Air suction and drainage method for stadium flagpole foundation
The stadium flagpole foundation air suction and drainage method comprises the steps that firstly, a flagpole foundation space model is poured through concrete, and a hole is prefabricated in advance through a PVC pipe; 2, outer walls are built on the back face and the two side faces of the flagpole foundation, grooves are reserved in the middle, and the grooves in the two sides have slopes; 3, three PVC pipes are arranged and extend to a drainage ditch on the edge side of the stadium; fourthly, steel channels are arranged on the air blower base foundation; 5, a metal grating is arranged above the drainage groove; and 6, air blower equipment is hoisted, and wiring and pipe arrangement are conducted. The problem of drainage inside the foundation can be solved while it is guaranteed that the air blower has enough air inlet amount, and the situation that air blower equipment is damaged due to long-term soaking in rainwater is prevented.
本发明涉及一种体育场旗杆基础吸气及排水方法,包括步骤一:用混凝土浇筑旗杆基础空间模型,用PVC管提前预制洞口;步骤二:在旗杆基础的背面以及两侧面,砌筑外墙,中间留有凹槽,两侧凹槽有坡度;步骤三:设置三根PVC管,延伸至体育场边缘侧排水沟;步骤四:在鼓风机底座基础设置槽钢;步骤五:在排水凹槽上方设置金属格栅;步骤六:吊装鼓风机设备,接线布管。本发明在保证鼓风机有足够的进风量的同时,也能解决基础内部排水问题,防止鼓风机设备长期浸泡在雨水中导致损坏。
Air suction and drainage method for stadium flagpole foundation
The stadium flagpole foundation air suction and drainage method comprises the steps that firstly, a flagpole foundation space model is poured through concrete, and a hole is prefabricated in advance through a PVC pipe; 2, outer walls are built on the back face and the two side faces of the flagpole foundation, grooves are reserved in the middle, and the grooves in the two sides have slopes; 3, three PVC pipes are arranged and extend to a drainage ditch on the edge side of the stadium; fourthly, steel channels are arranged on the air blower base foundation; 5, a metal grating is arranged above the drainage groove; and 6, air blower equipment is hoisted, and wiring and pipe arrangement are conducted. The problem of drainage inside the foundation can be solved while it is guaranteed that the air blower has enough air inlet amount, and the situation that air blower equipment is damaged due to long-term soaking in rainwater is prevented.
本发明涉及一种体育场旗杆基础吸气及排水方法,包括步骤一:用混凝土浇筑旗杆基础空间模型,用PVC管提前预制洞口;步骤二:在旗杆基础的背面以及两侧面,砌筑外墙,中间留有凹槽,两侧凹槽有坡度;步骤三:设置三根PVC管,延伸至体育场边缘侧排水沟;步骤四:在鼓风机底座基础设置槽钢;步骤五:在排水凹槽上方设置金属格栅;步骤六:吊装鼓风机设备,接线布管。本发明在保证鼓风机有足够的进风量的同时,也能解决基础内部排水问题,防止鼓风机设备长期浸泡在雨水中导致损坏。
Air suction and drainage method for stadium flagpole foundation
一种体育场旗杆基础吸气及排水方法
XING ZHIYONG (Autor:in) / PENG LIMING (Autor:in) / YANG YANYING (Autor:in)
26.01.2024