Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Plate-type berthing component mounting process
The invention relates to a plate-type berthing component mounting process. The plate-type berthing component mounting process comprises the following steps that firstly, berthing components are prefabricated; step 2, cast-in-place of a pile cap; 3, installing the double-spliced I-shaped steel beam; fourthly, the berthing component is hoisted; fifthly, the berthing component is limited and fixed; and sixthly, concrete of the berthing component and the pile cap connector is poured. The hanging plate type berthing component is installed through the technology, the construction efficiency is high, and four components can be installed every day; the double-spliced I-shaped steel beams are adopted and fixed to the pile caps through finish-rolled deformed steel bars, and the problem of supporting stress when the plate-type berthing component is installed is well solved. The bracket is arranged at the bottom of the berthing component, the reinforcing steel supports are arranged on the two sides of the bracket, and the problems that the berthing component shakes under stormy waves and is poor in stability are well solved.
本发明是一种板式靠船构件安装工艺,包括以下步骤:步骤一:预制靠船构件;步骤二:现浇桩帽;步骤三:安装双拼工字钢梁;步骤四:吊装靠船构件;步骤五:限位固定靠船构件;步骤六:浇筑靠船构件与桩帽接头混凝土。本发明采用该工艺安装悬挂板式靠船构件,施工效率较高,可日完成4块构件的安装;采用双拼工字钢梁并利用精轧螺纹钢固定在桩帽上,较好地解决了板式靠船构件安装时的支承受力难题;在靠船构件底部设置托架,在托架两侧布置加固钢支撑,较好地解决了靠船构件在风浪下产生晃动,稳定性较差的问题。
Plate-type berthing component mounting process
The invention relates to a plate-type berthing component mounting process. The plate-type berthing component mounting process comprises the following steps that firstly, berthing components are prefabricated; step 2, cast-in-place of a pile cap; 3, installing the double-spliced I-shaped steel beam; fourthly, the berthing component is hoisted; fifthly, the berthing component is limited and fixed; and sixthly, concrete of the berthing component and the pile cap connector is poured. The hanging plate type berthing component is installed through the technology, the construction efficiency is high, and four components can be installed every day; the double-spliced I-shaped steel beams are adopted and fixed to the pile caps through finish-rolled deformed steel bars, and the problem of supporting stress when the plate-type berthing component is installed is well solved. The bracket is arranged at the bottom of the berthing component, the reinforcing steel supports are arranged on the two sides of the bracket, and the problems that the berthing component shakes under stormy waves and is poor in stability are well solved.
本发明是一种板式靠船构件安装工艺,包括以下步骤:步骤一:预制靠船构件;步骤二:现浇桩帽;步骤三:安装双拼工字钢梁;步骤四:吊装靠船构件;步骤五:限位固定靠船构件;步骤六:浇筑靠船构件与桩帽接头混凝土。本发明采用该工艺安装悬挂板式靠船构件,施工效率较高,可日完成4块构件的安装;采用双拼工字钢梁并利用精轧螺纹钢固定在桩帽上,较好地解决了板式靠船构件安装时的支承受力难题;在靠船构件底部设置托架,在托架两侧布置加固钢支撑,较好地解决了靠船构件在风浪下产生晃动,稳定性较差的问题。
Plate-type berthing component mounting process
一种板式靠船构件安装工艺
LI XU (Autor:in) / FAN WEI (Autor:in) / LI LIANG (Autor:in) / LIU MING (Autor:in) / SU YIRU (Autor:in) / XU LINLI (Autor:in) / SUN ZUOHUA (Autor:in) / LUO JINGYI (Autor:in) / ZHANG MINGYANG (Autor:in)
26.01.2024
Patent
Elektronische Ressource
Chinesisch
High pile plate beam type wharf berthing component mounting device and mounting method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Automatic berthing structure for intelligent operation and maintenance ship and berthing process
Europäisches Patentamt | 2024
|Novel adding process for prefabricated berthing component of built wharf
Europäisches Patentamt | 2023
|