Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation pit supporting structure and construction method thereof
The invention discloses a foundation pit supporting structure which comprises a supporting box arranged in a foundation pit, and a water inlet hole is formed in the side wall of the supporting box; the containing drainage mechanism is arranged on the outer side of the supporting box and comprises a water inlet pipe communicated with the water inlet hole, and a check valve is arranged at the inlet end of the water inlet pipe; the containing box communicates with the outlet end of the water inlet pipe, and the bottom of the containing box communicates with a drainage pipe; the water passing plate is fixedly arranged in the containing box and located below the outlet end of the water inlet pipe, and a water drainage opening is formed in the water passing plate; the limiting shielding plate is arranged on the lower side face of the water outlet in a covering mode and driven by the rotation driving part to rotate, when the water level in the containing box reaches the preset water level, the rotation driving part is started and drives the limiting shielding plate to rotate, and the limiting shielding plate is in the state of not shielding the water outlet. Rainwater collection is achieved through the containing box, and when the rainfall is too large, the drainage pressure of a foundation pit is reduced by rotating the limiting shielding plate, adjusting the shielded area of the drainage opening and adjusting the drainage amount.
本发明公开了一种基坑支撑结构,包括:支撑箱,其设于基坑内,且侧壁上开设有进水孔;容纳排水机构,其设于支撑箱的外侧,包括:进水管,其与进水孔连通,进水管的进口端设有逆止阀;容纳箱体,其与进水管的出口端连通,且底部连通设有排水管;通水板,其固设于容纳箱体内,且位于进水管的出口端下方,通水板上开设有排水口;限位遮板,其盖设于排水口下侧面,由转动驱动件驱动转动,当容纳箱体内的水位达到预设水位,转动驱动件启动,并驱动限位遮板转动,限位遮板位于非遮蔽排水口状态。本发明通过容纳箱体实现对雨水的收集,并在降雨量过大时,通过转动限位遮板,调节排水口被遮蔽面积,调节排水量,以减小基坑排水压力。
Foundation pit supporting structure and construction method thereof
The invention discloses a foundation pit supporting structure which comprises a supporting box arranged in a foundation pit, and a water inlet hole is formed in the side wall of the supporting box; the containing drainage mechanism is arranged on the outer side of the supporting box and comprises a water inlet pipe communicated with the water inlet hole, and a check valve is arranged at the inlet end of the water inlet pipe; the containing box communicates with the outlet end of the water inlet pipe, and the bottom of the containing box communicates with a drainage pipe; the water passing plate is fixedly arranged in the containing box and located below the outlet end of the water inlet pipe, and a water drainage opening is formed in the water passing plate; the limiting shielding plate is arranged on the lower side face of the water outlet in a covering mode and driven by the rotation driving part to rotate, when the water level in the containing box reaches the preset water level, the rotation driving part is started and drives the limiting shielding plate to rotate, and the limiting shielding plate is in the state of not shielding the water outlet. Rainwater collection is achieved through the containing box, and when the rainfall is too large, the drainage pressure of a foundation pit is reduced by rotating the limiting shielding plate, adjusting the shielded area of the drainage opening and adjusting the drainage amount.
本发明公开了一种基坑支撑结构,包括:支撑箱,其设于基坑内,且侧壁上开设有进水孔;容纳排水机构,其设于支撑箱的外侧,包括:进水管,其与进水孔连通,进水管的进口端设有逆止阀;容纳箱体,其与进水管的出口端连通,且底部连通设有排水管;通水板,其固设于容纳箱体内,且位于进水管的出口端下方,通水板上开设有排水口;限位遮板,其盖设于排水口下侧面,由转动驱动件驱动转动,当容纳箱体内的水位达到预设水位,转动驱动件启动,并驱动限位遮板转动,限位遮板位于非遮蔽排水口状态。本发明通过容纳箱体实现对雨水的收集,并在降雨量过大时,通过转动限位遮板,调节排水口被遮蔽面积,调节排水量,以减小基坑排水压力。
Foundation pit supporting structure and construction method thereof
一种基坑支撑结构及其施工方法
WANG WENLONG (Autor:in) / YAO HONGCHAO (Autor:in) / LIU GUOHUI (Autor:in) / BAEK JIN-HO (Autor:in) / WU LIJUN (Autor:in) / CHEN ANQI (Autor:in) / SONG XIAOFEI (Autor:in)
12.01.2024
Patent
Elektronische Ressource
Chinesisch
Foundation pit supporting structure and construction method thereof
Europäisches Patentamt | 2024
|Foundation pit supporting structure and construction method thereof
Europäisches Patentamt | 2023
|Foundation pit supporting structure and construction method thereof
Europäisches Patentamt | 2023
|Foundation pit supporting structure and construction method thereof
Europäisches Patentamt | 2020
|Foundation pit supporting structure and construction method thereof
Europäisches Patentamt | 2024
|