Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wall crack control device and control method
The invention relates to the technical field of constructional engineering, and discloses a wall crack control device and a wall crack control method, aiming at the problem that a wall crack can still appear again or even become larger after a period of time when the crack is filled and sealed by using a traditional method, the wall crack control device comprises a telescopic rod, a first mounting block and a second mounting block are arranged at the two ends of the telescopic rod correspondingly, a plurality of bolts for fixing the mounting plate are arranged on one side of each of the first mounting block and the second mounting block, a first spring for driving the telescopic rod to retract all the time is arranged on the outer side wall of the telescopic rod, and a limiting piece for limiting the telescopic rod to stretch out and draw back is further arranged on the outer side wall of the telescopic rod; the first spring is always in a stretching state. Through the arrangement, the wall crack can be prevented from being further expanded.
本发明涉及建筑工程技术领域,针对利用传统方法填补和封闭裂缝,一段时间后,墙体裂缝仍然可能再次出现,甚至可能变得更大的问题,公开了一种墙体裂缝控制装置及控制方法,其中墙体裂缝控制装置包括伸缩杆,伸缩杆的两端分别设有第一安装块以及第二安装块,第一安装块以及第二安装块的一侧均设有若干用于固定安装板的螺栓,伸缩杆的外侧壁设有始终驱动伸缩杆收缩的第一弹簧,伸缩杆的外侧壁还设有用于限制伸缩杆伸缩的限制件,第一弹簧始终处于拉伸状态。通过上述设置,有利于防止墙体裂缝进一步扩大。
Wall crack control device and control method
The invention relates to the technical field of constructional engineering, and discloses a wall crack control device and a wall crack control method, aiming at the problem that a wall crack can still appear again or even become larger after a period of time when the crack is filled and sealed by using a traditional method, the wall crack control device comprises a telescopic rod, a first mounting block and a second mounting block are arranged at the two ends of the telescopic rod correspondingly, a plurality of bolts for fixing the mounting plate are arranged on one side of each of the first mounting block and the second mounting block, a first spring for driving the telescopic rod to retract all the time is arranged on the outer side wall of the telescopic rod, and a limiting piece for limiting the telescopic rod to stretch out and draw back is further arranged on the outer side wall of the telescopic rod; the first spring is always in a stretching state. Through the arrangement, the wall crack can be prevented from being further expanded.
本发明涉及建筑工程技术领域,针对利用传统方法填补和封闭裂缝,一段时间后,墙体裂缝仍然可能再次出现,甚至可能变得更大的问题,公开了一种墙体裂缝控制装置及控制方法,其中墙体裂缝控制装置包括伸缩杆,伸缩杆的两端分别设有第一安装块以及第二安装块,第一安装块以及第二安装块的一侧均设有若干用于固定安装板的螺栓,伸缩杆的外侧壁设有始终驱动伸缩杆收缩的第一弹簧,伸缩杆的外侧壁还设有用于限制伸缩杆伸缩的限制件,第一弹簧始终处于拉伸状态。通过上述设置,有利于防止墙体裂缝进一步扩大。
Wall crack control device and control method
一种墙体裂缝控制装置及控制方法
GUO ZHIXIANG (Autor:in) / YANG YUN (Autor:in) / XIAO ZUPING (Autor:in) / HE LINGLIN (Autor:in) / HE WENYUE (Autor:in) / LONG JIANBIN (Autor:in) / WANG QIZENG (Autor:in)
23.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building wall concrete crack control construction method
Europäisches Patentamt | 2023
|Super-long basement wall crack control device and construction method thereof
Europäisches Patentamt | 2021
|Ship lock chamber wall mass concrete crack control method
Europäisches Patentamt | 2024
|Temperature monitoring based crack control method for wall body
Europäisches Patentamt | 2015
|Crack control method for cast-in-place concrete shear wall
Europäisches Patentamt | 2022
|