Installation construction system and method for steel box girder of steel structure bridge
The invention relates to the technical field of building construction, in particular to an installation construction system and method for a steel box girder of a steel structure bridge. During use, a feeding plate is rotated to the position close to the ground so that a bottom plate of the steel box girder can be conveniently placed, and after the bottom plate reaches the position, a top plate is moved to a base; then the jacking device is started to jack up the top plate so as to be separated from the bottom plate, then the side plate is also moved to the base through the feeding plate, then conveying and moving are conducted through rotation of the rotation line, the side plate is kept stable in the moving process through the supporting plate, and then the side plate is preliminarily fixed through the suction cup set; and then the lifters and the angle adjusters are started to adjust the angles of the side plates, then the second air cylinders drive the side plates to move so as to make contact with the bottom plate, welding or bolt connecting is facilitated, after the two side plates are installed, the top plate and the two side plates are connected, and therefore the working efficiency is improved.
本发明涉及建筑施工技术领域,具体涉及一种钢结构桥梁的钢箱梁的安装施工系统及方法,使用时将上料板转动到靠近地面的位置,以方便放上钢箱梁的底板,在底板到位置后,还将顶板也移动到底座上,之后启动顶升器将顶板顶起以和底板分离,然后侧板也通过上料板移动到底座上,然后通过转动线转动以进行输送和移动,支撑板保持侧板在移动过程中的稳定,之后通过吸盘组将侧板进行初步固定,然后启动升降器和角度调节器调整侧板的角度,之后通过第二气缸带动侧板移动以和底板接触,方便焊接或者连接螺栓,在两个侧板安装完成后,将顶板和两个侧板进行连接,从而提高工作效率。
Installation construction system and method for steel box girder of steel structure bridge
The invention relates to the technical field of building construction, in particular to an installation construction system and method for a steel box girder of a steel structure bridge. During use, a feeding plate is rotated to the position close to the ground so that a bottom plate of the steel box girder can be conveniently placed, and after the bottom plate reaches the position, a top plate is moved to a base; then the jacking device is started to jack up the top plate so as to be separated from the bottom plate, then the side plate is also moved to the base through the feeding plate, then conveying and moving are conducted through rotation of the rotation line, the side plate is kept stable in the moving process through the supporting plate, and then the side plate is preliminarily fixed through the suction cup set; and then the lifters and the angle adjusters are started to adjust the angles of the side plates, then the second air cylinders drive the side plates to move so as to make contact with the bottom plate, welding or bolt connecting is facilitated, after the two side plates are installed, the top plate and the two side plates are connected, and therefore the working efficiency is improved.
本发明涉及建筑施工技术领域,具体涉及一种钢结构桥梁的钢箱梁的安装施工系统及方法,使用时将上料板转动到靠近地面的位置,以方便放上钢箱梁的底板,在底板到位置后,还将顶板也移动到底座上,之后启动顶升器将顶板顶起以和底板分离,然后侧板也通过上料板移动到底座上,然后通过转动线转动以进行输送和移动,支撑板保持侧板在移动过程中的稳定,之后通过吸盘组将侧板进行初步固定,然后启动升降器和角度调节器调整侧板的角度,之后通过第二气缸带动侧板移动以和底板接触,方便焊接或者连接螺栓,在两个侧板安装完成后,将顶板和两个侧板进行连接,从而提高工作效率。
Installation construction system and method for steel box girder of steel structure bridge
一种钢结构桥梁的钢箱梁的安装施工系统及方法
LI FANGDONG (Autor:in) / LI DONGSHENG (Autor:in) / MAO MINGLI (Autor:in) / LI XIANGQING (Autor:in) / YANG LUNLEI (Autor:in) / TANG YAJUN (Autor:in) / SUN QUANSHENG (Autor:in) / ZHANG YINGHAN (Autor:in) / TAO KANGHONG (Autor:in)
30.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Steel box girder installation construction method of steel structure bridge
Europäisches Patentamt | 2024
|Installation construction method of steel box girder of steel structure bridge
Europäisches Patentamt | 2021
|Steel truss girder construction method, steel truss girder and bridge structure
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|