Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Plastic runway edge anti-cracking construction method
The invention relates to the field of plastic track construction, in particular to a plastic track edge anti-cracking construction method which comprises the following steps: S1, constructing a base layer; s2, a stable layer is laid on the top of the base layer; s3, bottom sealing glue is laid on the top of the stable layer; s4, a surface layer is laid on the top of the bottom sealing glue; the surface layer comprises a main body area and a reverse glue area, the reverse glue area is connected to the main body area, the reverse glue area is located at the edge of the surface layer, and the adhesive content of the reverse glue area is higher than that of the main body area. The plastic runway has the advantages that the situation that the edge of the surface layer is warped is reduced, and therefore the normal use effect of the plastic runway is guaranteed.
本申请涉及塑胶跑道施工领域,尤其涉及一种塑胶跑道边缘防开裂施工方法,其包括以下步骤:S1、施工基层;S2、在所述基层的顶部铺设稳定层;S3、在所述稳定层的顶部铺设封底胶;S4、在所述封底胶的顶部铺设面层;所述面层包括主体区和反胶区,所述反胶区连接于主体区,且所述反胶区位于面层的边缘,所述反胶区的胶合剂的含量高于主体区的胶合剂的含量。本申请具有减少面层的边缘翘边的情况的发生,从而确保塑胶跑道的正常使用的效果。
Plastic runway edge anti-cracking construction method
The invention relates to the field of plastic track construction, in particular to a plastic track edge anti-cracking construction method which comprises the following steps: S1, constructing a base layer; s2, a stable layer is laid on the top of the base layer; s3, bottom sealing glue is laid on the top of the stable layer; s4, a surface layer is laid on the top of the bottom sealing glue; the surface layer comprises a main body area and a reverse glue area, the reverse glue area is connected to the main body area, the reverse glue area is located at the edge of the surface layer, and the adhesive content of the reverse glue area is higher than that of the main body area. The plastic runway has the advantages that the situation that the edge of the surface layer is warped is reduced, and therefore the normal use effect of the plastic runway is guaranteed.
本申请涉及塑胶跑道施工领域,尤其涉及一种塑胶跑道边缘防开裂施工方法,其包括以下步骤:S1、施工基层;S2、在所述基层的顶部铺设稳定层;S3、在所述稳定层的顶部铺设封底胶;S4、在所述封底胶的顶部铺设面层;所述面层包括主体区和反胶区,所述反胶区连接于主体区,且所述反胶区位于面层的边缘,所述反胶区的胶合剂的含量高于主体区的胶合剂的含量。本申请具有减少面层的边缘翘边的情况的发生,从而确保塑胶跑道的正常使用的效果。
Plastic runway edge anti-cracking construction method
一种塑胶跑道边缘防开裂施工方法
CHEN JIHUI (Autor:in)
23.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE