Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Civil engineering concrete pouring wallboard
The invention discloses a civil engineering concrete pouring wallboard, and mainly relates to the technical field of civil engineering. Comprising a first baffle, a second baffle is installed at one end of the first baffle, a third baffle is installed at the end, away from the second baffle, of the first baffle, supporting devices are arranged on the surfaces of the first baffle, the second baffle and the third baffle correspondingly, and each supporting device comprises a supporting frame and a limiting assembly; and one side of the supporting frame is fixedly connected with the surface of the first baffle, and connecting grooves are formed in the surfaces of the two sides of the supporting frame. The formwork structure has the beneficial effects that the problems that in the civil construction engineering construction process, a frame needs to be used for fixing the formwork structure to standardize the pouring range, pouring work needs to be carried out on main positions such as a cross beam and a foundation, and at the moment, a concrete pouring baffle is used for supporting and limiting; the problems that the baffles are inclined and gaps are too large due to the fact that supporting and limiting of the baffles are not firm easily are solved.
本发明公开了一种土木工程混凝土浇筑墙板,主要涉及土木工程技术领域。包括第一挡板,所述第一挡板的一端安装有第二挡板,所述第一挡板远离第二挡板的一端安装有第三挡板,所述第一挡板、第二挡板和第三挡板的表面均设有支撑装置,所述支撑装置包括支撑框和限位组件,所述支撑框的一侧与第一挡板的表面固定连接,所述支撑框的两侧表面均开设有衔接槽。本发明的有益效果在于:解决了土木建筑工程施工过程中,需要使用框架固定模板结构规范浇筑范围,对横梁、地基等主要位置进行浇筑工作,而此时将会利用混凝土浇筑挡板进行支撑限位,在对混凝土浇筑墙板进行施工时,容易出挡板支撑限位不牢固,进而导致挡板之间发生倾斜且缝隙过大的问题。
Civil engineering concrete pouring wallboard
The invention discloses a civil engineering concrete pouring wallboard, and mainly relates to the technical field of civil engineering. Comprising a first baffle, a second baffle is installed at one end of the first baffle, a third baffle is installed at the end, away from the second baffle, of the first baffle, supporting devices are arranged on the surfaces of the first baffle, the second baffle and the third baffle correspondingly, and each supporting device comprises a supporting frame and a limiting assembly; and one side of the supporting frame is fixedly connected with the surface of the first baffle, and connecting grooves are formed in the surfaces of the two sides of the supporting frame. The formwork structure has the beneficial effects that the problems that in the civil construction engineering construction process, a frame needs to be used for fixing the formwork structure to standardize the pouring range, pouring work needs to be carried out on main positions such as a cross beam and a foundation, and at the moment, a concrete pouring baffle is used for supporting and limiting; the problems that the baffles are inclined and gaps are too large due to the fact that supporting and limiting of the baffles are not firm easily are solved.
本发明公开了一种土木工程混凝土浇筑墙板,主要涉及土木工程技术领域。包括第一挡板,所述第一挡板的一端安装有第二挡板,所述第一挡板远离第二挡板的一端安装有第三挡板,所述第一挡板、第二挡板和第三挡板的表面均设有支撑装置,所述支撑装置包括支撑框和限位组件,所述支撑框的一侧与第一挡板的表面固定连接,所述支撑框的两侧表面均开设有衔接槽。本发明的有益效果在于:解决了土木建筑工程施工过程中,需要使用框架固定模板结构规范浇筑范围,对横梁、地基等主要位置进行浇筑工作,而此时将会利用混凝土浇筑挡板进行支撑限位,在对混凝土浇筑墙板进行施工时,容易出挡板支撑限位不牢固,进而导致挡板之间发生倾斜且缝隙过大的问题。
Civil engineering concrete pouring wallboard
一种土木工程混凝土浇筑墙板
CHEN SHIHAO (Autor:in)
16.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete pouring device for civil engineering construction
Europäisches Patentamt | 2022
|Concrete pouring device and method for civil engineering
Europäisches Patentamt | 2023
|