Frame type tower crane foundation structure overlapped with corridor and construction method of frame type tower crane foundation structure
The invention discloses a frame type tower crane foundation structure overlapped with a corridor and a construction method thereof, and belongs to the technical field of hoisting machinery. The tower crane foundation comprises an independent stepped foundation, frame columns, frame beams, a tower crane foundation top plate and embedded foundation bolts. The four independent stepped foundations are distributed on the bedrock in a rectangular vertex manner; the four frame columns are vertically arranged on the four independent stepped foundations respectively; the frame beams are arranged between the tops of every two frame columns; the tower crane foundation top plate comprises a top plate body and a top plate beam. The top plate body is fixed in a square area defined by the four frame beams. The top plate beam is arranged in the top plate body; the plurality of embedded foundation bolts are embedded in the tower crane foundation top plate; and the corridor is arranged below the top plate of the tower crane foundation, penetrates through the space between the frame columns and is overlapped with the tower crane foundation in space. Overlapped arrangement is formed, the occupied space is reduced, the tower crane coverage rate is increased, and meanwhile the gallery is protected.
本发明公开了一种与廊道重叠布置的框架式塔吊基础结构及其施工方法,属于起重机械技术领域,结构包括塔吊基础和廊道;塔吊基础包括独立阶型基础、框架柱、框架梁、塔吊基础顶板和预埋地脚螺栓;四个独立阶型基础呈矩形顶点分布在基岩上;四个框架柱分别竖直设置在四个独立阶型基础上;框架梁设置在每两根框架柱的顶部之间;塔吊基础顶板包括顶板本体和顶板梁;顶板本体固定在四根框架梁围成的四方形区域内;顶板梁设置在顶板本体内部;多个预埋地脚螺栓埋设在塔吊基础顶板内;廊道设置在塔吊基础顶板下方,从框架柱之间穿过,与塔吊基础在空间上重叠布置。本发明形成重叠布置,减少占用场地,提高塔吊覆盖率,同时为廊道提供保护。
Frame type tower crane foundation structure overlapped with corridor and construction method of frame type tower crane foundation structure
The invention discloses a frame type tower crane foundation structure overlapped with a corridor and a construction method thereof, and belongs to the technical field of hoisting machinery. The tower crane foundation comprises an independent stepped foundation, frame columns, frame beams, a tower crane foundation top plate and embedded foundation bolts. The four independent stepped foundations are distributed on the bedrock in a rectangular vertex manner; the four frame columns are vertically arranged on the four independent stepped foundations respectively; the frame beams are arranged between the tops of every two frame columns; the tower crane foundation top plate comprises a top plate body and a top plate beam. The top plate body is fixed in a square area defined by the four frame beams. The top plate beam is arranged in the top plate body; the plurality of embedded foundation bolts are embedded in the tower crane foundation top plate; and the corridor is arranged below the top plate of the tower crane foundation, penetrates through the space between the frame columns and is overlapped with the tower crane foundation in space. Overlapped arrangement is formed, the occupied space is reduced, the tower crane coverage rate is increased, and meanwhile the gallery is protected.
本发明公开了一种与廊道重叠布置的框架式塔吊基础结构及其施工方法,属于起重机械技术领域,结构包括塔吊基础和廊道;塔吊基础包括独立阶型基础、框架柱、框架梁、塔吊基础顶板和预埋地脚螺栓;四个独立阶型基础呈矩形顶点分布在基岩上;四个框架柱分别竖直设置在四个独立阶型基础上;框架梁设置在每两根框架柱的顶部之间;塔吊基础顶板包括顶板本体和顶板梁;顶板本体固定在四根框架梁围成的四方形区域内;顶板梁设置在顶板本体内部;多个预埋地脚螺栓埋设在塔吊基础顶板内;廊道设置在塔吊基础顶板下方,从框架柱之间穿过,与塔吊基础在空间上重叠布置。本发明形成重叠布置,减少占用场地,提高塔吊覆盖率,同时为廊道提供保护。
Frame type tower crane foundation structure overlapped with corridor and construction method of frame type tower crane foundation structure
一种与廊道重叠布置的框架式塔吊基础结构及其施工方法
CHEN HUANGJIE (Autor:in) / GUO CHANGCHENG (Autor:in) / WANG TIANLU (Autor:in) / AN XIAORUI (Autor:in) / DING JIAN (Autor:in) / XU SHAOFENG (Autor:in) / LIU ZHONG (Autor:in) / LI YAJUN (Autor:in)
27.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Tower crane foundation structure of construction-free tower crane pile
Europäisches Patentamt | 2024
|Method for arranging tower crane foundation and tower crane foundation structure
Europäisches Patentamt | 2023
|