Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mine slope greening drainage footpath construction method
The invention relates to the technical field of drainage footpaths, in particular to a mine slope greening drainage footpath construction method which comprises the steps of topographic survey, foundation treatment, cement step building, welding of extension plates at the bottoms of steps, arrangement of drainage pipes, arrangement of transverse channels and a plurality of grooves through a cutting machine and installation of water receiving tanks on the two sides. The one-way valve is installed on the water conveying pipe, the extension handle is used for controlling opening and closing of the one-way valve, water flow control is achieved, trees are planted on the two sides of the extension plate, the extension handle is rotated to regulate and control the water flow direction, and irrigation of the trees on the two sides of the steps is achieved; and finally, a rope net is arranged on the extension plate, and the stability of landfill is provided. According to the method, soil dumping is effectively avoided, drainage, greening and soil stability are comprehensively considered, and an effective solution is provided for comprehensive management of the mine slope.
本发明涉及排水步道技术领域,具体是一种矿山边坡绿化排水步道施工方法,包括地形勘察、基础处理、水泥台阶修筑,在台阶底部焊接延伸板,内设排水管,通过切割机设置横向渠和多条沟槽,两侧安装接水箱,水流汇集后通过输水管流至接水箱,接水管与排水管相连,输水管上安装单向阀,通过延伸把手控制单向阀开合,实现水流控制,延伸板两侧种植树木,通过转动延伸把手调控水流方向,实现对台阶两侧树木的灌溉,土壤覆盖在延伸板上方,低于延伸把手下方,确保其自由转动,最后,设置绳网在延伸板上,提供填埋的稳定性。本发明有效避免避免土壤倾泻,综合考虑了排水、绿化和土壤稳定性,为矿山边坡的综合管理提供了有效解决方案。
Mine slope greening drainage footpath construction method
The invention relates to the technical field of drainage footpaths, in particular to a mine slope greening drainage footpath construction method which comprises the steps of topographic survey, foundation treatment, cement step building, welding of extension plates at the bottoms of steps, arrangement of drainage pipes, arrangement of transverse channels and a plurality of grooves through a cutting machine and installation of water receiving tanks on the two sides. The one-way valve is installed on the water conveying pipe, the extension handle is used for controlling opening and closing of the one-way valve, water flow control is achieved, trees are planted on the two sides of the extension plate, the extension handle is rotated to regulate and control the water flow direction, and irrigation of the trees on the two sides of the steps is achieved; and finally, a rope net is arranged on the extension plate, and the stability of landfill is provided. According to the method, soil dumping is effectively avoided, drainage, greening and soil stability are comprehensively considered, and an effective solution is provided for comprehensive management of the mine slope.
本发明涉及排水步道技术领域,具体是一种矿山边坡绿化排水步道施工方法,包括地形勘察、基础处理、水泥台阶修筑,在台阶底部焊接延伸板,内设排水管,通过切割机设置横向渠和多条沟槽,两侧安装接水箱,水流汇集后通过输水管流至接水箱,接水管与排水管相连,输水管上安装单向阀,通过延伸把手控制单向阀开合,实现水流控制,延伸板两侧种植树木,通过转动延伸把手调控水流方向,实现对台阶两侧树木的灌溉,土壤覆盖在延伸板上方,低于延伸把手下方,确保其自由转动,最后,设置绳网在延伸板上,提供填埋的稳定性。本发明有效避免避免土壤倾泻,综合考虑了排水、绿化和土壤稳定性,为矿山边坡的综合管理提供了有效解决方案。
Mine slope greening drainage footpath construction method
一种矿山边坡绿化排水步道施工方法
ZHANG YUWEN (Autor:in) / WANG JIAXIN (Autor:in) / XIAO CHENHAO (Autor:in) / BAI YIHAN (Autor:in) / FANG QING (Autor:in)
01.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Fabricated curve hydrophilic footpath and hydrophilic footpath construction method
Europäisches Patentamt | 2021
|Brackets on a slope for extension footpath AND It's construction method
Europäisches Patentamt | 2018
|