Arched inhaul cable temporary steel trestle structure and construction method
The invention relates to the technical field of steel structure manufacturing, in particular to an arched inhaul cable temporary steel trestle structure which can allow a truck crane to walk, is safe and convenient to use and increases the material turnover rate, in the temporary steel trestle structure, trestle standard knots are connected through bolts, and an arched cross beam and a steel trestle body are connected through bolts. Due to the fact that the steel trestle body is formed by connecting the trestle standard knots with the standard length through the connecting lug plates and the high-strength bolts, the length of the steel trestle body can be actually increased on site, the construction period of the temporary steel trestle structure is shortened, the number of times of recycling of the temporary steel trestle structure is increased, the material turnover rate is increased, and the engineering cost is reduced; the middle part of the arched beam structure is connected with the steel trestle body through the steel wire rope, so that the load bearing capacity of the temporary steel trestle structure is greatly enhanced; and materials used by the temporary steel trestle structure are general and can be recycled, so that the construction efficiency is enhanced.
本发明涉及钢结构制作技术领域,尤其涉及一种能够供汽车吊行走,安全便捷,增加材料周转率的拱形拉索临时钢栈桥结构,该临时钢栈桥结构中,栈桥标准节之间以及拱形横梁和钢栈桥本体之间均采用螺栓连接,由于钢栈桥本体采用标准长度的栈桥标准节通过连接耳板和高强螺栓连接,可以通过现场实际增加钢栈桥本体长度,从而缩短了临时钢栈桥结构的施工工期,提高了临时钢栈桥结构循环使用次数,增加了材料周转率,从而降低了工程成本;且拱形梁结构的中部与钢栈桥本体之间由钢丝绳连接,从而使得临时钢栈桥结构承受荷载能力大大增强;且由于临时钢栈桥结构所用材料较为通用且可以循环利用,从而增强了施工工效。
Arched inhaul cable temporary steel trestle structure and construction method
The invention relates to the technical field of steel structure manufacturing, in particular to an arched inhaul cable temporary steel trestle structure which can allow a truck crane to walk, is safe and convenient to use and increases the material turnover rate, in the temporary steel trestle structure, trestle standard knots are connected through bolts, and an arched cross beam and a steel trestle body are connected through bolts. Due to the fact that the steel trestle body is formed by connecting the trestle standard knots with the standard length through the connecting lug plates and the high-strength bolts, the length of the steel trestle body can be actually increased on site, the construction period of the temporary steel trestle structure is shortened, the number of times of recycling of the temporary steel trestle structure is increased, the material turnover rate is increased, and the engineering cost is reduced; the middle part of the arched beam structure is connected with the steel trestle body through the steel wire rope, so that the load bearing capacity of the temporary steel trestle structure is greatly enhanced; and materials used by the temporary steel trestle structure are general and can be recycled, so that the construction efficiency is enhanced.
本发明涉及钢结构制作技术领域,尤其涉及一种能够供汽车吊行走,安全便捷,增加材料周转率的拱形拉索临时钢栈桥结构,该临时钢栈桥结构中,栈桥标准节之间以及拱形横梁和钢栈桥本体之间均采用螺栓连接,由于钢栈桥本体采用标准长度的栈桥标准节通过连接耳板和高强螺栓连接,可以通过现场实际增加钢栈桥本体长度,从而缩短了临时钢栈桥结构的施工工期,提高了临时钢栈桥结构循环使用次数,增加了材料周转率,从而降低了工程成本;且拱形梁结构的中部与钢栈桥本体之间由钢丝绳连接,从而使得临时钢栈桥结构承受荷载能力大大增强;且由于临时钢栈桥结构所用材料较为通用且可以循环利用,从而增强了施工工效。
Arched inhaul cable temporary steel trestle structure and construction method
一种拱形拉索临时钢栈桥结构及施工方法
LIU YANG (Autor:in) / LYU JINPENG (Autor:in) / TAO FUBING (Autor:in) / GU SHUANGSHUANG (Autor:in) / ZHANG WENQIANG (Autor:in) / ZHANG MINGTAO (Autor:in) / DUAN XIAOKUN (Autor:in)
27.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Arched reticulated shell inhaul-cable-free middle starting construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Fabricated temporary steel trestle for tunnel construction
Europäisches Patentamt | 2024
|Fabricated steel trestle structure and steel trestle construction method
Europäisches Patentamt | 2023
|