Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention is suitable for the technical field of building engineering, and provides a building type special assembly wall which comprises a wall body, a connecting mechanism and a closing mechanism, a first cavity is formed in one end face of the wall body, a second cavity is formed in one side face of the wall body, and a first connecting groove and a second connecting groove are distributed in the other side face of the wall body. The connecting mechanism comprises a first connecting assembly and a second connecting assembly, the first connecting assembly is matched with the first connecting groove, and the second connecting assembly is matched with the second connecting groove. According to the building type special assembly wall, the connecting mechanism is matched with the first connecting groove, the second connecting groove, the sealing mechanism, the first pressure film and the second pressure film, so that the two wall bodies can be quickly aligned, and it is guaranteed that the interiors of the wall bodies are in the state of being filled with slurry; the phenomenon that multiple times of measurement and adjustment are needed in the prior art is avoided, and quick connection of the two wall bodies is achieved.
本发明适用于建筑工程技术领域,提供了一种建筑式专用装配墙体,包括墙体主体,墙体主体的一端面开设有第一空腔,墙体主体的一侧面开设有第二空腔,墙体主体的另一侧面分布有第一连接槽和第二连接槽,还包括:连接机构和封闭机构,连接机构包括第一连接组件和第二连接组件,第一连接组件与第一连接槽相配合,第二连接组件与第二连接槽相配合。本发明中的一种建筑式专用装配墙体,连接机构通过与第一连接槽、第二连接槽、封闭机构、第一压力膜和第二压力膜相配合的方式,可以实现两组墙体主体的快速对准,保证墙体主体内部处于满灌泥浆的状态,避免发生现有技术需要多次测量和调整的现象,实现两组墙体主体的快速连接。
The invention is suitable for the technical field of building engineering, and provides a building type special assembly wall which comprises a wall body, a connecting mechanism and a closing mechanism, a first cavity is formed in one end face of the wall body, a second cavity is formed in one side face of the wall body, and a first connecting groove and a second connecting groove are distributed in the other side face of the wall body. The connecting mechanism comprises a first connecting assembly and a second connecting assembly, the first connecting assembly is matched with the first connecting groove, and the second connecting assembly is matched with the second connecting groove. According to the building type special assembly wall, the connecting mechanism is matched with the first connecting groove, the second connecting groove, the sealing mechanism, the first pressure film and the second pressure film, so that the two wall bodies can be quickly aligned, and it is guaranteed that the interiors of the wall bodies are in the state of being filled with slurry; the phenomenon that multiple times of measurement and adjustment are needed in the prior art is avoided, and quick connection of the two wall bodies is achieved.
本发明适用于建筑工程技术领域,提供了一种建筑式专用装配墙体,包括墙体主体,墙体主体的一端面开设有第一空腔,墙体主体的一侧面开设有第二空腔,墙体主体的另一侧面分布有第一连接槽和第二连接槽,还包括:连接机构和封闭机构,连接机构包括第一连接组件和第二连接组件,第一连接组件与第一连接槽相配合,第二连接组件与第二连接槽相配合。本发明中的一种建筑式专用装配墙体,连接机构通过与第一连接槽、第二连接槽、封闭机构、第一压力膜和第二压力膜相配合的方式,可以实现两组墙体主体的快速对准,保证墙体主体内部处于满灌泥浆的状态,避免发生现有技术需要多次测量和调整的现象,实现两组墙体主体的快速连接。
Building type special assembly wall
一种建筑式专用装配墙体
WEI QUANYU (Autor:in)
02.02.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Shear wall special-shaped column assembly type building structure and assembly method thereof
Europäisches Patentamt | 2022
|Building curtain wall of special-shaped building and assembly method of building curtain wall
Europäisches Patentamt | 2022
|