Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Treatment method for filling bridge pile foundation karst cave with mixture of pebbles, clay and cement
The invention relates to the technical field of civil engineering, in particular to a treatment method for filling a bridge pile foundation karst cave with a mixture of pebbles, clay and cement. Preparing a pebble and clay-cement mixture; exploring the karst cave condition; carrying out corresponding processing according to a karst cave condition probing result; and the next process is performed after filling. According to the method, local materials are used, the construction treatment method for the bridge pile foundation karst cave in the karst area is researched and formulated, waste resources such as pebbles and clay of the bridge pile foundation are fully utilized, transportation of materials from other areas is reduced as much as possible, on the basis that the input cost is reduced, waste is turned into wealth, and pollution to the environment is avoided; and the method has very important significance for ensuring the construction quality, progress, safety and economic benefits.
本发明涉及土木工程技术领域,具体涉及采用卵石与黏土和水泥混合料填充桥梁桩基溶洞处理方法,所述方法包括以下步骤:采用钻探手段进行前期勘察;制作卵石与黏土‑水泥混合料;探查溶洞情况;根据探查溶洞情况结果进行对应处理;填充完成进行下一步工序。本方法就地取材,意在研究和制定岩溶地区桥梁桩基溶洞施工处理方法,充分利用桥梁桩基的卵石与黏土等废弃资源,尽量减少从其他地区运输材料,在减少投入成本的基础上,实现了变废为宝,不会对环境造成污染,对保证施工质量、进度、安全、经济效益都具有非常重要的意义。
Treatment method for filling bridge pile foundation karst cave with mixture of pebbles, clay and cement
The invention relates to the technical field of civil engineering, in particular to a treatment method for filling a bridge pile foundation karst cave with a mixture of pebbles, clay and cement. Preparing a pebble and clay-cement mixture; exploring the karst cave condition; carrying out corresponding processing according to a karst cave condition probing result; and the next process is performed after filling. According to the method, local materials are used, the construction treatment method for the bridge pile foundation karst cave in the karst area is researched and formulated, waste resources such as pebbles and clay of the bridge pile foundation are fully utilized, transportation of materials from other areas is reduced as much as possible, on the basis that the input cost is reduced, waste is turned into wealth, and pollution to the environment is avoided; and the method has very important significance for ensuring the construction quality, progress, safety and economic benefits.
本发明涉及土木工程技术领域,具体涉及采用卵石与黏土和水泥混合料填充桥梁桩基溶洞处理方法,所述方法包括以下步骤:采用钻探手段进行前期勘察;制作卵石与黏土‑水泥混合料;探查溶洞情况;根据探查溶洞情况结果进行对应处理;填充完成进行下一步工序。本方法就地取材,意在研究和制定岩溶地区桥梁桩基溶洞施工处理方法,充分利用桥梁桩基的卵石与黏土等废弃资源,尽量减少从其他地区运输材料,在减少投入成本的基础上,实现了变废为宝,不会对环境造成污染,对保证施工质量、进度、安全、经济效益都具有非常重要的意义。
Treatment method for filling bridge pile foundation karst cave with mixture of pebbles, clay and cement
采用卵石与黏土和水泥混合料填充桥梁桩基溶洞处理方法
XIAO GUIYUAN (Autor:in) / WANG YIPENG (Autor:in) / TAN XIAOLEI (Autor:in) / LIU XUECAI (Autor:in) / CHANG YAJING (Autor:in) / CAO JIANWEN (Autor:in) / XU JINGKUI (Autor:in) / LI KEKE (Autor:in)
26.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Processing method for bridge pile foundation karst cave
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|High-pressure pre-filling karst cave pile foundation construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|