Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated dry hanging structure of multi-edge-surface special-shaped stone curtain wall and curtain wall
The invention relates to a multi-edge-surface special-shaped stone curtain wall assembly type dry hanging structure and a curtain wall, the multi-edge-surface special-shaped stone curtain wall assembly type dry hanging structure comprises a supporting assembly, a stone box and a connecting assembly, the supporting assembly comprises a plurality of supporting cross beams and a plurality of supporting stand columns, and the supporting cross beams are arranged between any two adjacent supporting stand columns; the stone box comprises a supporting frame, first connecting pieces, second connecting pieces, a plurality of side plates and a plurality of panels, the side plates are arranged in the circumferential direction of the supporting frame, the panels and the side plates are connected through the first connecting pieces, and any two adjacent panels are connected through the second connecting pieces; the connecting assembly comprises a plurality of hanging seats and hanging pieces, the hanging seats are connected with the supporting cross beam, clamping grooves are formed in the hanging seats, the hanging pieces are connected with the supporting frame, clamping buckles are arranged on the hanging pieces, and the clamping buckles are clamped in the clamping grooves. In the whole construction process, on-site welding operation is avoided, so that safety management of a construction site is better facilitated, investment of turnover materials and tools can be reduced, and the construction period can be greatly shortened.
本发明涉及一种多楞面异型石材幕墙装配式干挂结构及幕墙,包括支撑组件、石材盒子和连接组件,支撑组件包括多根支撑横梁和多根支撑立柱,支撑横梁设置在任意相邻两个支撑立柱之间;石材盒子包括支撑框、第一连接件、第二连接件、若干块侧板和若干块面板,侧板沿支撑框周向设置,面板与侧板之间通过第一连接件连接,任意相邻两个面板之间通过第二连接件连接;连接组件包括多个挂座和挂件,挂座与支撑横梁连接,挂座设置有卡槽,挂件与支撑框连接,挂件设置有卡扣,卡扣卡设在卡槽内。本发明整个施工过程避免了现场焊接作业,从而更有利于施工现场的安全管理,而且可以减少周转材料和工具的投入,可以大量缩短施工周期。
Fabricated dry hanging structure of multi-edge-surface special-shaped stone curtain wall and curtain wall
The invention relates to a multi-edge-surface special-shaped stone curtain wall assembly type dry hanging structure and a curtain wall, the multi-edge-surface special-shaped stone curtain wall assembly type dry hanging structure comprises a supporting assembly, a stone box and a connecting assembly, the supporting assembly comprises a plurality of supporting cross beams and a plurality of supporting stand columns, and the supporting cross beams are arranged between any two adjacent supporting stand columns; the stone box comprises a supporting frame, first connecting pieces, second connecting pieces, a plurality of side plates and a plurality of panels, the side plates are arranged in the circumferential direction of the supporting frame, the panels and the side plates are connected through the first connecting pieces, and any two adjacent panels are connected through the second connecting pieces; the connecting assembly comprises a plurality of hanging seats and hanging pieces, the hanging seats are connected with the supporting cross beam, clamping grooves are formed in the hanging seats, the hanging pieces are connected with the supporting frame, clamping buckles are arranged on the hanging pieces, and the clamping buckles are clamped in the clamping grooves. In the whole construction process, on-site welding operation is avoided, so that safety management of a construction site is better facilitated, investment of turnover materials and tools can be reduced, and the construction period can be greatly shortened.
本发明涉及一种多楞面异型石材幕墙装配式干挂结构及幕墙,包括支撑组件、石材盒子和连接组件,支撑组件包括多根支撑横梁和多根支撑立柱,支撑横梁设置在任意相邻两个支撑立柱之间;石材盒子包括支撑框、第一连接件、第二连接件、若干块侧板和若干块面板,侧板沿支撑框周向设置,面板与侧板之间通过第一连接件连接,任意相邻两个面板之间通过第二连接件连接;连接组件包括多个挂座和挂件,挂座与支撑横梁连接,挂座设置有卡槽,挂件与支撑框连接,挂件设置有卡扣,卡扣卡设在卡槽内。本发明整个施工过程避免了现场焊接作业,从而更有利于施工现场的安全管理,而且可以减少周转材料和工具的投入,可以大量缩短施工周期。
Fabricated dry hanging structure of multi-edge-surface special-shaped stone curtain wall and curtain wall
一种多楞面异型石材幕墙装配式干挂结构及幕墙
ZHANG YUEXIA (Autor:in) / XU TING (Autor:in) / DONG KAN (Autor:in) / LI SHUIHUAN (Autor:in) / YANG ZHONGMING (Autor:in)
13.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Dry hanging stone curtain wall construction method and curtain wall structure
Europäisches Patentamt | 2024
|Stone curtain wall hanging device and anti-collision and anti-falling stone curtain wall
Europäisches Patentamt | 2024
|Stone curtain wall connecting piece and stone curtain wall back bolt dry hanging method
Europäisches Patentamt | 2022
|Internal sealing dry hanging stone curtain wall structure
Europäisches Patentamt | 2023
|