Bridge cantilever casting No.0 block and bracket construction method based on BIM
The invention belongs to the field of bridge construction, and particularly relates to a BIM-based bridge cantilever casting No.0 block and bracket construction method, which comprises the following steps: obtaining No.0 block and bracket information through a drawing and surveying and mapping, confirming and optimizing the drawing according to the surveying and mapping content, using metric structure frames, beams and support standards when a contour group is established, establishing a bracket three-dimensional model, and constructing a BIM-based bridge cantilever casting No.0 block and bracket three-dimensional model. The method comprises the following steps of: marking connection modes among components, combining and splicing a bracket model and a No.0 block model, marking positions and sizes of embedded parts, comparing data such as materials, types and quantity of the components for 7 times, and performing finite element analysis operation and modeling through a revit platform. The method comprises the following steps: updating data, marking red data after updating, integrating information of each component to obtain overall information of the component, disassembling each component, marking a connection mode and a construction mode of each component, and selecting an optimal assembly scheme according to construction cost.
本发明属于桥梁施工领域,具体涉及一种基于BIM的桥梁悬臂浇筑0号块及托架施工方法,通过图纸和测绘获取0号块及托架信息,根据测绘的内容对图纸确认并优化,建立轮廓组时使用公制结构框架、梁和支撑标准,建立托架三维模型,对各构件间的连接方式进行标注,将托架模型与0号块模型进行组合拼装,并对预埋件位置及尺寸进行标注,将构件的材质、构件的种类和构件的数量等数据进行对比,对比次数为7次,通过revit平台进行有限元分析操作以及建模,对更新后的数据进行标红,对各个构件的信息进行整合,得到构件的整体信息,再对各个构件进行拆解,对各个构件的连接方式和施工方式进行标注,根据施工成本选择最优拼装方案。
Bridge cantilever casting No.0 block and bracket construction method based on BIM
The invention belongs to the field of bridge construction, and particularly relates to a BIM-based bridge cantilever casting No.0 block and bracket construction method, which comprises the following steps: obtaining No.0 block and bracket information through a drawing and surveying and mapping, confirming and optimizing the drawing according to the surveying and mapping content, using metric structure frames, beams and support standards when a contour group is established, establishing a bracket three-dimensional model, and constructing a BIM-based bridge cantilever casting No.0 block and bracket three-dimensional model. The method comprises the following steps of: marking connection modes among components, combining and splicing a bracket model and a No.0 block model, marking positions and sizes of embedded parts, comparing data such as materials, types and quantity of the components for 7 times, and performing finite element analysis operation and modeling through a revit platform. The method comprises the following steps: updating data, marking red data after updating, integrating information of each component to obtain overall information of the component, disassembling each component, marking a connection mode and a construction mode of each component, and selecting an optimal assembly scheme according to construction cost.
本发明属于桥梁施工领域,具体涉及一种基于BIM的桥梁悬臂浇筑0号块及托架施工方法,通过图纸和测绘获取0号块及托架信息,根据测绘的内容对图纸确认并优化,建立轮廓组时使用公制结构框架、梁和支撑标准,建立托架三维模型,对各构件间的连接方式进行标注,将托架模型与0号块模型进行组合拼装,并对预埋件位置及尺寸进行标注,将构件的材质、构件的种类和构件的数量等数据进行对比,对比次数为7次,通过revit平台进行有限元分析操作以及建模,对更新后的数据进行标红,对各个构件的信息进行整合,得到构件的整体信息,再对各个构件进行拆解,对各个构件的连接方式和施工方式进行标注,根据施工成本选择最优拼装方案。
Bridge cantilever casting No.0 block and bracket construction method based on BIM
一种基于BIM的桥梁悬臂浇筑0号块及托架施工方法
FENG RONGHU (Autor:in) / ZHAO XIANGTONG (Autor:in) / YU YANGLIN (Autor:in) / WANG ZHANFEI (Autor:in) / ZHENG YANG (Autor:in) / LI JUNLONG (Autor:in) / ZHAO FANGLI (Autor:in) / CAO LIMING (Autor:in) / YANG DONGDONG (Autor:in) / HU ZONGYANG (Autor:in)
09.02.2024
Patent
Elektronische Ressource
Chinesisch
Wedge block protection mechanism and assembly type bridge cantilever construction bracket
Europäisches Patentamt | 2020
|Bracket for cantilever and cantilever construction method using the bracket
Europäisches Patentamt | 2017
|Bracket for cantilever and cantilever construction method using the bracket
Europäisches Patentamt | 2017
|Bracket for cantilever and cantilever construction method using the bracket
Europäisches Patentamt | 2020
|Bracket for cantilever and cantilever construction method using the bracket
Europäisches Patentamt | 2022