The invention relates to a multi-layer segmented grouting construction method which comprises the following steps: S1, preparation work: determining a to-be-treated area and problem severity, and meanwhile, cleaning a working area to prepare construction; s2, the to-be-treated area is divided into a plurality of pouring areas in the vertical direction; s3, drilling is conducted, specifically, a plurality of pouring holes are vertically drilled in the to-be-treated area; s4, grouting is conducted, specifically, layered grouting is conducted in the pouring holes; s5, a connecting pile is placed, and the connecting pile with the outer diameter smaller than the hole diameter of the drilled hole is inserted into the grouting in the pouring hole; s6, waiting for curing; and S7, other layers are poured in sequence, and the effect of improving the grouting integrity is achieved after the last time of grouting is completely solidified.
本申请涉及一种多层分段注浆施工方法,其包括以下步骤:S1、准备工作,确定需要处理区域以及问题严重程度,同时清理工作区域准备施工;S2、将待处理区域沿竖向分为多个浇筑区;S3、钻孔,在待处理区域竖向钻设多个浇筑孔;S4、注浆,向浇筑孔内分层注浆;S5、放置连桩,将外径小于钻孔孔径的连桩插入浇筑孔内的注浆中;S6、等待固化;S7、其他层依次浇筑,待上次注浆完全固化,本申请具有提高注浆整体性的效果。
Multi-layer segmented grouting construction method
The invention relates to a multi-layer segmented grouting construction method which comprises the following steps: S1, preparation work: determining a to-be-treated area and problem severity, and meanwhile, cleaning a working area to prepare construction; s2, the to-be-treated area is divided into a plurality of pouring areas in the vertical direction; s3, drilling is conducted, specifically, a plurality of pouring holes are vertically drilled in the to-be-treated area; s4, grouting is conducted, specifically, layered grouting is conducted in the pouring holes; s5, a connecting pile is placed, and the connecting pile with the outer diameter smaller than the hole diameter of the drilled hole is inserted into the grouting in the pouring hole; s6, waiting for curing; and S7, other layers are poured in sequence, and the effect of improving the grouting integrity is achieved after the last time of grouting is completely solidified.
本申请涉及一种多层分段注浆施工方法,其包括以下步骤:S1、准备工作,确定需要处理区域以及问题严重程度,同时清理工作区域准备施工;S2、将待处理区域沿竖向分为多个浇筑区;S3、钻孔,在待处理区域竖向钻设多个浇筑孔;S4、注浆,向浇筑孔内分层注浆;S5、放置连桩,将外径小于钻孔孔径的连桩插入浇筑孔内的注浆中;S6、等待固化;S7、其他层依次浇筑,待上次注浆完全固化,本申请具有提高注浆整体性的效果。
Multi-layer segmented grouting construction method
一种多层分段注浆施工方法
HUANG HANCHENG (Autor:in) / LAN YUJIN (Autor:in) / GAO YAN (Autor:in) / LIU MING (Autor:in) / LI CHAOWEN (Autor:in)
16.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Segmented grouting construction method for anti-floating anchor rod
Europäisches Patentamt | 2022
|Segmented inclined grouting construction device and method for layered roadbed
Europäisches Patentamt | 2023
|Segmented grouting bag type screw pile and construction method thereof
Europäisches Patentamt | 2021
|Steel flower pipe segmented grouting system and construction method thereof
Europäisches Patentamt | 2015
|Tailing pond culvert pipe segmented grouting construction device and construction method thereof
Europäisches Patentamt | 2022
|