frame, a first end and a second end, the first end and the second end are arranged in the running direction of the cast-in-place pile construction device, and the first end and the second end are the two opposite ends of the frame; the rotary drilling assembly is arranged at the first end of the frame, and the rotary drilling assembly is configured to perform rotary drilling operation; and the hoisting assembly is arranged at the second end of the frame, and the hoisting assembly is configured to perform hoisting operation. According to the cast-in-place pile construction equipment provided by the embodiment of the invention, rotary excavating drilling construction can be carried out, reinforcement cage hoisting construction can also be carried out, the applicability is higher, and the construction efficiency is high; moreover, the rotary drilling assembly and the hoisting assembly are modularized, the hoisting assembly can serve as a balance weight of the rotary drilling assembly in the working process of the rotary drilling assembly, the rotary drilling assembly can serve as a hoisting balance weight in the working process of the hoisting assembly, and the rotary drilling assembly and the hoisting assembly are mutually balanced, so that no additional balance weight needs to be arranged, and the cost is reduced. The cost is reduced, and the overall function of the equipment is improved.
本发明涉及一种灌注桩施工设备,包括:车架,包括沿灌注桩施工设备行驶方向布置的第一端和第二端,第一端和第二端为车架的相对两端;旋挖钻组件,设于车架的第一端,旋挖钻组件被配置为进行旋挖钻孔作业;以及吊装组件,设于车架的第二端,吊装组件被配置为进行吊装作业。本发明实施例提供的灌注桩施工设备既能进行旋挖钻孔施工,又能进行钢筋笼吊装施工,适用性更强,施工效率高;并且,旋挖钻组件和吊装组件模块化,在旋挖钻组件工作的过程中,吊装组件可以作为旋挖钻的配重,在吊装组件工作的过程中,旋挖钻组件可以作为吊装的配重,通过旋挖钻组件和吊装组件互相形成平衡,不再需要另外设置配重,既降低了成本,又提升了设备整体功能。
Cast-in-place pile construction equipment
灌注桩施工设备
LIU WENSHENG (Autor:in) / ZHAO BO (Autor:in) / LI YUNBO (Autor:in) / LIU ZHONGHUI (Autor:in) / JIN FENG (Autor:in)
09.01.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2021
|Cast-in-place pile construction auxiliary device and cast-in-place pile construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|CAST-IN-PLACE PILE AND CONSTRUCTION METHOD OF CAST-IN-PLACE PILE
Europäisches Patentamt | 2023
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
Europäisches Patentamt | 2019
|