Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway subgrade reinforcing structure and construction method
The invention relates to the technical field of highway subgrade construction, in particular to a highway subgrade reinforcing structure and a construction method.The highway subgrade reinforcing structure comprises the following steps that S01, a fixing groove is formed, and a reinforcing bottom plate is driven into the fixing groove; s02, a connecting blind hole is punched, and a first supporting pipe is punched into the connecting blind hole; s03, a second supporting pipe is driven in, and the two ends of the second supporting pipe are welded to the first supporting pipe; s04, the step S02 and the step S03 are repeated, a mounting hole is drilled in the vertical reinforcing steel plate, then the vertical reinforcing steel plate is welded and fixed to the reinforcing bottom plate, and the end of the first supporting pipe is welded to the mounting hole; s05, reinforcing ribs are inserted into the mounting holes; s06, reinforcing side plates are welded to the reinforcing bottom plate and the vertical reinforcing steel plates, then end plates are welded, and a reinforcing cavity is filled with reinforcing cement through a cement injection opening; s07, cement is cooled and formed, and roadbed reinforcement is completed; the connecting strength between the roadbed and the reinforcing steel plate can be effectively enhanced, the reinforcing steel plate is prevented from being separated from the roadbed in the long-time use process, and the overall reinforcing effect is better.
本发明涉及公路路基施工技术领域,具体为一种公路路基加固结构及施工方法,包括以下步骤:S01、打固定槽,往固定槽中打入加固底板;S02、打连接盲孔,往连接盲孔中打入第一支撑管;S03、打入第二支撑管,将第二支撑管的两端与第一支撑管焊接;S04、重复步骤S02和S03,在竖向加固钢板上钻安装孔,再将竖向加固钢板焊接固定在加固底板上,将第一支撑管的端部与安装孔焊接;S05、往安装孔中插入加强筋;S06、在加固底板和竖向加固钢板上焊接加固侧板,再焊接端板,通过水泥注入口往加固腔中填充加固水泥;S07、水泥冷却成型,完成路基加固;本发明能有效加强路基与加固钢板间的连接强度,防止加固钢板在长时间使用过程中与路基分离,整体加固效果更好。
Highway subgrade reinforcing structure and construction method
The invention relates to the technical field of highway subgrade construction, in particular to a highway subgrade reinforcing structure and a construction method.The highway subgrade reinforcing structure comprises the following steps that S01, a fixing groove is formed, and a reinforcing bottom plate is driven into the fixing groove; s02, a connecting blind hole is punched, and a first supporting pipe is punched into the connecting blind hole; s03, a second supporting pipe is driven in, and the two ends of the second supporting pipe are welded to the first supporting pipe; s04, the step S02 and the step S03 are repeated, a mounting hole is drilled in the vertical reinforcing steel plate, then the vertical reinforcing steel plate is welded and fixed to the reinforcing bottom plate, and the end of the first supporting pipe is welded to the mounting hole; s05, reinforcing ribs are inserted into the mounting holes; s06, reinforcing side plates are welded to the reinforcing bottom plate and the vertical reinforcing steel plates, then end plates are welded, and a reinforcing cavity is filled with reinforcing cement through a cement injection opening; s07, cement is cooled and formed, and roadbed reinforcement is completed; the connecting strength between the roadbed and the reinforcing steel plate can be effectively enhanced, the reinforcing steel plate is prevented from being separated from the roadbed in the long-time use process, and the overall reinforcing effect is better.
本发明涉及公路路基施工技术领域,具体为一种公路路基加固结构及施工方法,包括以下步骤:S01、打固定槽,往固定槽中打入加固底板;S02、打连接盲孔,往连接盲孔中打入第一支撑管;S03、打入第二支撑管,将第二支撑管的两端与第一支撑管焊接;S04、重复步骤S02和S03,在竖向加固钢板上钻安装孔,再将竖向加固钢板焊接固定在加固底板上,将第一支撑管的端部与安装孔焊接;S05、往安装孔中插入加强筋;S06、在加固底板和竖向加固钢板上焊接加固侧板,再焊接端板,通过水泥注入口往加固腔中填充加固水泥;S07、水泥冷却成型,完成路基加固;本发明能有效加强路基与加固钢板间的连接强度,防止加固钢板在长时间使用过程中与路基分离,整体加固效果更好。
Highway subgrade reinforcing structure and construction method
一种公路路基加固结构及施工方法
LIU HAIBING (Autor:in) / MA LIFANG (Autor:in) / ZHAO LI (Autor:in) / JI YUEHAI (Autor:in) / ZHAI ZHIQIANG (Autor:in) / LIU XIA (Autor:in) / CAO YUAN (Autor:in)
23.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Highway subgrade reinforcing structure and construction method
Europäisches Patentamt | 2023
|Highway subgrade reinforcing structure and construction method
Europäisches Patentamt | 2020
|Highway subgrade reinforcing structure and construction method
Europäisches Patentamt | 2021
|Highway subgrade reinforcing construction equipment and construction method
Europäisches Patentamt | 2023
|