Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Settlement reinforcing and lifting method for pile foundation building on large-porosity backfill soil layer
The invention discloses a pile foundation building settlement reinforcing and lifting method on a large-porosity backfill soil layer, and relates to the technical field of building settlement lifting, the pile foundation building settlement reinforcing and lifting method comprises the following steps: uniformly arranging grouting hole positions around an underground ring beam and a pile cap foundation of a to-be-lifted building, and drilling grouting holes; based on the grouting holes, grouting reinforcement treatment is conducted on a soil layer around a pile at the position above the pile end of a peripheral pile foundation of the building to be lifted; filling reinforcement and lifting treatment are conducted on the foundation below the pile ends; the soil layer around the pile at the pile body position of the peripheral pile foundation is reinforced based on the grouting holes; and filling and reinforcing the soil layer around the pile above the pile end and the soil layer around the pile below the pile end of the inner side pile foundation of the building to be lifted based on the grouting holes. The technical problem that in the prior art, when a large-porosity backfill soil layer is lifted, the strength requirement and the bottom layer bearing capacity requirement cannot be met after the large-porosity backfill soil layer is lifted is solved.
本发明公开了一种大孔隙率回填土层上的桩基础建筑沉降加固抬升方法,涉及建筑沉降抬升技术领域,包括:在待抬升建筑的地下环梁与桩承台基础周围均匀布置注浆孔位,并钻设注浆孔;基于注浆孔,对待抬升建筑的外围桩基础的桩端以上位置的桩周土层进行注浆加固处理;对桩端以下地基进行填充加固和抬升处理;基于注浆孔对外围桩基础桩身位置的桩周土层进行加固处理;基于注浆孔对待抬升建筑的内侧桩基础的桩端以上位置的桩周土层和桩端以下位置的桩周土层进行填充加固处理。本发明缓解了现有技术对大孔隙率回填土层的抬升,在抬升后不能满足强度要求和底层承载力要求的技术问题。
Settlement reinforcing and lifting method for pile foundation building on large-porosity backfill soil layer
The invention discloses a pile foundation building settlement reinforcing and lifting method on a large-porosity backfill soil layer, and relates to the technical field of building settlement lifting, the pile foundation building settlement reinforcing and lifting method comprises the following steps: uniformly arranging grouting hole positions around an underground ring beam and a pile cap foundation of a to-be-lifted building, and drilling grouting holes; based on the grouting holes, grouting reinforcement treatment is conducted on a soil layer around a pile at the position above the pile end of a peripheral pile foundation of the building to be lifted; filling reinforcement and lifting treatment are conducted on the foundation below the pile ends; the soil layer around the pile at the pile body position of the peripheral pile foundation is reinforced based on the grouting holes; and filling and reinforcing the soil layer around the pile above the pile end and the soil layer around the pile below the pile end of the inner side pile foundation of the building to be lifted based on the grouting holes. The technical problem that in the prior art, when a large-porosity backfill soil layer is lifted, the strength requirement and the bottom layer bearing capacity requirement cannot be met after the large-porosity backfill soil layer is lifted is solved.
本发明公开了一种大孔隙率回填土层上的桩基础建筑沉降加固抬升方法,涉及建筑沉降抬升技术领域,包括:在待抬升建筑的地下环梁与桩承台基础周围均匀布置注浆孔位,并钻设注浆孔;基于注浆孔,对待抬升建筑的外围桩基础的桩端以上位置的桩周土层进行注浆加固处理;对桩端以下地基进行填充加固和抬升处理;基于注浆孔对外围桩基础桩身位置的桩周土层进行加固处理;基于注浆孔对待抬升建筑的内侧桩基础的桩端以上位置的桩周土层和桩端以下位置的桩周土层进行填充加固处理。本发明缓解了现有技术对大孔隙率回填土层的抬升,在抬升后不能满足强度要求和底层承载力要求的技术问题。
Settlement reinforcing and lifting method for pile foundation building on large-porosity backfill soil layer
一种大孔隙率回填土层上的桩基础建筑沉降加固抬升方法
CUI TENGYUE (Autor:in)
26.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Large-settlement pile foundation and reinforcing method
Europäisches Patentamt | 2022
|Building foundation pile foundation reinforcing device
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|