Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for reinforcing obstacle pile to be broken in underground tunnel construction
The invention discloses a construction method for reinforcing a to-be-broken obstacle pile in underground tunnel construction. The construction method comprises the following steps that firstly, construction preparation is conducted; secondly, micro pile construction is conducted through hole forming, reinforcement cage inserting, grouting and top beam construction; thirdly, a construction platform is erected; fourthly, an initial well is excavated and supported; 5, guide rail pouring and backrest supporting are conducted; sixthly, various construction devices are installed; seventhly, the existing obstacle pile to be broken and removed is reinforced through crossed pre-stressed anchor cable locking construction; 8, the obstacle piles are broken in a static crushing mode; and ninthly, jacking construction and monitoring are conducted. According to the method, the obstacle piles can be broken and effectively reinforced in the tunnel excavation process.
本发明公开了一种地下隧道施工加固拟破除障碍桩施工工法,该工法通过以下步骤实现:步骤一、进行施工准备;步骤二、通过成孔、插入钢筋笼、灌浆和冠梁施工进行微型桩施工;步骤三、施工平台搭设;步骤四、初始井开挖和支护;步骤五、导轨浇筑和靠背支设;步骤六、安装各类施工设备;步骤七、采用交叉预应力锚索锁定施工对既有拟破除障碍桩桩进行加固处理;步骤八、以静力破碎的方式破除障碍桩;步骤九、顶进施工及监测。本发明能够在隧道开挖过程中对障碍桩进行破除并进行有效加固。
Construction method for reinforcing obstacle pile to be broken in underground tunnel construction
The invention discloses a construction method for reinforcing a to-be-broken obstacle pile in underground tunnel construction. The construction method comprises the following steps that firstly, construction preparation is conducted; secondly, micro pile construction is conducted through hole forming, reinforcement cage inserting, grouting and top beam construction; thirdly, a construction platform is erected; fourthly, an initial well is excavated and supported; 5, guide rail pouring and backrest supporting are conducted; sixthly, various construction devices are installed; seventhly, the existing obstacle pile to be broken and removed is reinforced through crossed pre-stressed anchor cable locking construction; 8, the obstacle piles are broken in a static crushing mode; and ninthly, jacking construction and monitoring are conducted. According to the method, the obstacle piles can be broken and effectively reinforced in the tunnel excavation process.
本发明公开了一种地下隧道施工加固拟破除障碍桩施工工法,该工法通过以下步骤实现:步骤一、进行施工准备;步骤二、通过成孔、插入钢筋笼、灌浆和冠梁施工进行微型桩施工;步骤三、施工平台搭设;步骤四、初始井开挖和支护;步骤五、导轨浇筑和靠背支设;步骤六、安装各类施工设备;步骤七、采用交叉预应力锚索锁定施工对既有拟破除障碍桩桩进行加固处理;步骤八、以静力破碎的方式破除障碍桩;步骤九、顶进施工及监测。本发明能够在隧道开挖过程中对障碍桩进行破除并进行有效加固。
Construction method for reinforcing obstacle pile to be broken in underground tunnel construction
地下隧道施工加固拟破除障碍桩施工工法
YANG YONG (Autor:in) / ZHOU RENRONG (Autor:in) / LIANG CUNJUN (Autor:in) / LI WEIJUN (Autor:in) / LIU LEI (Autor:in) / REN ZETIAN (Autor:in) / TANG XUYANG (Autor:in)
26.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
/
E02D
FOUNDATIONS
,
Gründungen
/
E21B
EARTH OR ROCK DRILLING
,
Erd- oder Gesteinsbohren
/
E21D
SHAFTS
,
Schächte
/
F16L
PIPES
,
Rohre
Europäisches Patentamt | 2021
|Engineering pile shallow layer broken pile reinforcing structure and construction method thereof
Europäisches Patentamt | 2021
|Underground pile type obstacle pulling construction method and system
Europäisches Patentamt | 2023
|Pile-in-pile broken pile splicing construction method
Europäisches Patentamt | 2020
|