Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dredging equipment for river channel construction
The invention relates to dredging equipment for river channel construction. Comprising a slurry storage device and a desilting device; the mud storage device comprises a floating box, a mud tank and a transfer mud groove are installed on the floating box, a transfer mud pump, an injection pipe and an exhaust valve are installed at the top of the mud tank, a supporting arm and a rubber pipe supported by the supporting arm are further installed at the top of the mud tank, and the inner end of the rubber pipe is connected with an inlet of the transfer mud pump; the desilting device comprises a vehicle body, a front walking wheel set and a rear walking wheel set are installed on the vehicle body, a walking driving assembly is installed in the vehicle body, a conveying pipeline is installed on the top, a bucket is installed on the front portion, and a mud suction pipeline is installed at the front end of the conveying pipeline. A lifting slurry pump is installed at the rear end of the conveying pipeline, a lifting pipeline is connected to an outlet of the lifting slurry pump, and the upper end of the lifting pipeline extends upwards from a groove formed in the middle of the rear portion of the buoyancy tank to the position above the buoyancy tank and is connected with a transfer slurry tank through a connecting hose. The desilting device is reasonable in structural design and high in desilting efficiency.
本发明涉及一种河道施工的清淤设备。包括泥浆储存装置和清淤装置;泥浆储存装置包括浮箱,在浮箱上安装有泥浆罐以及中转泥浆槽,在泥浆罐的顶部安装有转移泥浆泵、注入管及排气阀,在泥浆罐的顶部还安装有支臂及由支臂支撑的胶管,胶管的内端与转移泥浆泵的入口连接;清淤装置包括车体,在车体上安装有前后两组行走车轮,在车体的内部安装有行走驱动组件、顶部安装有输送管道、前部安装有铲斗,在输送管道的前端安装有吸泥管道,在输送管道的后端安装有提升泥浆泵且在提升泥浆泵的出口连接有提升管道,提升管道的上端由设置在浮箱后部中部的凹槽向上延伸至浮箱的上方并且通过连接软管与中转泥浆槽连接。本发明结构设计合理,清淤效率高。
Dredging equipment for river channel construction
The invention relates to dredging equipment for river channel construction. Comprising a slurry storage device and a desilting device; the mud storage device comprises a floating box, a mud tank and a transfer mud groove are installed on the floating box, a transfer mud pump, an injection pipe and an exhaust valve are installed at the top of the mud tank, a supporting arm and a rubber pipe supported by the supporting arm are further installed at the top of the mud tank, and the inner end of the rubber pipe is connected with an inlet of the transfer mud pump; the desilting device comprises a vehicle body, a front walking wheel set and a rear walking wheel set are installed on the vehicle body, a walking driving assembly is installed in the vehicle body, a conveying pipeline is installed on the top, a bucket is installed on the front portion, and a mud suction pipeline is installed at the front end of the conveying pipeline. A lifting slurry pump is installed at the rear end of the conveying pipeline, a lifting pipeline is connected to an outlet of the lifting slurry pump, and the upper end of the lifting pipeline extends upwards from a groove formed in the middle of the rear portion of the buoyancy tank to the position above the buoyancy tank and is connected with a transfer slurry tank through a connecting hose. The desilting device is reasonable in structural design and high in desilting efficiency.
本发明涉及一种河道施工的清淤设备。包括泥浆储存装置和清淤装置;泥浆储存装置包括浮箱,在浮箱上安装有泥浆罐以及中转泥浆槽,在泥浆罐的顶部安装有转移泥浆泵、注入管及排气阀,在泥浆罐的顶部还安装有支臂及由支臂支撑的胶管,胶管的内端与转移泥浆泵的入口连接;清淤装置包括车体,在车体上安装有前后两组行走车轮,在车体的内部安装有行走驱动组件、顶部安装有输送管道、前部安装有铲斗,在输送管道的前端安装有吸泥管道,在输送管道的后端安装有提升泥浆泵且在提升泥浆泵的出口连接有提升管道,提升管道的上端由设置在浮箱后部中部的凹槽向上延伸至浮箱的上方并且通过连接软管与中转泥浆槽连接。本发明结构设计合理,清淤效率高。
Dredging equipment for river channel construction
一种河道施工的清淤设备
ZHANG YI (Autor:in) / LI MIAO (Autor:in) / SUESO (Autor:in) / AN HUA (Autor:in) / LU ZHONGZHONG (Autor:in) / ZHANG JI (Autor:in) / LI JUNQIANG (Autor:in) / ZHOU YONGFU (Autor:in) / QIN QI (Autor:in) / ZHANG HAOXI (Autor:in)
08.03.2024
Patent
Elektronische Ressource
Chinesisch