Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of engineering construction, and discloses a column pulling supporting structure suitable for supporting a to-be-pulled column building, the to-be-pulled column building comprises a floor, a plurality of structural columns and a plurality of structural beams, the structural columns and the structural beams are suitable for supporting the floor, and the structural columns comprise to-be-pulled columns and reserved columns located on the two sides of the to-be-pulled columns. The to-be-pulled column is suitable for being removed after the pulling column supporting structure is formed, the reserved column is suitable for continuing to support the floor, and the structural beam comprises a reserved beam penetrating through the to-be-pulled column and the reserved column; the column pulling supporting structure comprises two stand column sets which are fixedly connected with the two reserved columns correspondingly and suitable for supporting a floor slab. And the spanning beam group is parallel to the reserved beam, and the two ends of the spanning beam group are fixedly connected with the two stand column groups respectively and are suitable for supporting floors. The two stand column sets share the supporting acting force of the spanning beam set, original reserved columns and reserved beams do not need to be damaged in the actual construction process, and an original structural force transmission system of a building with the columns to be pulled out is maintained.
本发明涉及工程建筑技术领域,公开了一种拔柱支撑结构,适于支撑待拔柱建筑,待拔柱建筑包括楼板、若干结构柱以及若干结构梁,结构柱和结构梁适于支撑楼板,结构柱包括拟拔柱和位于拟拔柱两侧的保留柱,拟拔柱适于在拔柱支撑结构成型后移除,保留柱适于继续支撑楼板,结构梁包括一根贯穿拟拔柱和保留柱的保留梁;拔柱支撑结构包括:两组立柱组,分别与两根保留柱固定连接并适于支撑楼板;跨越梁组,与保留梁平行设置,跨越梁组的两端分别与两组立柱组固定连接并适于支撑楼板。本发明利用两组立柱组分担跨越梁组的支撑作用力,实际施工时无需对原有的保留柱、保留梁进行破坏,维持了待拔柱建筑原有的结构传力体系。
The invention relates to the technical field of engineering construction, and discloses a column pulling supporting structure suitable for supporting a to-be-pulled column building, the to-be-pulled column building comprises a floor, a plurality of structural columns and a plurality of structural beams, the structural columns and the structural beams are suitable for supporting the floor, and the structural columns comprise to-be-pulled columns and reserved columns located on the two sides of the to-be-pulled columns. The to-be-pulled column is suitable for being removed after the pulling column supporting structure is formed, the reserved column is suitable for continuing to support the floor, and the structural beam comprises a reserved beam penetrating through the to-be-pulled column and the reserved column; the column pulling supporting structure comprises two stand column sets which are fixedly connected with the two reserved columns correspondingly and suitable for supporting a floor slab. And the spanning beam group is parallel to the reserved beam, and the two ends of the spanning beam group are fixedly connected with the two stand column groups respectively and are suitable for supporting floors. The two stand column sets share the supporting acting force of the spanning beam set, original reserved columns and reserved beams do not need to be damaged in the actual construction process, and an original structural force transmission system of a building with the columns to be pulled out is maintained.
本发明涉及工程建筑技术领域,公开了一种拔柱支撑结构,适于支撑待拔柱建筑,待拔柱建筑包括楼板、若干结构柱以及若干结构梁,结构柱和结构梁适于支撑楼板,结构柱包括拟拔柱和位于拟拔柱两侧的保留柱,拟拔柱适于在拔柱支撑结构成型后移除,保留柱适于继续支撑楼板,结构梁包括一根贯穿拟拔柱和保留柱的保留梁;拔柱支撑结构包括:两组立柱组,分别与两根保留柱固定连接并适于支撑楼板;跨越梁组,与保留梁平行设置,跨越梁组的两端分别与两组立柱组固定连接并适于支撑楼板。本发明利用两组立柱组分担跨越梁组的支撑作用力,实际施工时无需对原有的保留柱、保留梁进行破坏,维持了待拔柱建筑原有的结构传力体系。
Pull column supporting structure
拔柱支撑结构
06.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Supporting structure of protective fence supporting column
Europäisches Patentamt | 2015
|Steel structure supporting column with multiple supporting plates
Europäisches Patentamt | 2022
|