Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pottery tile shutter curtain wall system of pseudo-classic architecture and construction method of pottery tile shutter curtain wall system
The invention discloses a pottery tile shutter curtain wall system of a pseudo-classic building and a construction method of the pottery tile shutter curtain wall system. And 2, constructing the steel roof truss. And thirdly, glass curtain walls are constructed on the periphery of the main body structure. And fourthly, a roof structure is constructed on the top of the steel roof truss. And 5, prefabricating the pottery tile shutter curtain wall. Step 6, constructing a pottery tile shutter curtain wall system: constructing an inclined keel framework on the outer side of the balcony, connecting the upper end of the inclined keel framework with the steel roof truss, and connecting the lower part of the inclined keel framework with the lowest balcony; and then the ceramic tile shutter curtain wall is constructed on the outer side of the inclined keel framework, and a bottom sealing structure is constructed at the bottom of the inclined keel framework. The technical problems that a traditional curtain wall system is not transparent in sight and is not coordinated with a traditional pseudo-classic architecture in style are solved.
一种仿古建筑的陶瓦百叶幕墙系统及其施工方法,包括步骤如下:步骤一,施工主体结构。步骤二,施工钢屋架。步骤三,在主体结构的四周施工玻璃幕墙。步骤四,在钢屋架的顶部施工屋面结构。步骤五,预制陶瓦百叶幕墙。步骤六,施工陶瓦百叶幕墙系统:在阳台的外侧施工斜龙骨骨架,将斜龙骨骨架的上端与钢屋架连接,斜龙骨骨架的下与最下层的阳台连接;然后在斜龙骨骨架的外侧施工陶瓦百叶幕墙,并且在斜龙骨骨架的底部施工封底结构。本发明解决了传统的幕墙系统视线不通透,且与传统仿古建筑风格不协调的技术问题。
Pottery tile shutter curtain wall system of pseudo-classic architecture and construction method of pottery tile shutter curtain wall system
The invention discloses a pottery tile shutter curtain wall system of a pseudo-classic building and a construction method of the pottery tile shutter curtain wall system. And 2, constructing the steel roof truss. And thirdly, glass curtain walls are constructed on the periphery of the main body structure. And fourthly, a roof structure is constructed on the top of the steel roof truss. And 5, prefabricating the pottery tile shutter curtain wall. Step 6, constructing a pottery tile shutter curtain wall system: constructing an inclined keel framework on the outer side of the balcony, connecting the upper end of the inclined keel framework with the steel roof truss, and connecting the lower part of the inclined keel framework with the lowest balcony; and then the ceramic tile shutter curtain wall is constructed on the outer side of the inclined keel framework, and a bottom sealing structure is constructed at the bottom of the inclined keel framework. The technical problems that a traditional curtain wall system is not transparent in sight and is not coordinated with a traditional pseudo-classic architecture in style are solved.
一种仿古建筑的陶瓦百叶幕墙系统及其施工方法,包括步骤如下:步骤一,施工主体结构。步骤二,施工钢屋架。步骤三,在主体结构的四周施工玻璃幕墙。步骤四,在钢屋架的顶部施工屋面结构。步骤五,预制陶瓦百叶幕墙。步骤六,施工陶瓦百叶幕墙系统:在阳台的外侧施工斜龙骨骨架,将斜龙骨骨架的上端与钢屋架连接,斜龙骨骨架的下与最下层的阳台连接;然后在斜龙骨骨架的外侧施工陶瓦百叶幕墙,并且在斜龙骨骨架的底部施工封底结构。本发明解决了传统的幕墙系统视线不通透,且与传统仿古建筑风格不协调的技术问题。
Pottery tile shutter curtain wall system of pseudo-classic architecture and construction method of pottery tile shutter curtain wall system
一种仿古建筑的陶瓦百叶幕墙系统及其施工方法
GAO BING (Autor:in) / DU XINDAN (Autor:in) / QIAO GUIRU (Autor:in) / TANG JIE (Autor:in) / LIANG TIAN (Autor:in) / DAI JUNBAO (Autor:in) / WANG CHUNHONG (Autor:in) / ZOU YANG (Autor:in) / XU YONG (Autor:in) / MA LIQUN (Autor:in)
09.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
A01G
Gartenbau
,
HORTICULTURE
/
E06B
Feste oder bewegliche Abschlüsse für Öffnungen in Bauwerken, Fahrzeugen, Zäunen oder ähnlichen Einfriedungen allgemein, z.B. Türen, Fenster, Läden, Tore
,
FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES, OR LIKE ENCLOSURES, IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
Photovoltaic shutter curtain wall unit and curtain wall
Europäisches Patentamt | 2023
|Glass shutter curtain wall system and construction method
Europäisches Patentamt | 2024
|