Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hoisting construction method for building adopting modular explosion venting plates
The invention relates to the technical field of explosion venting plant construction, and discloses a hoisting construction method for a building adopting modular explosion venting plates, which comprises the steps of roof construction, module explosion venting plate manufacturing, longitudinal and transverse keel installation, module explosion venting plate hoisting, correction and welding, plate gap treatment and the like. The explosion venting plate keel is welded according to the size of the module explosion venting plate, when the module explosion venting plate meets door and window openings, positions are reserved for installing the door and window sizes, tailoring and typesetting are conducted, then one side of the welded explosion venting plate keel is coated with a weather-proof sealant, and the inner wall plate is laid on the explosion venting plate keel. The explosion venting plate keel is filled with the rock wool plate perpendicular to the keel, the other side of the explosion venting plate keel is coated with the weather-proof sealant, the outer wall plate is laid on the explosion venting plate keel, and the construction speed is increased.
本发明涉及泄爆厂房施工技术领域,公开了一种采用模块化泄爆板建筑的吊装施工方法,包括:屋面施工、模块泄爆板制作、纵横龙骨安装、模块泄爆板吊装、校正及焊接和板缝隙处理等步骤,不同于现有泄爆板逐块安装的方式,本发明根据模块泄爆板的尺寸对泄爆板龙骨进行焊接,模块泄爆板遇门、窗洞口时安装门、窗尺寸留出位置,并进行裁剪排版,然后在焊接好的泄爆板龙骨一侧打一道耐候胶,将内墙板铺贴于泄爆板龙骨上,在泄爆板龙骨内垂直于龙骨填充岩棉板,在泄爆板龙骨的另一侧打一道耐候胶,将外墙板铺贴于泄爆板龙骨上,提高施工速度。
Hoisting construction method for building adopting modular explosion venting plates
The invention relates to the technical field of explosion venting plant construction, and discloses a hoisting construction method for a building adopting modular explosion venting plates, which comprises the steps of roof construction, module explosion venting plate manufacturing, longitudinal and transverse keel installation, module explosion venting plate hoisting, correction and welding, plate gap treatment and the like. The explosion venting plate keel is welded according to the size of the module explosion venting plate, when the module explosion venting plate meets door and window openings, positions are reserved for installing the door and window sizes, tailoring and typesetting are conducted, then one side of the welded explosion venting plate keel is coated with a weather-proof sealant, and the inner wall plate is laid on the explosion venting plate keel. The explosion venting plate keel is filled with the rock wool plate perpendicular to the keel, the other side of the explosion venting plate keel is coated with the weather-proof sealant, the outer wall plate is laid on the explosion venting plate keel, and the construction speed is increased.
本发明涉及泄爆厂房施工技术领域,公开了一种采用模块化泄爆板建筑的吊装施工方法,包括:屋面施工、模块泄爆板制作、纵横龙骨安装、模块泄爆板吊装、校正及焊接和板缝隙处理等步骤,不同于现有泄爆板逐块安装的方式,本发明根据模块泄爆板的尺寸对泄爆板龙骨进行焊接,模块泄爆板遇门、窗洞口时安装门、窗尺寸留出位置,并进行裁剪排版,然后在焊接好的泄爆板龙骨一侧打一道耐候胶,将内墙板铺贴于泄爆板龙骨上,在泄爆板龙骨内垂直于龙骨填充岩棉板,在泄爆板龙骨的另一侧打一道耐候胶,将外墙板铺贴于泄爆板龙骨上,提高施工速度。
Hoisting construction method for building adopting modular explosion venting plates
一种采用模块化泄爆板建筑的吊装施工方法
ZHENG ZHONGYUAN (Autor:in) / WANG XIAOQI (Autor:in) / CUI GUANGYU (Autor:in)
20.02.2024
Patent
Elektronische Ressource
Chinesisch