Construction method of prefabricated wallboard
The invention provides a construction method of a prefabricated wallboard, which comprises the following steps of: supporting the prefabricated wallboard on a base layer of a bottom floor slab by using a plurality of adjustable supports, and binding and fixing steel bars at the top of the prefabricated wallboard and steel bars of a top floor slab; pouring a floor layer of a bottom floor slab, and constructing a functional structure in the room; wherein the adjustable support comprises a U-shaped support, a first connecting rod and a base, and the U-shaped support is arranged on the first connecting rod; the first connecting rod is movably connected with the base so as to change the distance between the U-shaped support and the base. According to the construction method, traditional construction procedures are changed, the construction efficiency is improved, construction can be completed on schedule, project delivery can be achieved, construction can be carried out orderly, and the construction method has great significance in guaranteeing the construction quality; the adjustable support is simple in structure, flexible to adjust, easy to operate and suitable for popularization, production and application.
本发明提供一种预制墙板的施工方法,其步骤包括:利用若干个可调支座将预制墙板支设于底部楼板的基层上,将预制墙板顶部的钢筋与顶部楼板的钢筋绑扎固定;进行底部楼板的地坪层浇筑,以及房间内部功能性结构的建设;其中所述的可调支座包括U形托、连杆一和底座,所述U形托设于所述连杆一上;所述连杆一活动连接所述底座,以改变所述U形托与所述底座的间距。本发明改变了传统的施工工序,提高施工效率,这样不仅能保证按期完成施工、实现工程交付,还能使施工有条不紊地进行,对保证施工质量具有重要意义;可调支座的结构简单、调节灵活、易于操作,适于推广生产及应用。
Construction method of prefabricated wallboard
The invention provides a construction method of a prefabricated wallboard, which comprises the following steps of: supporting the prefabricated wallboard on a base layer of a bottom floor slab by using a plurality of adjustable supports, and binding and fixing steel bars at the top of the prefabricated wallboard and steel bars of a top floor slab; pouring a floor layer of a bottom floor slab, and constructing a functional structure in the room; wherein the adjustable support comprises a U-shaped support, a first connecting rod and a base, and the U-shaped support is arranged on the first connecting rod; the first connecting rod is movably connected with the base so as to change the distance between the U-shaped support and the base. According to the construction method, traditional construction procedures are changed, the construction efficiency is improved, construction can be completed on schedule, project delivery can be achieved, construction can be carried out orderly, and the construction method has great significance in guaranteeing the construction quality; the adjustable support is simple in structure, flexible to adjust, easy to operate and suitable for popularization, production and application.
本发明提供一种预制墙板的施工方法,其步骤包括:利用若干个可调支座将预制墙板支设于底部楼板的基层上,将预制墙板顶部的钢筋与顶部楼板的钢筋绑扎固定;进行底部楼板的地坪层浇筑,以及房间内部功能性结构的建设;其中所述的可调支座包括U形托、连杆一和底座,所述U形托设于所述连杆一上;所述连杆一活动连接所述底座,以改变所述U形托与所述底座的间距。本发明改变了传统的施工工序,提高施工效率,这样不仅能保证按期完成施工、实现工程交付,还能使施工有条不紊地进行,对保证施工质量具有重要意义;可调支座的结构简单、调节灵活、易于操作,适于推广生产及应用。
Construction method of prefabricated wallboard
一种预制墙板的施工方法
WANG GUICHUAN (Autor:in) / GAO YAPING (Autor:in) / JIN SHENGBIN (Autor:in) / ZHANG RUIWEI (Autor:in)
27.02.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2016
|Prefabricated wallboard, wallboard system and construction method of wallboard system
Europäisches Patentamt | 2022
|Prefabricated wallboard connecting system and prefabricated wallboard
Europäisches Patentamt | 2024
|Prefabricated wallboard hoisting method and prefabricated wallboard hoisting tool
Europäisches Patentamt | 2023
|