Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shear wall split bolt hole plugging method
The invention discloses a shear wall split bolt hole plugging method, a fabricated plugging device is adopted, a plugging construction method is adopted for hole plugging construction, and the device comprises an integrated operation tool and a plugging accessory. The integrated operation tool comprises a pushing mechanism used for pushing the plugging accessory into a preset position in the split bolt hole, and a plugging mechanism used for plugging the split bolt hole after the plugging accessory is pushed into the split bolt hole. The plugging accessory comprises a rod body, a spiral convex strip arranged on the outer surface of the rod body, and a first rubber plug and a second rubber plug which are arranged at the two ends of the rod body, and the plugging accessory is provided with a first connecting hole used for being connected with the propelling mechanism and a second connecting hole used for being connected with the plugging mechanism; the second connecting hole forms a channel of the plugging material and is communicated with the gap of the spiral protruding strip, and the gap of the spiral protruding strip is filled to achieve sealing and fixed connection between the plugging accessory and the split bolt hole. The plugging efficiency and the plugging quality of the split bolt hole can be improved.
本发明公开一种剪力墙对拉螺栓孔封堵方法,采用装配式封堵装置,并采用封堵施工方法进行孔的封堵施工,装置包括一体式操作工具及封堵配件,一体式操作工具包括用以将封堵配件推入对拉螺栓孔内预设位置的推进机构、在封堵配件被推入对拉螺栓孔后对对拉螺栓孔进行封堵的封堵机构,封堵配件包括杆体、设于杆体外表面的螺旋形凸条、设于杆体两端的第一橡胶塞和第二橡胶塞,封堵配件设有用以与推进机构连接的第一连接孔以及用以与封堵机构连接的第二连接孔,所述的第二连接孔构成封堵料的通道并与螺旋形凸条的间隙连通,通过填充螺旋形凸条的间隙实现封堵配件与对拉螺栓孔的密封固定连接。本发明可提高对拉螺栓孔的封堵效率和封堵质量。
Shear wall split bolt hole plugging method
The invention discloses a shear wall split bolt hole plugging method, a fabricated plugging device is adopted, a plugging construction method is adopted for hole plugging construction, and the device comprises an integrated operation tool and a plugging accessory. The integrated operation tool comprises a pushing mechanism used for pushing the plugging accessory into a preset position in the split bolt hole, and a plugging mechanism used for plugging the split bolt hole after the plugging accessory is pushed into the split bolt hole. The plugging accessory comprises a rod body, a spiral convex strip arranged on the outer surface of the rod body, and a first rubber plug and a second rubber plug which are arranged at the two ends of the rod body, and the plugging accessory is provided with a first connecting hole used for being connected with the propelling mechanism and a second connecting hole used for being connected with the plugging mechanism; the second connecting hole forms a channel of the plugging material and is communicated with the gap of the spiral protruding strip, and the gap of the spiral protruding strip is filled to achieve sealing and fixed connection between the plugging accessory and the split bolt hole. The plugging efficiency and the plugging quality of the split bolt hole can be improved.
本发明公开一种剪力墙对拉螺栓孔封堵方法,采用装配式封堵装置,并采用封堵施工方法进行孔的封堵施工,装置包括一体式操作工具及封堵配件,一体式操作工具包括用以将封堵配件推入对拉螺栓孔内预设位置的推进机构、在封堵配件被推入对拉螺栓孔后对对拉螺栓孔进行封堵的封堵机构,封堵配件包括杆体、设于杆体外表面的螺旋形凸条、设于杆体两端的第一橡胶塞和第二橡胶塞,封堵配件设有用以与推进机构连接的第一连接孔以及用以与封堵机构连接的第二连接孔,所述的第二连接孔构成封堵料的通道并与螺旋形凸条的间隙连通,通过填充螺旋形凸条的间隙实现封堵配件与对拉螺栓孔的密封固定连接。本发明可提高对拉螺栓孔的封堵效率和封堵质量。
Shear wall split bolt hole plugging method
一种剪力墙对拉螺栓孔封堵方法
ZENG QINGJIE (Autor:in) / DU SHUANG (Autor:in) / LI XIAOQIANG (Autor:in) / HANG XINGHE (Autor:in) / WANG GENYE (Autor:in)
26.01.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for plugging split bolt hole of shear wall
Europäisches Patentamt | 2021
|Construction method for plugging split bolt hole of building outer wall
Europäisches Patentamt | 2021
|