Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel structure combined bridge
The invention discloses a steel structure combined bridge, and relates to the field of bridges, the steel structure combined bridge comprises two end steel molds and a plurality of splicing steel molds arranged between the two end steel molds, a plurality of first holes are formed in the splicing steel molds in a penetrating mode, first pipes are installed in the first holes, and second pipes are arranged at one ends of the first pipes in a sliding mode; an extrusion assembly used for driving the second pipe to slide is arranged on one side of the second pipe, the extrusion assembly is arranged on the splicing steel die, a first protrusion used for driving the extrusion assembly on the adjacent splicing steel die to operate is arranged on the side, away from the end steel die, of the splicing steel die, and a second hole used for being connected with the second pipe in an inserted mode is formed in the end steel die; the end steel molds are provided with second protrusions used for driving the extrusion assemblies on the adjacent splicing steel molds to operate, the end steel molds are further provided with connector assemblies facilitating pouring of concrete into the first pipes and the second pipes, and through the scheme, welding point positions are reduced in the bridge manufacturing and splicing process, and connection is convenient.
本申请公开了一种钢结构组合桥梁,涉及桥梁领域,一种钢结构组合桥梁,包括两个端部钢模以及设置在两个端部钢膜之间的若干个拼接钢模,拼接钢模上贯穿开设有若干个第一孔,第一孔内安装有第一管,第一管一端滑移设置有第二管,第二管的一侧设置有用于驱使第二管滑移的挤压组件,挤压组件设置于拼接钢模上,拼接钢模远离端部钢模一侧设置有用于驱动相邻拼接钢模上挤压组件运转的第一凸起,端部钢模开设有用于插接第二管的第二孔,端部钢模上设置有用于驱动相邻拼接钢模上挤压组件运转的第二凸起,端部钢模上还设置有便于向第一管以及第二管内灌注混凝土的接口组件,通过上述方案,使得桥梁制造拼接过程中减少焊接点位,连接方便。
Steel structure combined bridge
The invention discloses a steel structure combined bridge, and relates to the field of bridges, the steel structure combined bridge comprises two end steel molds and a plurality of splicing steel molds arranged between the two end steel molds, a plurality of first holes are formed in the splicing steel molds in a penetrating mode, first pipes are installed in the first holes, and second pipes are arranged at one ends of the first pipes in a sliding mode; an extrusion assembly used for driving the second pipe to slide is arranged on one side of the second pipe, the extrusion assembly is arranged on the splicing steel die, a first protrusion used for driving the extrusion assembly on the adjacent splicing steel die to operate is arranged on the side, away from the end steel die, of the splicing steel die, and a second hole used for being connected with the second pipe in an inserted mode is formed in the end steel die; the end steel molds are provided with second protrusions used for driving the extrusion assemblies on the adjacent splicing steel molds to operate, the end steel molds are further provided with connector assemblies facilitating pouring of concrete into the first pipes and the second pipes, and through the scheme, welding point positions are reduced in the bridge manufacturing and splicing process, and connection is convenient.
本申请公开了一种钢结构组合桥梁,涉及桥梁领域,一种钢结构组合桥梁,包括两个端部钢模以及设置在两个端部钢膜之间的若干个拼接钢模,拼接钢模上贯穿开设有若干个第一孔,第一孔内安装有第一管,第一管一端滑移设置有第二管,第二管的一侧设置有用于驱使第二管滑移的挤压组件,挤压组件设置于拼接钢模上,拼接钢模远离端部钢模一侧设置有用于驱动相邻拼接钢模上挤压组件运转的第一凸起,端部钢模开设有用于插接第二管的第二孔,端部钢模上设置有用于驱动相邻拼接钢模上挤压组件运转的第二凸起,端部钢模上还设置有便于向第一管以及第二管内灌注混凝土的接口组件,通过上述方案,使得桥梁制造拼接过程中减少焊接点位,连接方便。
Steel structure combined bridge
一种钢结构组合桥梁
CHENG LI (Autor:in) / WANG YONG (Autor:in) / HUANG CHUAN (Autor:in)
26.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Steel-concrete combined bridge deck structure and bridge
Europäisches Patentamt | 2021
|Combined bridge tower steel-concrete combined section structure, bridge and construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Fabricated steel-concrete combined bridge deck structure
Europäisches Patentamt | 2022
|