Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reinforcement cage auxiliary mounting equipment and bridge construction method
The invention relates to auxiliary mounting equipment for a reinforcement cage and a bridge construction method, the auxiliary mounting equipment for the reinforcement cage comprises a main body, a guide block, an adjusting shaft, a limiting block and a first adjusting assembly, and the main body is provided with a first through hole for the reinforcement cage to penetrate through; the guide block is arranged on the main body and covers the first through hole, and a guide hole communicated with the first through hole is formed in the guide block; an inlet/outlet communicated with the guide hole is formed in the guide block; the adjusting shaft is rotationally arranged on the main body, the limiting block drives the adjusting shaft, and the limiting block can block the inlet and outlet; the first adjusting assembly is arranged on the main body and connected with the adjusting shaft. The method has the effect of guaranteeing the quality of the bridge.
本申请涉及一种钢筋笼辅助安装设备及桥梁施工方法,钢筋笼辅助安装设备包括主体、导向块、调节轴、限制块和第一调节组件,所述主体上开设有供钢筋笼穿过的第一通孔;所述导向块设置在所述主体上且覆盖所述第一通孔,所述导向块上开设有与所述第一通孔连通的导向孔;所述导向块上开设有与所述导向孔连通的进出口;所述调节轴转动设置在所述主体上,所述限制块带动调节轴上,且所述限制块能够封堵所述进出口;所述第一调节组件设置在所述主体上且与所述调节轴连接。本申请具有保障桥梁的质量的效果。
Reinforcement cage auxiliary mounting equipment and bridge construction method
The invention relates to auxiliary mounting equipment for a reinforcement cage and a bridge construction method, the auxiliary mounting equipment for the reinforcement cage comprises a main body, a guide block, an adjusting shaft, a limiting block and a first adjusting assembly, and the main body is provided with a first through hole for the reinforcement cage to penetrate through; the guide block is arranged on the main body and covers the first through hole, and a guide hole communicated with the first through hole is formed in the guide block; an inlet/outlet communicated with the guide hole is formed in the guide block; the adjusting shaft is rotationally arranged on the main body, the limiting block drives the adjusting shaft, and the limiting block can block the inlet and outlet; the first adjusting assembly is arranged on the main body and connected with the adjusting shaft. The method has the effect of guaranteeing the quality of the bridge.
本申请涉及一种钢筋笼辅助安装设备及桥梁施工方法,钢筋笼辅助安装设备包括主体、导向块、调节轴、限制块和第一调节组件,所述主体上开设有供钢筋笼穿过的第一通孔;所述导向块设置在所述主体上且覆盖所述第一通孔,所述导向块上开设有与所述第一通孔连通的导向孔;所述导向块上开设有与所述导向孔连通的进出口;所述调节轴转动设置在所述主体上,所述限制块带动调节轴上,且所述限制块能够封堵所述进出口;所述第一调节组件设置在所述主体上且与所述调节轴连接。本申请具有保障桥梁的质量的效果。
Reinforcement cage auxiliary mounting equipment and bridge construction method
一种钢筋笼辅助安装设备及桥梁施工方法
WANG JIAWEI (Autor:in) / YOU SIYI (Autor:in)
20.02.2024
Patent
Elektronische Ressource
Chinesisch
Bridge reinforcement cage stabilizing device and bridge reinforcement mounting method
Europäisches Patentamt | 2024
|Auxiliary mechanical hand for bridge large-scale reinforcement cage construction
Europäisches Patentamt | 2020
|Reinforcement cage mounting device and reinforcement cage mounting method
Europäisches Patentamt | 2024
|Auxiliary mounting device and construction method for tubular pile core filling reinforcement cage
Europäisches Patentamt | 2024
|Mounting equipment and mounting method for large reinforcement cage
Europäisches Patentamt | 2021
|