The invention relates to an industrial factory building indoor layer adding newly-added side column and outer wall structure connection and a construction method thereof. The industrial factory building indoor layer adding newly-added side column and outer wall structure connection comprises newly-added side columns, newly-added ring beams, concrete pin keys, steel tie bars and steel base plates. The newly-added side column is arranged in the middle of the outer wall of the original structure. The concrete pin keys are arranged at the 1/3 and 2/3 floor height positions of the original structure outer wall, and meanwhile two steel tie bars are arranged to be connected with the original structure outer wall. The steel tie bars are # imgabs0 # 16 steel bars, penetrate through the through holes of the wall body and the steel base plate, extend out of the end part of the outer wall of the original structure, and are fastened and connected by adopting nuts; two through holes are uniformly distributed in the steel base plate; the newly-added ring beam is tightly attached to the inner side of the original structure outer wall and is closed to form a circle. The newly-added side columns, the concrete pin keys and the newly-added ring beams are integrally poured together, and the problem that an original house is poor in anti-seismic property in industrial factory building transformation is fundamentally solved.
本发明涉及一种工业厂房室内加层新增边柱与外墙结构连接及其施工方法,包括新增边柱、新增圈梁、混凝土销键、拉结钢筋、钢垫板;所述的新增边柱布置在原结构外墙的中间部位;所述的混凝土销键布置在原结构外墙的楼层1/3和2/3层高处,同时设置两根拉结钢筋与原结构外墙连接;所述的拉结钢筋为#imgabs0#16的钢筋穿过墙体通孔和钢垫板,伸出原结构外墙的端部采用螺母紧固连接;所述的钢垫板上均匀分布两个通孔;所述的新增圈梁紧贴原结构外墙内侧设置并闭合成圈;所述的新增边柱、混凝土销键和新增圈梁整体浇筑在一起,从根本上解决了工业厂房改造中原房屋抗震性能较差的问题。
The invention relates to an industrial factory building indoor layer adding newly-added side column and outer wall structure connection and a construction method thereof. The industrial factory building indoor layer adding newly-added side column and outer wall structure connection comprises newly-added side columns, newly-added ring beams, concrete pin keys, steel tie bars and steel base plates. The newly-added side column is arranged in the middle of the outer wall of the original structure. The concrete pin keys are arranged at the 1/3 and 2/3 floor height positions of the original structure outer wall, and meanwhile two steel tie bars are arranged to be connected with the original structure outer wall. The steel tie bars are # imgabs0 # 16 steel bars, penetrate through the through holes of the wall body and the steel base plate, extend out of the end part of the outer wall of the original structure, and are fastened and connected by adopting nuts; two through holes are uniformly distributed in the steel base plate; the newly-added ring beam is tightly attached to the inner side of the original structure outer wall and is closed to form a circle. The newly-added side columns, the concrete pin keys and the newly-added ring beams are integrally poured together, and the problem that an original house is poor in anti-seismic property in industrial factory building transformation is fundamentally solved.
本发明涉及一种工业厂房室内加层新增边柱与外墙结构连接及其施工方法,包括新增边柱、新增圈梁、混凝土销键、拉结钢筋、钢垫板;所述的新增边柱布置在原结构外墙的中间部位;所述的混凝土销键布置在原结构外墙的楼层1/3和2/3层高处,同时设置两根拉结钢筋与原结构外墙连接;所述的拉结钢筋为#imgabs0#16的钢筋穿过墙体通孔和钢垫板,伸出原结构外墙的端部采用螺母紧固连接;所述的钢垫板上均匀分布两个通孔;所述的新增圈梁紧贴原结构外墙内侧设置并闭合成圈;所述的新增边柱、混凝土销键和新增圈梁整体浇筑在一起,从根本上解决了工业厂房改造中原房屋抗震性能较差的问题。
Industrial factory building indoor floor adding and newly added side column and outer wall structure connection and construction method thereof
工业厂房室内加层新增边柱与外墙结构连接及其施工方法
23.02.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Steel structure factory building outer wall and outer wall construction method
Europäisches Patentamt | 2025
|Steel structure factory building outer wall and outer wall construction method
Europäisches Patentamt | 2024
|