Light hole edge protection method
The invention discloses a light hole edge protection method, and relates to the technical field of building construction, and the construction method comprises the following steps: S10, after a field environment is determined, arranging formwork erecting vertical rods between a basement top plate and a basement bottom plate; s20, formwork erecting vertical rods are built according to the design drawing; s30, the formwork erecting vertical rods are protected and reinforced; s40, surveying and setting out are conducted according to a basement roof hole; s50, the galvanized square tube is cut according to the specification through a cutting machine; s60, the cut galvanized square tube is installed to form a protection structure; and S70, removing the edge protection of the hole. The construction method has the beneficial effects that personnel and equipment can be effectively prevented from falling from the hole, the repeated utilization rate is high, the burden of workers and the installation difficulty are reduced, and the construction speed and flexibility are also improved.
本发明公开了一种轻型洞口临边防护方法,涉及建筑施工技术领域,该施工方法包括以下步骤:S10:确定现场环境后,排版地下室顶板与地下室底板之间的支模立杆的排布;S20:根据设计图纸,搭建支模立杆;S30:对支模立杆进行防护加固;S40:根据地下室顶板洞口进行测量放线;S50:利用切割机按规格对镀锌方通进行切割;S60:安装切割好的镀锌方通形成防护结构;S70:洞口临边防护拆除。本发明的有益效果是:可以有效防止人员和设备从洞口坠落,且重复使用率高,不仅减轻了工作人员的负担和安装的难度,也提高了搭建速度和灵活性。
Light hole edge protection method
The invention discloses a light hole edge protection method, and relates to the technical field of building construction, and the construction method comprises the following steps: S10, after a field environment is determined, arranging formwork erecting vertical rods between a basement top plate and a basement bottom plate; s20, formwork erecting vertical rods are built according to the design drawing; s30, the formwork erecting vertical rods are protected and reinforced; s40, surveying and setting out are conducted according to a basement roof hole; s50, the galvanized square tube is cut according to the specification through a cutting machine; s60, the cut galvanized square tube is installed to form a protection structure; and S70, removing the edge protection of the hole. The construction method has the beneficial effects that personnel and equipment can be effectively prevented from falling from the hole, the repeated utilization rate is high, the burden of workers and the installation difficulty are reduced, and the construction speed and flexibility are also improved.
本发明公开了一种轻型洞口临边防护方法,涉及建筑施工技术领域,该施工方法包括以下步骤:S10:确定现场环境后,排版地下室顶板与地下室底板之间的支模立杆的排布;S20:根据设计图纸,搭建支模立杆;S30:对支模立杆进行防护加固;S40:根据地下室顶板洞口进行测量放线;S50:利用切割机按规格对镀锌方通进行切割;S60:安装切割好的镀锌方通形成防护结构;S70:洞口临边防护拆除。本发明的有益效果是:可以有效防止人员和设备从洞口坠落,且重复使用率高,不仅减轻了工作人员的负担和安装的难度,也提高了搭建速度和灵活性。
Light hole edge protection method
一种轻型洞口临边防护方法
ZHANG HUI (Autor:in) / ZHANG QIUYANG (Autor:in) / YAO YUNTENG (Autor:in) / XIE JIANBO (Autor:in) / HUANG HE (Autor:in) / WEI LIYA (Autor:in)
01.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Protection device and protection method for edge hole
Europäisches Patentamt | 2021