Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for repairing concrete foundation of transformer substation
The invention discloses a repairing method for a concrete foundation of a transformer substation. The repairing method comprises the steps of trepanning, pile placement, pouring, protection and maintenance. A hole forming step: forming a repair hole in the crack of the concrete foundation of the transformer substation, wherein the size of the repair hole is greater than that of the crack; a pile placing step: firstly cleaning residues inside and around the repair hole, then inserting the pile rod into the repair hole, and positioning the pile rod, so that gaps are formed between the periphery of the pile rod and the inner side wall of the repair hole; pouring, wherein filling slurry is poured into the repairing hole, and the gap is fully filled with the filling slurry; protective cloth is laid on the upper portions of the repairing holes, and the space between the protective cloth and the concrete foundation and the space between the protective cloth and the pile rods are filled with filling slurry; and a maintenance step: maintaining the repaired position. The repairing method for the concrete foundation of the transformer substation is high in repairing speed, high in repairing strength and good in corrosion resistance.
本申请公开了一种变电站混凝土基础修复方法,包括开孔步骤、放桩步骤、浇筑步骤、防护步骤以及养护步骤;开孔步骤:在变电站的混凝土基础的裂缝处开设修复孔,且修复孔的尺寸大于裂缝的尺寸;放桩步骤:先对修复孔的内部以及四周的残留物进行清理,再将桩杆插入修复孔内,并对桩杆进行定位,使桩杆的四周均与修复孔的内侧壁之间产生空隙;浇筑步骤:向修复孔内灌入填充浆料,使填充浆料充分填充空隙;防护步骤:在修复孔上部铺设防护布,并使防护布与混凝土基础之间以及防护布与桩杆之间均填充有填充浆料;养护步骤:对修复位置进行养护。该变电站混凝土基础修复方法的修复速度快,修复强度高,且防腐性好。
Method for repairing concrete foundation of transformer substation
The invention discloses a repairing method for a concrete foundation of a transformer substation. The repairing method comprises the steps of trepanning, pile placement, pouring, protection and maintenance. A hole forming step: forming a repair hole in the crack of the concrete foundation of the transformer substation, wherein the size of the repair hole is greater than that of the crack; a pile placing step: firstly cleaning residues inside and around the repair hole, then inserting the pile rod into the repair hole, and positioning the pile rod, so that gaps are formed between the periphery of the pile rod and the inner side wall of the repair hole; pouring, wherein filling slurry is poured into the repairing hole, and the gap is fully filled with the filling slurry; protective cloth is laid on the upper portions of the repairing holes, and the space between the protective cloth and the concrete foundation and the space between the protective cloth and the pile rods are filled with filling slurry; and a maintenance step: maintaining the repaired position. The repairing method for the concrete foundation of the transformer substation is high in repairing speed, high in repairing strength and good in corrosion resistance.
本申请公开了一种变电站混凝土基础修复方法,包括开孔步骤、放桩步骤、浇筑步骤、防护步骤以及养护步骤;开孔步骤:在变电站的混凝土基础的裂缝处开设修复孔,且修复孔的尺寸大于裂缝的尺寸;放桩步骤:先对修复孔的内部以及四周的残留物进行清理,再将桩杆插入修复孔内,并对桩杆进行定位,使桩杆的四周均与修复孔的内侧壁之间产生空隙;浇筑步骤:向修复孔内灌入填充浆料,使填充浆料充分填充空隙;防护步骤:在修复孔上部铺设防护布,并使防护布与混凝土基础之间以及防护布与桩杆之间均填充有填充浆料;养护步骤:对修复位置进行养护。该变电站混凝土基础修复方法的修复速度快,修复强度高,且防腐性好。
Method for repairing concrete foundation of transformer substation
一种变电站混凝土基础修复方法
WANG LONGZHEN (Autor:in) / ZHAO QIAN (Autor:in) / CHEN JIANFANG (Autor:in) / LIU CHANGHONG (Autor:in) / LIU JUNJIE (Autor:in) / ZHANG CHENCHEN (Autor:in) / ZHANG JIE (Autor:in) / XING MINGJUN (Autor:in) / ZHAO CHENGJIU (Autor:in) / XU YUNSHENG (Autor:in)
23.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Transformer substation concrete foundation evaluation method
Europäisches Patentamt | 2023
|Substation equipment foundation repairing device and method
Europäisches Patentamt | 2022
|Transformer installation foundation and transformer substation
Europäisches Patentamt | 2021
|