Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Quick steel bar hanging device for cast-in-place concrete pile
The invention relates to the technical field of cast-in-place concrete pile construction, in particular to a cast-in-place concrete pile rapid bar hanging device which comprises a first rod body and a second rod body, a penetrating opening is formed in the middle section of the first rod body, the second rod body penetrates through the penetrating opening, a rotating shaft penetrates through the first rod body and is rotatably installed on the first rod body, and the lower end of the rotating shaft is rotatably installed in the penetrating opening. The rotating shaft penetrates through the second rod body and is fixedly connected with the second rod body, the two ends of the first rod body are each provided with a first connecting mechanism, the top plate is further included, the upper ends of the four steel cables penetrate through the top plate, a lifting hook is fixedly installed in the center of the top of the top plate, and winding mechanisms are installed on the top of the top plate. The distance between the first movable rod and the second movable rod is adjusted by adjusting the distance between the first movable rod and the second movable rod, so that when the distance between the main steel bars changes, the rapid steel bar hanging device for the cast-in-place concrete pile is suitable for steel bar cages with different distances by adjusting the distance between the first movable rod and the second movable rod in the rapid steel bar hanging device for the cast-in-place concrete pile.
本发明涉及钢筋混凝土灌注桩施工技术领域,尤其是一种混凝土灌注桩快捷吊筋装置,包括杆体一和杆体二,杆体一中段开设有穿口,杆体二贯穿穿口,杆体一上贯穿并可转动安装有转轴,转轴下端可转动安装在穿口内,转轴贯穿杆体二并与杆体二固定连接,杆体一两端均设置有连接机构一,还包括顶板,四条钢索的上端均贯穿顶板,顶板顶部中央处固定安装有吊钩,顶板顶部均安装有卷收机构,通过设置穿口和转轴,杆体一和杆体二可绕着转轴转动,从而调节活动杆一和活动杆二之间的间距,从而当主钢筋之间的间距发生变化时,通过调节混凝土灌注桩快捷吊筋装置中的活动杆一和活动杆二结构的间距和调节,因而来适用不同间距的钢筋笼。
Quick steel bar hanging device for cast-in-place concrete pile
The invention relates to the technical field of cast-in-place concrete pile construction, in particular to a cast-in-place concrete pile rapid bar hanging device which comprises a first rod body and a second rod body, a penetrating opening is formed in the middle section of the first rod body, the second rod body penetrates through the penetrating opening, a rotating shaft penetrates through the first rod body and is rotatably installed on the first rod body, and the lower end of the rotating shaft is rotatably installed in the penetrating opening. The rotating shaft penetrates through the second rod body and is fixedly connected with the second rod body, the two ends of the first rod body are each provided with a first connecting mechanism, the top plate is further included, the upper ends of the four steel cables penetrate through the top plate, a lifting hook is fixedly installed in the center of the top of the top plate, and winding mechanisms are installed on the top of the top plate. The distance between the first movable rod and the second movable rod is adjusted by adjusting the distance between the first movable rod and the second movable rod, so that when the distance between the main steel bars changes, the rapid steel bar hanging device for the cast-in-place concrete pile is suitable for steel bar cages with different distances by adjusting the distance between the first movable rod and the second movable rod in the rapid steel bar hanging device for the cast-in-place concrete pile.
本发明涉及钢筋混凝土灌注桩施工技术领域,尤其是一种混凝土灌注桩快捷吊筋装置,包括杆体一和杆体二,杆体一中段开设有穿口,杆体二贯穿穿口,杆体一上贯穿并可转动安装有转轴,转轴下端可转动安装在穿口内,转轴贯穿杆体二并与杆体二固定连接,杆体一两端均设置有连接机构一,还包括顶板,四条钢索的上端均贯穿顶板,顶板顶部中央处固定安装有吊钩,顶板顶部均安装有卷收机构,通过设置穿口和转轴,杆体一和杆体二可绕着转轴转动,从而调节活动杆一和活动杆二之间的间距,从而当主钢筋之间的间距发生变化时,通过调节混凝土灌注桩快捷吊筋装置中的活动杆一和活动杆二结构的间距和调节,因而来适用不同间距的钢筋笼。
Quick steel bar hanging device for cast-in-place concrete pile
一种混凝土灌注桩快捷吊筋装置
JIANG BO (Autor:in) / QIN YONG (Autor:in) / NING SHIKAI (Autor:in) / LI BIN (Autor:in) / ZHANG FUQIANG (Autor:in) / YU LINCHAO (Autor:in) / REN HAITAO (Autor:in) / ZHANG JUN (Autor:in) / WANG CHAOHUI (Autor:in) / MA CHENG (Autor:in)
23.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cast-in-place steel concrete unsupported hanging formwork device
Europäisches Patentamt | 2020
|METHOD FOR CAST-IN-PLACE PILE CONSTRUCTION USING HANGING STRUCTURE AND HANGING STRUCTURE
Europäisches Patentamt | 2017
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
Europäisches Patentamt | 2019
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
Europäisches Patentamt | 2019
|