Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dredging equipment for soil between piles of high-pile wharf and dredging construction technology
The invention discloses high-pile wharf inter-pile soil dredging equipment and a dredging construction technology, the high-pile wharf inter-pile soil dredging equipment comprises a ship body, a dredging device is arranged at the front end of the ship body, the dredging device comprises a supporting bridge frame, the supporting bridge frame is rotatably connected with the ship body through a hinge mechanism, and the dredging device further comprises a supporting bridge frame lifting mechanism for driving the supporting bridge frame to lift; two reaming wheels are symmetrically arranged on the two sides of the end of the supporting bridge frame, a plurality of sets of reaming blades are arranged in the radial direction of the reaming wheels at equal intervals, and the device further comprises a reaming wheel driving mechanism. A buoyancy tank is arranged in the middle of the supporting bridge, and limiting devices are arranged on the two sides of the buoyancy tank. And the length of the supporting bridge frame is 15 to 30 meters. According to the construction method, the construction sequence of a traditional long-piled wharf is changed in a breakthrough mode, piling is conducted firstly, then dredging is conducted, most of the working procedures of construction on the water surface in the past can be assembled on the land at present, use of ships is greatly reduced, and the construction cost is greatly reduced.
本发明公开了一种高桩码头桩间土挖泥设备及挖泥施工工艺,包括船体船体前端设置有挖泥装置,所述挖泥装置包括支撑桥架,支撑桥架与所述船体之间通过铰接机构转动连接,还包括带动所述支撑桥架起落的支撑桥架起落机构;所述支撑桥架端头两侧对称设置有2个铰轮,沿铰轮径向等间距设置有多组绞刀片,还包括铰轮驱动机构;所述支撑桥架中部设置有浮箱,浮箱两侧设置有限位装置;所述支撑桥架的长度为15‑30米。本发明突破性变革了传统的高桩码头的施工顺序,实现了先打桩再挖泥,原来在水面施工的工序现在大部分都可以在陆地上完成装配,船舶的使用大为减少,大大降低了施工成本。
Dredging equipment for soil between piles of high-pile wharf and dredging construction technology
The invention discloses high-pile wharf inter-pile soil dredging equipment and a dredging construction technology, the high-pile wharf inter-pile soil dredging equipment comprises a ship body, a dredging device is arranged at the front end of the ship body, the dredging device comprises a supporting bridge frame, the supporting bridge frame is rotatably connected with the ship body through a hinge mechanism, and the dredging device further comprises a supporting bridge frame lifting mechanism for driving the supporting bridge frame to lift; two reaming wheels are symmetrically arranged on the two sides of the end of the supporting bridge frame, a plurality of sets of reaming blades are arranged in the radial direction of the reaming wheels at equal intervals, and the device further comprises a reaming wheel driving mechanism. A buoyancy tank is arranged in the middle of the supporting bridge, and limiting devices are arranged on the two sides of the buoyancy tank. And the length of the supporting bridge frame is 15 to 30 meters. According to the construction method, the construction sequence of a traditional long-piled wharf is changed in a breakthrough mode, piling is conducted firstly, then dredging is conducted, most of the working procedures of construction on the water surface in the past can be assembled on the land at present, use of ships is greatly reduced, and the construction cost is greatly reduced.
本发明公开了一种高桩码头桩间土挖泥设备及挖泥施工工艺,包括船体船体前端设置有挖泥装置,所述挖泥装置包括支撑桥架,支撑桥架与所述船体之间通过铰接机构转动连接,还包括带动所述支撑桥架起落的支撑桥架起落机构;所述支撑桥架端头两侧对称设置有2个铰轮,沿铰轮径向等间距设置有多组绞刀片,还包括铰轮驱动机构;所述支撑桥架中部设置有浮箱,浮箱两侧设置有限位装置;所述支撑桥架的长度为15‑30米。本发明突破性变革了传统的高桩码头的施工顺序,实现了先打桩再挖泥,原来在水面施工的工序现在大部分都可以在陆地上完成装配,船舶的使用大为减少,大大降低了施工成本。
Dredging equipment for soil between piles of high-pile wharf and dredging construction technology
一种高桩码头桩间土挖泥设备及挖泥施工工艺
LIU JINQIU (Autor:in) / WANG WENHUAN (Autor:in) / XING RONGLIANG (Autor:in) / LIU CHUNYAN (Autor:in) / GUO DONG (Autor:in) / SONG ZHEN (Autor:in) / LI HAO (Autor:in) / WU SHOUSHENG (Autor:in) / WEI FANGPING (Autor:in) / ZHANG JIA (Autor:in)
09.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02F
Baggern
,
DREDGING
Dredging equipment, dredging system and dredging method below long-piled wharf
Europäisches Patentamt | 2024
|Bulk cargo wharf dredging engineering construction method
Europäisches Patentamt | 2023
|On Dredging Renovation of High-Piled Wharf by FEA
Trans Tech Publications | 2014
|