Construction method for preventing settlement during pipeline burying in collapsible loess area
The invention discloses a collapsible loess area pipeline burying settlement prevention construction method which comprises the following construction steps that S1, the range of a collapsible loess area is known through a geological exploration report, a groove is excavated, and then a grouting support is placed at the bottom of the groove; s2, a drill rod is used for drilling an anchor hole of a support anchor lug of the grouting support, and the drill rod is taken out after hole forming; s3, a first section of hollow guide pipe is inserted, and grouting equipment is connected to the top; s4, high-strength cement paste is injected in a pressurized mode, so that soil at the bottom of the groove forms a whole; s5, pipeline laying; and S6, pipeline backfilling is conducted, specifically, the collapsible loess area range is known through a geological exploration report, then a grouting support is placed at the bottom of the groove, a drill rod is used for being aligned with an anchor hole of a support anchor lug of the grouting support for drilling, after hole forming, the drill rod is taken out, a first hollow guide pipe is inserted, grouting equipment is connected to the top of the first hollow guide pipe, high-strength cement paste is injected in a pressurized mode, and grouting is conducted. Soil at the bottom of the groove is formed into a whole, collapsibility is eliminated, and then pipeline laying is conducted.
本发明公开了一种湿陷性黄土区域管道埋设防止沉降施工方法,包括以下施工步骤:S1:通过地勘报告了解湿陷性黄土区域范围,进行沟槽开挖,然后在沟槽底部安放灌浆支座;S2:使用钻杆对准灌浆支座的支座锚耳的锚孔进行钻孔,成孔后取出钻杆;S3:插入第一节空心导管,并在顶部接入灌浆设备;S4:加压灌入高强度水泥浆,使沟槽底部土质形成整体;S5:管道铺设;S6:管道回填,通过地勘报告了解湿陷性黄土区域范围,然后在沟槽底部安放灌浆支座,使用钻杆对准灌浆支座的支座锚耳的锚孔进行钻孔,成孔后取出钻杆,插入第一节空心导管,在第一节空心导管顶部接入灌浆设备,加压灌入高强度水泥浆,使沟槽底部土质形成整体消除湿陷性,在进行管道铺设。
Construction method for preventing settlement during pipeline burying in collapsible loess area
The invention discloses a collapsible loess area pipeline burying settlement prevention construction method which comprises the following construction steps that S1, the range of a collapsible loess area is known through a geological exploration report, a groove is excavated, and then a grouting support is placed at the bottom of the groove; s2, a drill rod is used for drilling an anchor hole of a support anchor lug of the grouting support, and the drill rod is taken out after hole forming; s3, a first section of hollow guide pipe is inserted, and grouting equipment is connected to the top; s4, high-strength cement paste is injected in a pressurized mode, so that soil at the bottom of the groove forms a whole; s5, pipeline laying; and S6, pipeline backfilling is conducted, specifically, the collapsible loess area range is known through a geological exploration report, then a grouting support is placed at the bottom of the groove, a drill rod is used for being aligned with an anchor hole of a support anchor lug of the grouting support for drilling, after hole forming, the drill rod is taken out, a first hollow guide pipe is inserted, grouting equipment is connected to the top of the first hollow guide pipe, high-strength cement paste is injected in a pressurized mode, and grouting is conducted. Soil at the bottom of the groove is formed into a whole, collapsibility is eliminated, and then pipeline laying is conducted.
本发明公开了一种湿陷性黄土区域管道埋设防止沉降施工方法,包括以下施工步骤:S1:通过地勘报告了解湿陷性黄土区域范围,进行沟槽开挖,然后在沟槽底部安放灌浆支座;S2:使用钻杆对准灌浆支座的支座锚耳的锚孔进行钻孔,成孔后取出钻杆;S3:插入第一节空心导管,并在顶部接入灌浆设备;S4:加压灌入高强度水泥浆,使沟槽底部土质形成整体;S5:管道铺设;S6:管道回填,通过地勘报告了解湿陷性黄土区域范围,然后在沟槽底部安放灌浆支座,使用钻杆对准灌浆支座的支座锚耳的锚孔进行钻孔,成孔后取出钻杆,插入第一节空心导管,在第一节空心导管顶部接入灌浆设备,加压灌入高强度水泥浆,使沟槽底部土质形成整体消除湿陷性,在进行管道铺设。
Construction method for preventing settlement during pipeline burying in collapsible loess area
湿陷性黄土区域管道埋设防止沉降施工方法
WANG YIFAN (Autor:in) / LI CANG (Autor:in) / TIE YULIN (Autor:in) / FANG QIONG (Autor:in)
09.02.2024
Patent
Elektronische Ressource
Chinesisch