Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Intelligent anchoring construction equipment for geotechnical engineering
The intelligent anchoring construction equipment comprises a crawler walking device and a rotating device arranged at the upper end of the crawler walking device, a control device is arranged at the upper end of the rotating device, a supporting component is arranged at the lower end of the control device, a lifting device is arranged at the upper end of the control device, and a mounting main block is arranged at the lifting end of the lifting device; an angle adjusting mechanism is arranged on the mounting main block, a bearing plate is arranged on the angle adjusting mechanism, a rotating device is arranged on the bearing plate, a mounting frame is arranged at the upper end of the rotating device, an extension mechanism is arranged on the mounting frame, and anchoring construction mechanisms are arranged at the upper ends of the extension mechanism and the mounting frame; the problems that in the prior art, in the process of conducting shallow layer anchoring treatment on rock-soil side slopes or foundation pit engineering of soft rocks and soil bodies, only one anchor rod can be driven in one time, so that efficiency is low, the labor intensity of workers is large, and the falling risk exists can be solved. The vibration of anchor rod construction can bring dust and influence the health of workers.
本发明涉及一种岩土工程用智能锚固施工设备,包括履带行走装置和设置在履带行走装置上端的转动装置,转动装置上端设置有控制装置,控制装置下端设置有支撑构件,控制装置上端设置有提升装置,提升装置的升降端设置有安装主块,安装主块上设置有角度调节机构,角度调节机构上设置有承托板,承托板上设置有转动装置,转动装置上端设置有安装架,安装架上设置有延伸机构,延伸机构以及安装架上端设置有锚固施工机构;本发明能解决现有技术对软岩及土体的岩土边坡或基坑工程进行浅层锚固治理的过程中存在的以下问题:一次只能打入一根锚杆导致效率较慢,工作人员的劳动强度较大,有坠落的风险,锚杆施工的振动会带起灰尘并影响工作人员的健康。
Intelligent anchoring construction equipment for geotechnical engineering
The intelligent anchoring construction equipment comprises a crawler walking device and a rotating device arranged at the upper end of the crawler walking device, a control device is arranged at the upper end of the rotating device, a supporting component is arranged at the lower end of the control device, a lifting device is arranged at the upper end of the control device, and a mounting main block is arranged at the lifting end of the lifting device; an angle adjusting mechanism is arranged on the mounting main block, a bearing plate is arranged on the angle adjusting mechanism, a rotating device is arranged on the bearing plate, a mounting frame is arranged at the upper end of the rotating device, an extension mechanism is arranged on the mounting frame, and anchoring construction mechanisms are arranged at the upper ends of the extension mechanism and the mounting frame; the problems that in the prior art, in the process of conducting shallow layer anchoring treatment on rock-soil side slopes or foundation pit engineering of soft rocks and soil bodies, only one anchor rod can be driven in one time, so that efficiency is low, the labor intensity of workers is large, and the falling risk exists can be solved. The vibration of anchor rod construction can bring dust and influence the health of workers.
本发明涉及一种岩土工程用智能锚固施工设备,包括履带行走装置和设置在履带行走装置上端的转动装置,转动装置上端设置有控制装置,控制装置下端设置有支撑构件,控制装置上端设置有提升装置,提升装置的升降端设置有安装主块,安装主块上设置有角度调节机构,角度调节机构上设置有承托板,承托板上设置有转动装置,转动装置上端设置有安装架,安装架上设置有延伸机构,延伸机构以及安装架上端设置有锚固施工机构;本发明能解决现有技术对软岩及土体的岩土边坡或基坑工程进行浅层锚固治理的过程中存在的以下问题:一次只能打入一根锚杆导致效率较慢,工作人员的劳动强度较大,有坠落的风险,锚杆施工的振动会带起灰尘并影响工作人员的健康。
Intelligent anchoring construction equipment for geotechnical engineering
一种岩土工程用智能锚固施工设备
CHEN YUCHAO (Autor:in) / SHEN YONG (Autor:in) / LIU CHUNSHENG (Autor:in) / MA XIAOCHAO (Autor:in) / WANG ZHE (Autor:in) / ZHAO KE (Autor:in) / ZHANG PENG (Autor:in)
26.01.2024
Patent
Elektronische Ressource
Chinesisch
Intelligent drainage equipment for geotechnical engineering foundation construction
Europäisches Patentamt | 2022
|Anchoring device and method for geotechnical engineering
Europäisches Patentamt | 2023
|Engineering surveying equipment for geotechnical engineering construction
Europäisches Patentamt | 2022
|Intelligent geotechnical engineering
UB Braunschweig | 2005
|Intelligent drainage equipment for geotechnical engineering foundation construction and use method
Europäisches Patentamt | 2022
|