Method for verifying pile end corrosion limestone stability and pile foundation bearing capacity of cast-in-place pile foundation based on karst development area
The invention relates to a method for verifying pile end corrosion limestone stability and pile foundation bearing capacity of a cast-in-place pile foundation based on a karst development area. The method comprises the following steps of S1, exploration investigation and sampling; s2, analyzing a sample indoor test to determine the corrosion performance and physical and mechanical parameters of the limestone; s3, monitoring the underground water level in combination with hydrogeological conditions; s4, performing numerical simulation by using the data to evaluate the stability of the limestone; s5, pile foundation structure parameters are determined according to results, engineering design and specifications, and loads are estimated; s6, an instrument is arranged to measure the pile side resistance change, the friction angle and the bearing capacity are calculated, and the pile foundation bearing capacity is evaluated; s7, a static load test instrument is arranged to apply loads, response and deformation characteristics are monitored, and the pile foundation stability is evaluated; and S8, analyzing the interaction of limestone corrosion on the pile soil to correct the bearing capacity so as to determine the bearing capacity of the pile foundation. According to the method, multiple data acquisition methods are integrated, the reliability of the verification result is improved, and the bearing capacity of the pile foundation is evaluated more accurately by analyzing the interaction between limestone corrosion and pile soil.
本发明涉及一种基于岩溶发育区灌注桩基础桩端溶蚀石灰岩稳定性、桩基承载力验证方法,包括以下步骤:S1勘探调查和采样;S2分析样品室内试验以确定石灰岩的溶蚀性能和物理力学参数;S3结合水文地质条件监测地下水位;S4利用数据进行数值模拟评估石灰岩稳定性;S5根据结果、工程设计和规范确定桩基结构参数、估算荷载;S6通过设置仪器测量桩侧阻力变化并计算摩擦角和承载力评估桩基承载能力;S7设置静载试验仪器施加荷载并监测响应和变形特性评估桩基稳定性;S8分析石灰岩溶蚀对桩土相互作用修正承载力以确定桩基承载力。本发明综合多种数据采集方法,提高了验证结果的可靠性,且通过分析石灰岩溶蚀与桩土相互作用,对桩基的承载能力评估更准确。
Method for verifying pile end corrosion limestone stability and pile foundation bearing capacity of cast-in-place pile foundation based on karst development area
The invention relates to a method for verifying pile end corrosion limestone stability and pile foundation bearing capacity of a cast-in-place pile foundation based on a karst development area. The method comprises the following steps of S1, exploration investigation and sampling; s2, analyzing a sample indoor test to determine the corrosion performance and physical and mechanical parameters of the limestone; s3, monitoring the underground water level in combination with hydrogeological conditions; s4, performing numerical simulation by using the data to evaluate the stability of the limestone; s5, pile foundation structure parameters are determined according to results, engineering design and specifications, and loads are estimated; s6, an instrument is arranged to measure the pile side resistance change, the friction angle and the bearing capacity are calculated, and the pile foundation bearing capacity is evaluated; s7, a static load test instrument is arranged to apply loads, response and deformation characteristics are monitored, and the pile foundation stability is evaluated; and S8, analyzing the interaction of limestone corrosion on the pile soil to correct the bearing capacity so as to determine the bearing capacity of the pile foundation. According to the method, multiple data acquisition methods are integrated, the reliability of the verification result is improved, and the bearing capacity of the pile foundation is evaluated more accurately by analyzing the interaction between limestone corrosion and pile soil.
本发明涉及一种基于岩溶发育区灌注桩基础桩端溶蚀石灰岩稳定性、桩基承载力验证方法,包括以下步骤:S1勘探调查和采样;S2分析样品室内试验以确定石灰岩的溶蚀性能和物理力学参数;S3结合水文地质条件监测地下水位;S4利用数据进行数值模拟评估石灰岩稳定性;S5根据结果、工程设计和规范确定桩基结构参数、估算荷载;S6通过设置仪器测量桩侧阻力变化并计算摩擦角和承载力评估桩基承载能力;S7设置静载试验仪器施加荷载并监测响应和变形特性评估桩基稳定性;S8分析石灰岩溶蚀对桩土相互作用修正承载力以确定桩基承载力。本发明综合多种数据采集方法,提高了验证结果的可靠性,且通过分析石灰岩溶蚀与桩土相互作用,对桩基的承载能力评估更准确。
Method for verifying pile end corrosion limestone stability and pile foundation bearing capacity of cast-in-place pile foundation based on karst development area
一种基于岩溶发育区灌注桩基础桩端溶蚀石灰岩稳定性、桩基承载力验证方法
JIANG ZHONGLIE (Autor:in) / ZHONG HONGGUANG (Autor:in) / LIANG HUOPEI (Autor:in)
09.01.2024
Patent
Elektronische Ressource
Chinesisch
Karst area pile foundation construction method and karst area pile foundation construction device
Europäisches Patentamt | 2022
|Reinforcement cage structure for karst area pile foundation and pile foundation construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Bearing Capacity of Pile Foundation
British Library Conference Proceedings | 1988
|