Backfill construction method suitable for backfill engineering of clean area and complex space
The invention provides a backfill construction method suitable for backfill engineering of a clean area and a complex space. Comprising building internal backfilling and outdoor backfilling, and specifically comprises the following steps that S1, building internal backfilling is conducted, and a pre-buried pipeline is constructed; s2, indoor pipelines are spliced; s3, a pipeline lower supporting frame body is erected; s4, an outdoor chute is erected; s5, the backfilling sequence is from far to near, the pipeline is dismantled section by section along with backfilling and gradually retreats, the backfilling area is filled, and unloading backfilling and manual leveling are carried out; and S6, the steps are repeated according to different paths in the building, and backfilling construction is completed. S7, waterproof layer and protective layer construction is conducted, and acceptance check is completed; s8, cleaning the bottom of the foundation pit; s9, the layered elevation control line is elastically arranged; S10, the retaining wall is built, and layered backfilling is carried out; and S11, the previous step is repeated till the elevation is achieved through backfilling layer by layer. The technical problems that a traditional backfilling method is long in construction period, large in environmental damage, difficult in construction and not beneficial to cleaning and cleaning work after construction is completed are solved.
本发明提供一种适用于洁净区和复杂空间回填工程的回填施工方法。包括建筑内回填和室外回填,具体步骤如下:建筑内回填:S1、预埋管道施工;S2、室内管道拼接;S3、管道下支撑架体搭设;S4、室外溜槽搭设;S5、回填顺序由远及近,管道随回填随按段拆除,逐步后退,充盈回填区域,卸料回填人工整平;S6、建筑内根据不同路径,重复以上步骤,完成回填施工;室外回填:S7、防水层及保护层施工、验收完毕;S8、基坑底清理;S9、分层标高控制线弹设,S10、挡墙砌筑、分层回填;S11、重复上一步骤,直至逐层回填至标高。本发明解决了传统的回填方法施工周期长、环境破坏大,施工困难,不利于施工完成后的洁净保洁工作的技术问题。
Backfill construction method suitable for backfill engineering of clean area and complex space
The invention provides a backfill construction method suitable for backfill engineering of a clean area and a complex space. Comprising building internal backfilling and outdoor backfilling, and specifically comprises the following steps that S1, building internal backfilling is conducted, and a pre-buried pipeline is constructed; s2, indoor pipelines are spliced; s3, a pipeline lower supporting frame body is erected; s4, an outdoor chute is erected; s5, the backfilling sequence is from far to near, the pipeline is dismantled section by section along with backfilling and gradually retreats, the backfilling area is filled, and unloading backfilling and manual leveling are carried out; and S6, the steps are repeated according to different paths in the building, and backfilling construction is completed. S7, waterproof layer and protective layer construction is conducted, and acceptance check is completed; s8, cleaning the bottom of the foundation pit; s9, the layered elevation control line is elastically arranged; S10, the retaining wall is built, and layered backfilling is carried out; and S11, the previous step is repeated till the elevation is achieved through backfilling layer by layer. The technical problems that a traditional backfilling method is long in construction period, large in environmental damage, difficult in construction and not beneficial to cleaning and cleaning work after construction is completed are solved.
本发明提供一种适用于洁净区和复杂空间回填工程的回填施工方法。包括建筑内回填和室外回填,具体步骤如下:建筑内回填:S1、预埋管道施工;S2、室内管道拼接;S3、管道下支撑架体搭设;S4、室外溜槽搭设;S5、回填顺序由远及近,管道随回填随按段拆除,逐步后退,充盈回填区域,卸料回填人工整平;S6、建筑内根据不同路径,重复以上步骤,完成回填施工;室外回填:S7、防水层及保护层施工、验收完毕;S8、基坑底清理;S9、分层标高控制线弹设,S10、挡墙砌筑、分层回填;S11、重复上一步骤,直至逐层回填至标高。本发明解决了传统的回填方法施工周期长、环境破坏大,施工困难,不利于施工完成后的洁净保洁工作的技术问题。
Backfill construction method suitable for backfill engineering of clean area and complex space
一种适用于洁净区和复杂空间回填工程的回填施工方法
JIANG SHUAI (Autor:in) / YAO XUANCHEN (Autor:in) / GUO TENG (Autor:in) / YANG JINWEI (Autor:in) / ZHU BOQI (Autor:in) / LI CHENGZE (Autor:in) / YIN HONG (Autor:in)
20.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Backfill material suitable for deepwater area cofferdam and backfill device of backfill material
Europäisches Patentamt | 2023
|Phosphogypsum engineering backfill material and backfill method
Europäisches Patentamt | 2023
|Backfill material suitable for karst regions and backfill method thereof
Europäisches Patentamt | 2020
|Underground engineering backfill soil construction method
Europäisches Patentamt | 2022
|BACKFILL MATERIAL, BACKFILL METHOD, AND BACKFILL MATERIAL MANUFACTURING METHOD
Europäisches Patentamt | 2020
|