Movable construction equipment and method for slab culvert side wall pouring
The invention discloses slab culvert side wall pouring movable construction equipment and method.The equipment comprises a control system, first equipment and second equipment, and the first equipment and the second equipment are the same in structure; the first device comprises a U-shaped bottom plate, a door-shaped frame, a guide plate, a template, a through groove, a hoisting mechanism, a guide hole, a guide rod, a telescopic mechanism, a first laser distance measuring sensor, a lifting mechanism, a positioning mechanism, a connecting hole, a second laser distance measuring sensor, a walking mechanism and a leveling mechanism. The method comprises the steps of equipment positioning, template positioning, pouring and the like. According to the method, the two formworks can be accurately positioned without split bolts, the construction procedure is simplified, the construction efficiency is improved, meanwhile, it can be guaranteed that side wall pouring is consistent with a construction drawing, the first device and the second device cooperate with each other, and the method can be suitable for cover plate culvert side wall pouring of various intervals and various included angles.
本发明公开一种盖板涵侧墙浇筑移动式施工设备及方法,设备包括控制系统、设备一和设备二,设备一和设备二的结构相同,设备一包括U形底板、门型架、导向板、模板、通槽、起吊机构、导向孔、导杆、伸缩机构、第一激光测距传感器、升降机构、定位机构、连接孔、第二激光测距传感器、行走机构及调平机构。方法包括设备定位、模板定位、浇筑等步骤。本发明不需要通过对拉螺栓即可将2块模板精确定位,简化了施工工序,提高了施工效率,同时,能够保证侧墙浇筑与施工图纸一致,设备一和设备二协同配合,可适用于各种间距、各种夹角的盖板涵侧墙浇筑。
Movable construction equipment and method for slab culvert side wall pouring
The invention discloses slab culvert side wall pouring movable construction equipment and method.The equipment comprises a control system, first equipment and second equipment, and the first equipment and the second equipment are the same in structure; the first device comprises a U-shaped bottom plate, a door-shaped frame, a guide plate, a template, a through groove, a hoisting mechanism, a guide hole, a guide rod, a telescopic mechanism, a first laser distance measuring sensor, a lifting mechanism, a positioning mechanism, a connecting hole, a second laser distance measuring sensor, a walking mechanism and a leveling mechanism. The method comprises the steps of equipment positioning, template positioning, pouring and the like. According to the method, the two formworks can be accurately positioned without split bolts, the construction procedure is simplified, the construction efficiency is improved, meanwhile, it can be guaranteed that side wall pouring is consistent with a construction drawing, the first device and the second device cooperate with each other, and the method can be suitable for cover plate culvert side wall pouring of various intervals and various included angles.
本发明公开一种盖板涵侧墙浇筑移动式施工设备及方法,设备包括控制系统、设备一和设备二,设备一和设备二的结构相同,设备一包括U形底板、门型架、导向板、模板、通槽、起吊机构、导向孔、导杆、伸缩机构、第一激光测距传感器、升降机构、定位机构、连接孔、第二激光测距传感器、行走机构及调平机构。方法包括设备定位、模板定位、浇筑等步骤。本发明不需要通过对拉螺栓即可将2块模板精确定位,简化了施工工序,提高了施工效率,同时,能够保证侧墙浇筑与施工图纸一致,设备一和设备二协同配合,可适用于各种间距、各种夹角的盖板涵侧墙浇筑。
Movable construction equipment and method for slab culvert side wall pouring
一种盖板涵侧墙浇筑移动式施工设备及方法
ZENG MIN (Autor:in) / SUN KAI (Autor:in) / CAO XIONGWEI (Autor:in) / ZHOU XIAOGENG (Autor:in)
23.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E04G
SCAFFOLDING
,
Baugerüste
Construction method for pouring square ditch side wall concrete through movable pouring frame device
Europäisches Patentamt | 2023
|Hydraulic culvert wall body pouring integral template device and construction method thereof
Europäisches Patentamt | 2024
|Road drainage ditch side wall movable formwork pouring method
Europäisches Patentamt | 2023
|