Gate groove direct burial construction method and equipment for flood discharge tunnel water inlet tower
The invention provides a gate groove direct burial construction method and equipment for a flood discharge tunnel water inlet tower, and relates to the technical field of hydraulic engineering construction. The gate groove direct burial construction method comprises the following steps that S1, a pouring baffle is installed on the inner wall of the water inlet tower; s2, a door groove is formed in one side of the pouring baffle; s3, when the gate groove is installed, the pouring baffle is supported; s4, a main reverse rail and a cloud car are installed between the gate grooves; and S5, after installation is completed, concrete pouring is conducted. According to the construction method for directly burying the gate groove of the water inlet tower of the flood discharge tunnel, the overall construction time is shortened, the construction mode of designing second-stage concrete pouring is changed into the mode of synchronously pouring the first-stage concrete and the tower body, and therefore the quality problems such as the interface scabbling procedure before second-stage concrete construction and hollowing caused by pouring are avoided; the arrangement and disassembly of the bent tower are reduced, the overall construction period is better accelerated, and the safety risk is reduced.
本发明提供了一种用于泄洪洞进水塔的门槽直埋施工方法及设备,涉及水利工程施工技术领域,包括以下步骤:S1:在进水塔内壁上安装浇筑挡板;S2:在浇筑挡板一侧安装门槽;S3:安装门槽时对浇筑挡板进行支撑;S4:门槽之间安装主反轨和云车;S5:安装完成之后进行混凝土浇筑。本发明提供的泄洪洞进水塔门槽直埋的施工方法,减少了整体的施工时间,将设计二期混凝土浇筑的施工方式变为一期混凝土与塔身同步浇筑完成,进而避免了二期混凝土施工前的界面凿毛工序和浇筑产生空鼓等增加的质量问题,减少了排架塔设和拆除,更好的加快的整体的工期,降低安全风险。
Gate groove direct burial construction method and equipment for flood discharge tunnel water inlet tower
The invention provides a gate groove direct burial construction method and equipment for a flood discharge tunnel water inlet tower, and relates to the technical field of hydraulic engineering construction. The gate groove direct burial construction method comprises the following steps that S1, a pouring baffle is installed on the inner wall of the water inlet tower; s2, a door groove is formed in one side of the pouring baffle; s3, when the gate groove is installed, the pouring baffle is supported; s4, a main reverse rail and a cloud car are installed between the gate grooves; and S5, after installation is completed, concrete pouring is conducted. According to the construction method for directly burying the gate groove of the water inlet tower of the flood discharge tunnel, the overall construction time is shortened, the construction mode of designing second-stage concrete pouring is changed into the mode of synchronously pouring the first-stage concrete and the tower body, and therefore the quality problems such as the interface scabbling procedure before second-stage concrete construction and hollowing caused by pouring are avoided; the arrangement and disassembly of the bent tower are reduced, the overall construction period is better accelerated, and the safety risk is reduced.
本发明提供了一种用于泄洪洞进水塔的门槽直埋施工方法及设备,涉及水利工程施工技术领域,包括以下步骤:S1:在进水塔内壁上安装浇筑挡板;S2:在浇筑挡板一侧安装门槽;S3:安装门槽时对浇筑挡板进行支撑;S4:门槽之间安装主反轨和云车;S5:安装完成之后进行混凝土浇筑。本发明提供的泄洪洞进水塔门槽直埋的施工方法,减少了整体的施工时间,将设计二期混凝土浇筑的施工方式变为一期混凝土与塔身同步浇筑完成,进而避免了二期混凝土施工前的界面凿毛工序和浇筑产生空鼓等增加的质量问题,减少了排架塔设和拆除,更好的加快的整体的工期,降低安全风险。
Gate groove direct burial construction method and equipment for flood discharge tunnel water inlet tower
用于泄洪洞进水塔的门槽直埋施工方法及设备
LUO JIANPING (Autor:in) / JIANG SHANPING (Autor:in) / KUANG DEMEI (Autor:in) / LUO YOUQUAN (Autor:in) / FENG BENGUI (Autor:in) / WANG YONGWEI (Autor:in) / GAN YUANNAN (Autor:in) / QIN ZHIJUN (Autor:in) / DU WENJIN (Autor:in)
06.02.2024
Patent
Elektronische Ressource
Chinesisch
Concrete pouring equipment for flood discharge tunnel construction
Europäisches Patentamt | 2023
|Water conservancy construction flood discharge equipment
Europäisches Patentamt | 2024
|Multifunctional water gate equipment for automatic flood discharge
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|