Construction method of suspension structure between cylinder structures
The invention discloses a construction method for a suspension structure between barrel structures. The construction method comprises the following steps that S1, construction preparation is conducted; s2, construction and installation of a vertical structure and a third facade structure are completed; s3, the main framework is installed; s4, overall hoisting of the suspended floor structure on the second facade structure; and S5, layered hoisting of the suspended floor structure on the first vertical face structure is carried out. According to the construction method, due to the fact that the scheme of the roof transfer layer structure, the first facade structure, the second facade structure and the third facade structure is adopted in a suspension structure design system, an overall lifting scheme is adopted for steel structure construction, overall lifting is conducted for many times and is overlapped, and after the roof transfer layer structure is hoisted and forms a whole with the vertical structure, the overall lifting scheme is adopted; and then the lower floor is integrally lifted by utilizing the transfer truss layer, and then the lower floor is lifted by utilizing the integral transfer truss layer and the in-place floor, so that the construction is convenient, and the safety is high.
本发明公开了筒体结构间悬挂结构施工方法,包括如下步骤:S1、施工准备;S2、完成竖向结构和第三立面结构的施工安装;S3、主构架的安装;S4、第二立面结构上悬挂楼层结构的整体吊装;S5、第一立面结构上悬挂楼层结构的分层吊装。本发明的施工方法由于悬挂结构设计体系采用屋顶转换层结构及第一立面结构、第二立面结构和第三立面结构的方案,钢结构施工选用整体提升的方案,整体提升不仅多次,且互相叠加,先通过屋顶转换层结构吊装,和竖向结构形成整体后,再利用其整体提升下部的楼层,然后利用整体的转换桁架层及已经就位的楼层提升再下部的楼层,施工方便,安全性高。
Construction method of suspension structure between cylinder structures
The invention discloses a construction method for a suspension structure between barrel structures. The construction method comprises the following steps that S1, construction preparation is conducted; s2, construction and installation of a vertical structure and a third facade structure are completed; s3, the main framework is installed; s4, overall hoisting of the suspended floor structure on the second facade structure; and S5, layered hoisting of the suspended floor structure on the first vertical face structure is carried out. According to the construction method, due to the fact that the scheme of the roof transfer layer structure, the first facade structure, the second facade structure and the third facade structure is adopted in a suspension structure design system, an overall lifting scheme is adopted for steel structure construction, overall lifting is conducted for many times and is overlapped, and after the roof transfer layer structure is hoisted and forms a whole with the vertical structure, the overall lifting scheme is adopted; and then the lower floor is integrally lifted by utilizing the transfer truss layer, and then the lower floor is lifted by utilizing the integral transfer truss layer and the in-place floor, so that the construction is convenient, and the safety is high.
本发明公开了筒体结构间悬挂结构施工方法,包括如下步骤:S1、施工准备;S2、完成竖向结构和第三立面结构的施工安装;S3、主构架的安装;S4、第二立面结构上悬挂楼层结构的整体吊装;S5、第一立面结构上悬挂楼层结构的分层吊装。本发明的施工方法由于悬挂结构设计体系采用屋顶转换层结构及第一立面结构、第二立面结构和第三立面结构的方案,钢结构施工选用整体提升的方案,整体提升不仅多次,且互相叠加,先通过屋顶转换层结构吊装,和竖向结构形成整体后,再利用其整体提升下部的楼层,然后利用整体的转换桁架层及已经就位的楼层提升再下部的楼层,施工方便,安全性高。
Construction method of suspension structure between cylinder structures
筒体结构间悬挂结构施工方法
ZHANG YING (Autor:in) / JIANG YONGYANG (Autor:in) / SUN LIQI (Autor:in) / WANG LIJUAN (Autor:in) / SUN ZHONGWEI (Autor:in) / CHAI KUN (Autor:in) / LI XIAOTIAN (Autor:in)
30.01.2024
Patent
Elektronische Ressource
Chinesisch
Maerz lime kiln suspension cylinder construction method
Europäisches Patentamt | 2015
|Reverse construction method for frame-first and cylinder-second steel structure suspension structure
Europäisches Patentamt | 2024
|SUSPENSION CEILING STRUCTURE AND CONSTRUCTION METHOD OF SUSPENSION CEILING STRUCTURE
Europäisches Patentamt | 2017
|