Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Precast pile bottom karst cave detection method and related device
The invention provides a precast pile bottom karst cave detection method and related device.The method comprises the steps that under the condition that it is determined that a pile bottom karst cave exists through detection, karst cave basic information is obtained; the land water content condition in a first preset area is obtained, and the first preset area refers to an area with the position of a karst cave as the center; according to the karst cave basic information and the land water content condition, the stability degree of a pile construction area is determined; and the stability degree, the karst cave basic information and the land water content condition are sent to a central server in a wireless communication mode. Therefore, by using the detection method provided by the invention, the judgment accuracy and comprehensiveness of the stability of the pile construction area can be improved, and the purposes of quickly allocating resources and improving the overall efficiency while ensuring the construction quality are achieved. The precast pile bottom karst cave detection method and the related device can be widely applied to the field of building construction.
本申请提供了一种预制桩桩底溶洞探测方法及相关装置,其中该方法步骤包括有:在确定探测到存在桩底溶洞的情况下,获取溶洞基础信息;获取第一预设区域内的土地含水情况,其中,所述第一预设区域指的是以一溶洞位置为中心的区域;根据所述溶洞基础信息以及土地含水情况,确定出桩施工区域的稳定性程度;将所述稳定性程度、溶洞基础信息以及土地含水情况通过无线通讯方式发送至中心服务器。可见,通过使用本申请的探测方法,能够提高桩施工区域稳定性的判定准确定和全面性,并且达到快速进行资源调配,在保证施工质量的同时提高整体效率的目的。本申请一种预制桩桩底溶洞探测方法及相关装置可广泛应用于建筑建设施工领域中。
Precast pile bottom karst cave detection method and related device
The invention provides a precast pile bottom karst cave detection method and related device.The method comprises the steps that under the condition that it is determined that a pile bottom karst cave exists through detection, karst cave basic information is obtained; the land water content condition in a first preset area is obtained, and the first preset area refers to an area with the position of a karst cave as the center; according to the karst cave basic information and the land water content condition, the stability degree of a pile construction area is determined; and the stability degree, the karst cave basic information and the land water content condition are sent to a central server in a wireless communication mode. Therefore, by using the detection method provided by the invention, the judgment accuracy and comprehensiveness of the stability of the pile construction area can be improved, and the purposes of quickly allocating resources and improving the overall efficiency while ensuring the construction quality are achieved. The precast pile bottom karst cave detection method and the related device can be widely applied to the field of building construction.
本申请提供了一种预制桩桩底溶洞探测方法及相关装置,其中该方法步骤包括有:在确定探测到存在桩底溶洞的情况下,获取溶洞基础信息;获取第一预设区域内的土地含水情况,其中,所述第一预设区域指的是以一溶洞位置为中心的区域;根据所述溶洞基础信息以及土地含水情况,确定出桩施工区域的稳定性程度;将所述稳定性程度、溶洞基础信息以及土地含水情况通过无线通讯方式发送至中心服务器。可见,通过使用本申请的探测方法,能够提高桩施工区域稳定性的判定准确定和全面性,并且达到快速进行资源调配,在保证施工质量的同时提高整体效率的目的。本申请一种预制桩桩底溶洞探测方法及相关装置可广泛应用于建筑建设施工领域中。
Precast pile bottom karst cave detection method and related device
一种预制桩桩底溶洞探测方法及相关装置
QIU ZHIMIN (Autor:in) / LIU RUI (Autor:in) / LIU ZHIYUAN (Autor:in) / BI DENGFENG (Autor:in) / ZHANG TAO (Autor:in)
09.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
E02D
FOUNDATIONS
,
Gründungen
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
/
G01V
Geophysik
,
GEOPHYSICS
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Construction method of precast pile group pile foundation in bead type karst cave stratum
Europäisches Patentamt | 2023
|Building foundation pile hole karst cave detection device
Europäisches Patentamt | 2023
|Carrier pile machine compaction karst cave filler and karst cave filling method
Europäisches Patentamt | 2020
|Karst tunnel bottom filling beaded type karst cave steel pipe pile grouting hole forming method
Europäisches Patentamt | 2020
|Karst cave pile foundation construction method and device
Europäisches Patentamt | 2023
|