The invention relates to a steel frame conversion supporting device and a steel frame conversion supporting system.The steel frame conversion supporting device comprises four stand columns, a steel primary beam and a steel secondary beam, a first steel base plate is arranged at the top end of each stand column, and a second steel base plate is arranged at the bottom end of each stand column; the first steel base plates at the top ends of the four stand columns are sequentially connected through steel main beams to form a rectangular frame body, a plurality of steel secondary beams are erected on the two oppositely-arranged steel main beams, and the two ends of each steel secondary beam perpendicularly extend out of the two sides of the two oppositely-arranged steel main beams respectively and are perpendicularly and fixedly connected with the steel main beams. The steel frame conversion supporting device can provide needed space and working faces for installation of electromechanical equipment and pipelines in a top plate structure supporting system and insertion before formwork removal, the construction conditions of the electromechanical equipment and pipelines are met, the installation intervention time of the electromechanical equipment and the pipelines is shortened, the construction period is shortened, the construction progress is guaranteed, and the performance of the project construction period is guaranteed; and the feasibility of construction of electromechanical equipment and pipelines before the support system is disassembled is realized.
本发明涉及一种钢架转换支撑装置及钢架转换支撑系统,钢架转换支撑装置包括立柱、钢主梁和钢次梁,所述立柱的顶端设有第一钢垫板,所述立柱的底端设有第二钢垫板,立柱为四根,四根立柱顶端的第一钢垫板分别通过钢主梁依次连接形成矩形框体,相对布置的两根钢主梁上架设有多根钢次梁,钢次梁的两端分别从相对布置的两根钢主梁两侧垂直延伸出,且与所述钢主梁垂直固定连接。本发明的钢架转换支撑装置能够为机电设备、管道安装在顶板结构支撑体系及模板拆除前插入提供所需空间、作业面,满足其施工条件,缩短机电设备、管道安装介入时间,节约工期,保证施工进度,为项目工期履约保驾护航,实现机电设备、管道安装在支撑体系未拆前施工的可行性。
Steel frame conversion supporting device and steel frame conversion supporting system
The invention relates to a steel frame conversion supporting device and a steel frame conversion supporting system.The steel frame conversion supporting device comprises four stand columns, a steel primary beam and a steel secondary beam, a first steel base plate is arranged at the top end of each stand column, and a second steel base plate is arranged at the bottom end of each stand column; the first steel base plates at the top ends of the four stand columns are sequentially connected through steel main beams to form a rectangular frame body, a plurality of steel secondary beams are erected on the two oppositely-arranged steel main beams, and the two ends of each steel secondary beam perpendicularly extend out of the two sides of the two oppositely-arranged steel main beams respectively and are perpendicularly and fixedly connected with the steel main beams. The steel frame conversion supporting device can provide needed space and working faces for installation of electromechanical equipment and pipelines in a top plate structure supporting system and insertion before formwork removal, the construction conditions of the electromechanical equipment and pipelines are met, the installation intervention time of the electromechanical equipment and the pipelines is shortened, the construction period is shortened, the construction progress is guaranteed, and the performance of the project construction period is guaranteed; and the feasibility of construction of electromechanical equipment and pipelines before the support system is disassembled is realized.
本发明涉及一种钢架转换支撑装置及钢架转换支撑系统,钢架转换支撑装置包括立柱、钢主梁和钢次梁,所述立柱的顶端设有第一钢垫板,所述立柱的底端设有第二钢垫板,立柱为四根,四根立柱顶端的第一钢垫板分别通过钢主梁依次连接形成矩形框体,相对布置的两根钢主梁上架设有多根钢次梁,钢次梁的两端分别从相对布置的两根钢主梁两侧垂直延伸出,且与所述钢主梁垂直固定连接。本发明的钢架转换支撑装置能够为机电设备、管道安装在顶板结构支撑体系及模板拆除前插入提供所需空间、作业面,满足其施工条件,缩短机电设备、管道安装介入时间,节约工期,保证施工进度,为项目工期履约保驾护航,实现机电设备、管道安装在支撑体系未拆前施工的可行性。
Steel frame conversion supporting device and steel frame conversion supporting system
一种钢架转换支撑装置及钢架转换支撑系统
XU BAOHUA (Autor:in) / DU WEI (Autor:in) / HAN CHUNPENG (Autor:in) / CHEN MIAO (Autor:in) / ZHENG DA (Autor:in) / CUI YUANQING (Autor:in) / WANG LIANG (Autor:in) / WANG PENGYANG (Autor:in) / CHEN SONG (Autor:in)
30.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste